Most construction projects inside Union City, Georgia require a city building permit, and work cannot begin until the permit is issued.1 Union City administers its own zoning, while the Fulton County Board of Health permits and inspects septic systems where public sewer is unavailable.23
At a glance
- Building permit
- Required for most construction projects inside Union City1
- Zoning
- Administered by Union City, with district-specific uses and dimensions24
- Septic
- Fulton County Board of Health permits and inspects systems where public sewer is unavailable35
- Owner-builder
- Available with Union City's homeowner affidavit and its conditions6
- RV living
- Not confirmed; ask Community Development before occupying an RV on a parcel2
- Tiny home
- Must satisfy Georgia building codes and Union City siting and zoning rules72
- Private well
- Use a licensed well contractor and notify county health before drilling8
Who to call
Building permits
Union City Community Development
Building permit applications, plan submission, status tracking and building inspections inside Union City
5041 Union St, Union City, GA 30291
Septic permits
Fulton County Board of Health Environmental Health Services
On-site sewage management system permitting and inspections for Fulton County properties not served by public sanitary sewer
10 Park Place S.E. | Atlanta, GA 30303
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Union City means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Union City, Georgia?
Yes. Most construction projects inside Union City require a building permit obtained by the property owner or a licensed and bonded contractor acting for the owner, and work may start only after issuance.1 Georgia's mandatory construction codes also apply statewide, even when local enforcement arrangements vary.9
Union City publishes a fee schedule; the listed residential new-construction building permit charge is $0.25 per square foot.10 Fees can change, so confirm the current amount before budgeting. The city also requires inspections for permitted work, scheduled through its online portal with the permit number and contractor code.11
Who issues building permits in Union City, Georgia?
Union City Community Development is the building-permit and inspection contact for projects inside the city, not Fulton County's unincorporated-area permit office.1 Applicants can use the city's online system to submit building and trade permit applications, upload plans, pay invoices, track status, handle resubmittals and schedule inspections.12
An owner-builder route is available, but Union City's affidavit says the applicant must hold title, plan to use the property as a primary residence, perform the construction and not sell for 2 years.6 Electrical, plumbing, heating and air-conditioning work still needs the required licenses and permits.6 Contact Union City Community Development before filing if the project scope or contractor licensing is uncertain.13
Does Union City have zoning, and what does it mean for homes?
Union City has its own zoning ordinance with residential, manufactured-home, commercial, industrial, overlay and other districts, so the parcel's mapped district controls the answer.24 In the R-1 district, a single-family detached dwelling needs at least 2,000 square feet of floor area on a lot of at least 43,560 square feet.1415 R-1 setbacks are 75 feet in front, 50 feet in the rear and 25 feet on each side.16
Those R-1 figures are not citywide minimums. The R-3 checklist, for example, gives a 1,600-square-foot minimum dwelling area and a 17,000-square-foot lot area, so buyers should verify the parcel's district before using any dimensional standard.1718
How do septic permits work inside Union City?
The Fulton County Board of Health Environmental Health Services program permits and inspects on-site sewage systems for properties that are not served by public sanitary sewer, including addresses inside Union City.3 Obtain county health approval before installing a septic system; the Board of Health reviews and inspects the installation and individual drinking-water supplies.195 The system cannot be backfilled or used until the County Board of Health completes its final inspection and gives written approval.20
Georgia requires connection to a public or community sewer when service is available within 200 feet of the property line or in an abutting public right-of-way.21 For a Union City sewer project, Fulton County permits and inspects only after receiving a city letter indicating awareness and authorization.22
Can you live in an RV or tiny home in Union City?
We could not confirm a Union City rule allowing long-term RV occupancy or temporary camping on private land. Ask Union City Community Development for a written zoning determination before buying land or connecting utilities, because Union City regulates uses through parcel-specific zoning districts.2
A site-built or modular tiny home is treated as a dwelling under Georgia building codes and must also receive local siting approval under Union City's zoning rules.7 The city's district dimensions can rule out a small dwelling even when the structure itself meets a building code; for example, the R-1 district requires at least 2,000 square feet of floor area.14 Manufactured homes are expressly permitted in the MHP district, subject to an approved development plan and the district's utility and dimensional conditions.23
Building a home in Union City: what are the steps?
- Confirm that the parcel is inside Union City and obtain its zoning district from Community Development, because permitted uses, lot size and setbacks vary by district.4
- Verify water and sewer availability; if public sewer is unavailable, contact Fulton County Environmental Health before site development for septic review.19
- Prepare plans that satisfy Georgia's mandatory construction codes and Union City's zoning requirements.92
- Submit the building permit application and plans through Union City's online system, then pay the required fee.12
- Do not start work until Union City issues the building permit.1
- Schedule required building inspections through the city portal and obtain final septic approval before backfilling or using an on-site system.115
What should you check before buying land in Union City?
Start with the parcel's city limits, zoning district and recorded lot dimensions; Union City's residential standards differ substantially by district.4 Confirm sewer availability early, because Georgia requires a sewer connection when qualifying service is within 200 feet of the property line or in an abutting public right-of-way.21 If a private well is contemplated, a licensed water-well contractor must install it and notify the county health department before drilling.8
For conventional septic drain fields, 59.4% of Fulton County soils are rated without severe limitations, but that countywide figure cannot replace a parcel-specific site evaluation.24 Fulton County's effective property-tax rate is about 0.9%, with a median annual property-tax bill of $3,847; verify the actual parcel assessment and city charges before closing.2526
Watch-outs
- Union City announced a 180-day moratorium adopted on March 24, 2026 that affects acceptance, processing and approval of zoning-map amendments, text amendments and conditional-use applications; ask Community Development whether it remains in effect before pursuing one of those applications.13
- Union City's published R-1 and R-3 dimensional standards differ, so do not apply one district's minimum home size, lot area or setbacks to another parcel.1417
- We could not confirm Union City's rules for RV residence, temporary camping or accessory dwellings; request a written answer from Community Development for the specific parcel.2
Sources
- Building Permits (Commercial & Residential) (Union City), quoted and re-checked
- Union City Zoning Ordinance (Union City), quoted and re-checked
- Land-use - Fulton County Board of Health, quoted and re-checked
- Planning and Zoning (Union City), quoted and re-checked
- Land-use - Fulton County Board of Health, quoted and re-checked
- Homeowner Affidavit (Union City), quoted and re-checked
- Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
- Well Water (Union City), quoted and re-checked
- Mandatory and Permissive State Codes (Union City), quoted and re-checked
- City of Union City Combined Fee Schedule (Union City), quoted and re-checked
- Building Permits (Commercial & Residential) (Union City), quoted and re-checked
- Building Permit Forms and Applications (Union City), quoted and re-checked
- Union City Community Development (unioncityga.gov)
- Union City Zoning Ordinance (Union City), quoted and re-checked
- Union City Zoning Ordinance (Union City), quoted and re-checked
- Union City Zoning Ordinance (Union City), quoted and re-checked
- Preliminary Plat-Review Checklist (Union City), quoted and re-checked
- Preliminary Plat-Review Checklist (Union City), quoted and re-checked
- Land-use - Fulton County Board of Health, quoted and re-checked
- Rule 511-3-1 On-Site Sewage Management Systems (Union City), quoted and re-checked
- Rule 511-3-1 On-Site Sewage Management Systems (Union City), quoted and re-checked
- Public Works Permitting Process, quoted and re-checked
- Union City Zoning Ordinance (Union City), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.