Building permits, zoning and land rules in Palmetto, Georgia

Palmetto, Georgia requires a zoning compliance permit before a building or structure is erected, altered or moved, and City Hall receives building-permit applications.12 Palmetto administers zoning inside the city, while the Fulton County Board of Health permits and inspects septic systems where public sewer is unavailable.34

At a glance

Building permit
City Hall receives applications; zoning compliance is required before erecting, altering or moving a structure12
Zoning
Palmetto zoning applies throughout the incorporated city3
Septic permit
Required through the County Health Department when an onsite sewage system will be used54
RV living
Not allowed as a dwelling; a narrow temporary occupancy exception applies67
Tiny home
No separate city rule confirmed; district size standards and building codes still apply89
Owner-builder
Georgia waives contractor licensure for an owner building a personal home, but not local approvals10
Private well
Use a licensed well contractor, who must notify the county health department before drilling11

Who to call

Building permits

City of Palmetto Community Development Department

Palmetto building-permit applications, plan review and inspection scheduling

770-463-3377

[email protected]

P.O. Box 190, 509 Toombs Street | Palmetto, GA 30268

Planning & zoning

City of Palmetto Planning

Palmetto zoning questions, applications and parcel-specific planning guidance

770-463-3377

[email protected]

P.O. Box 190, 509 Toombs Street | Palmetto, GA 30268

Septic permits

Fulton County Board of Health, Environmental Health Services

Permits and inspects onsite sewage systems and reviews individual water supplies in Fulton County

770-520-7500

10 Park Place Health Center, 10 Park Place S.E., Atlanta, GA 30303

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Palmetto means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Palmetto, Georgia?

Before erecting, altering or moving a building, structure or sign in Palmetto, the owner must obtain a zoning compliance permit from the zoning administrator.1 Palmetto City Hall also receives all building-permit applications, and most projects costing $5,000 or more require plan review.2 The city page identifies the International Building Code 2018, while Georgia's mandatory construction codes apply statewide whether or not they are locally enforced.1213

The available city material does not establish every technical building-permit exception, so ask Community Development to classify the exact work before starting.14 New or altered buildings cannot be occupied until Palmetto issues a certificate of occupancy after construction is complete.15

Who issues building permits in Palmetto, and how do you apply?

Palmetto City Hall is the local building-permit counter, and the City of Palmetto Community Development Department handles applications, plan review and inspection scheduling.2 Call 770-463-3377, email [email protected] for inspection scheduling, or visit 509 Toombs Street in Palmetto.2 Contractors and the plumbing, electrical, and heating and air trades must include a current business license and state card with the application.2

Ask City Planning separately to confirm the zoning district, allowed use and zoning application before finalizing construction drawings.16 Palmetto's zoning fee schedule is established by the mayor and council, is available to the public, and is kept in the zoning administrator's office; the reviewed ordinance does not state each current amount.17 Land clearing, grading, filling and similar disturbance also require a land-disturbance permit before work begins.18

Does Palmetto have zoning, and what does it mean for a homesite?

Palmetto's zoning ordinance applies to all land within the incorporated city limits.3 Residential districts include RR, R-1, R-2, R-4, R-5, R-6, R-3A and R-3B, and the applicable district controls uses and dimensions.19

For example, an R-3A lot subject to the form-based standards has a minimum area of 5,000 square feet and minimum width of 50 feet, while an R-3B lot has a minimum area of 10,000 square feet and minimum width of 90 feet.2021 R-3A generally uses a front required building line of 15 to 20 feet where no established dimension exists, plus a 25-foot rear yard; R-3B uses a front line of 25 to 30 feet and a 40-foot rear yard.2223 These figures do not apply citywide, so obtain the parcel's district and written standards from Planning.16

How do septic permits work inside Palmetto?

A Palmetto property using an onsite sewage system needs a construction permit from the County Health Department before physical development of the lot or installation of the system begins.5 The Fulton County Board of Health Environmental Health Services program permits and inspects onsite sewage systems where public sanitary sewer is unavailable.2425

Keep septic approval separate from the city's building and zoning approvals: call Fulton County Environmental Health at 770-520-7500 for the site review and inspection path.26 Georgia requires connection to an available public or community sewage system when it lies within 200 feet of the property line or in an abutting public right-of-way.27 Fulton County does not ordinarily permit or inspect a sewer project whose connection point is inside Palmetto; ask the city which utility authority handles the connection before designing the system.28 In Palmetto's R-4 manufactured-home community district, public water and sanitary sewer are required.29 About 59.4% of mapped Fulton County soils avoid severe limitations for a conventional drain field, but only parcel-level review can establish a workable system location.30

Can you live in an RV or tiny home in Palmetto?

Palmetto does not allow a recreational vehicle, tent or other temporary structure to be used as a dwelling in any zoning district.6 A narrow exception allows RV occupancy for up to 48 hours when the vehicle has sleeping accommodations, sits on a residential-district lot, and is used by the lot owner or the owner's guests.7 Using an RV or mobile home as a dwelling on a city street, alley, highway or other public place is unlawful.31

We could not confirm a separate Palmetto tiny-home category. A site-built or modular tiny home remains subject to Georgia building codes and local siting approval, while Palmetto requires a dwelling to meet the minimum floor area and other standards of its zoning district.98 A garage or accessory building cannot be occupied as a dwelling.32

Building a home in Palmetto: what are the steps?

  1. Ask Palmetto Planning to confirm the parcel's zoning district, allowed dwelling type, lot size, setbacks, utilities and required zoning application.316
  2. If public sewer is unavailable, obtain the County Health Department's onsite sewage construction permit before physical development begins.5
  3. File the building-permit application at Palmetto City Hall and include the trade credentials the city requires.2
  4. Obtain the zoning compliance permit before erecting, altering or moving the building, and secure a land-disturbance permit before clearing, grading or filling.118
  5. Schedule city building inspections through Community Development and county septic inspections through Environmental Health.225
  6. Obtain Palmetto's certificate of occupancy after construction is complete and before using the home.15

What should you check before buying land in Palmetto?

Confirm that the parcel is inside Palmetto and obtain its zoning district, allowed residential use, lot dimensions, setbacks and minimum dwelling area before relying on a listing description.38 Ask the city whether public water and sewer are available, because some districts require both services and the city may compel connection when service is made available.2933 Fulton County does not ordinarily permit or inspect sewer projects with connection points inside Palmetto, so confirm the responsible utility authority with the city.28

If sewer is unavailable, make county septic review a purchase condition; Fulton County soils vary, and a countywide soil statistic cannot approve an individual homesite.3034 Confirm legal road access because city lots with a building or dwelling must have frontage on a public street, private street or approved access easement, and residential driveways must meet city engineering standards.3536 Fulton County's effective property-tax rate is about 0.9%, with a median annual property-tax bill near $3,847.3738

Watch-outs

  • Do not plan to live in an RV while building in Palmetto; the city prohibits temporary structures as dwellings except for the narrow 48-hour RV occupancy allowance.67
  • Lot size and setbacks depend on the Palmetto zoning district, so R-3A or R-3B dimensions cannot be applied to a parcel in another district.2021
  • Building and zoning approvals come from Palmetto, but septic-system permitting and inspection remain with Fulton County Environmental Health where public sewer is unavailable.2163934

Sources

  1. Code of Ordinances: Appendix B Zoning, Article 21 Administration and Enforcement (Palmetto), quoted and re-checked
  2. City of Palmetto Community Development Department (citypalmetto.com)
  3. Palmetto Zoning Ordinance, Division I (Palmetto), quoted and re-checked
  4. Land-use - Fulton County Board of Health, quoted and re-checked
  5. On-Site Sewage Management Systems Manual (Palmetto), quoted and re-checked
  6. Palmetto Code of Ordinances, Appendix B, Article 13, Sec. 13-3 (Palmetto), quoted and re-checked
  7. Palmetto Code of Ordinances, Appendix B, Article 13, Sec. 13-4 (Palmetto), quoted and re-checked
  8. Dwellings (Palmetto), quoted and re-checked
  9. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  10. Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
  11. Well Water (Palmetto), quoted and re-checked
  12. Building | Palmetto GA (Palmetto), quoted and re-checked
  13. Georgia DCA Mandatory and Permissive State Codes (Palmetto), quoted and re-checked
  14. Palmetto Zoning Ordinance, Sec. 21-2 and 21-4 (Palmetto), quoted and re-checked
  15. Code of Ordinances: Appendix B Zoning, Article 21 Administration and Enforcement (Palmetto), quoted and re-checked
  16. City of Palmetto Planning (citypalmetto.com)
  17. Code of Ordinances: Appendix B Zoning, Article 21 Administration and Enforcement (Palmetto), quoted and re-checked
  18. Palmetto Zoning Ordinance, Sec. 21-2 and 21-4 (Palmetto), quoted and re-checked
  19. Palmetto Code of Ordinances, Appendix B, Article 25, Sec. 25-7 (Palmetto), quoted and re-checked
  20. Palmetto Code, Sec. 10-3. Residential form-based districts (Palmetto), quoted and re-checked
  21. Residential form-based districts (R-3A and R-3B) (Palmetto), quoted and re-checked
  22. Palmetto Code, Sec. 10-3. Residential form-based districts (Palmetto), quoted and re-checked
  23. Residential form-based districts (R-3A and R-3B) (Palmetto), quoted and re-checked
  24. Land-use - Fulton County Board of Health, quoted and re-checked
  25. Land-use - Fulton County Board of Health, quoted and re-checked
  26. Fulton County Board of Health, Environmental Health Services (fultoncountyboh.com)
  27. GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
  28. Public Works Permitting Process, quoted and re-checked
  29. Palmetto Zoning Ordinance, Sec. 7-1 (Palmetto), quoted and re-checked
  30. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  31. Parking and storage (Palmetto), quoted and re-checked
  32. Palmetto Zoning Ordinance, Sec. 13-3 (Palmetto), quoted and re-checked
  33. Part I. Charter (Palmetto), quoted and re-checked
  34. Land-use: Waste Management Septic Inspection, quoted and re-checked
  35. Palmetto Zoning Ordinance, Sec. 13-2 (Palmetto), quoted and re-checked
  36. library.municode.com (Palmetto), quoted and re-checked
  37. Effective property tax rate: Bolthole Index county data
  38. Median property tax bill: Bolthole Index county data
  39. Land-use: Waste Management Septic Inspection, quoted and re-checked

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Palmetto

Palmetto’s own rules

  • Building permitLimited

    Erection, alteration, or movement of buildings, structures, or signs and commencement of uses inside Palmetto city, as a zoning-compliance prerequisite.

    • This source establishes a zoning compliance permit, not the complete technical building-permit regime.
    • The permit must be issued before commencing the work or use.
    • A variance or court order is an exception to conformity requirements.
    “zoning compliance permit has been issued”
    One more reviewed finding on this topic
    • Required — Erection, alteration, or moving of a building or structure inside Palmetto city limits.
      “No building, structure or sign shall be erected, altered, or moved, and no use shall be commenced, unless a zoning compliance permit has been issued by the zoning administrator prior to commencing that work or use.”
  • Building code adoptedPartial

    Single-family dwellings, including manufactured homes, inside Palmetto city limits.

    • The dwelling must comply with applicable building, electrical, plumbing, fire, energy and similar codes adopted by the city.
    • Different federal or state construction standards apply when required by law.
    “The dwelling unit shall comply with all applicable building, electrical, plumbing, fire, energy and other similar codes which are or may be adopted by the city; provided, however, that if a dwelling unit is required by law to comply with any federal or state standards or regulations for construction which are different than those imposed by city codes, then those applicable state or federal standards or regulations shall apply.”
    One more reviewed finding on this topic
    • Adopted — Building-code administration in Palmetto city.
      “Palmetto follows the International Building Code (IBC) 2018.”
  • InspectionsLimited

    Manufactured homes proposed as single-family dwellings in Palmetto outside manufactured-home communities.

    • The building inspector or designee inspects the manufactured home and must find it in excellent condition and safe and fit for residential occupancy.
    • Other construction inspection requirements were not established from the opened sources.
    “If the dwelling unit is a manufactured home, the manufactured home must either be new and certified by the manufacturer and/or appropriate inspection agency as meeting the Mobile Home Construction and Safety Standards of the U.S. Department of Housing and Urban Development, as amended, or any similar successor or replacement standards which may be promulgated, or used and certified by the manufacturer and/or appropriate inspection agency as meeting the HUD standards, and found, on inspection by the building inspector or his designee, to be in excellent condition and safe and fit for residential occupancy.”
  • Certificate of occupancyRequired

    Buildings or structures erected or altered after adoption of the Palmetto zoning ordinance.

    • The certificate is issued upon completion of construction.
    • It certifies compliance with zoning, use, parking, landscaping, required improvements, and imposed conditions.
    “No building or structure erected or altered after the date of adoption of this ordinance shall be occupied or used unless and until a certificate of occupancy has been issued for that building or structure upon completion of construction. A certificate of occupancy shall constitute certification that the building, structure, use, parking, landscaping and all other required improvements fully comply with the applicable provisions of the zoning ordinance and any conditions of approval that may have been imposed by the city.”
    3 more reviewed findings on this topic
    • Required — Buildings and structures erected or altered after adoption of the zoning ordinance inside Palmetto city.
      “No building or structure erected or altered after the date of adoption of this ordinance shall be occupied or used unless and until a certificate of occupancy has been issued for that building or structure upon completion of construction.”
    • Required — A building or structure erected or altered after adoption of Palmetto's zoning ordinance.
      “No building or structure erected or altered after the date of adoption of this ordinance shall be occupied or used unless and until a certificate of occupancy has been issued for that building or structure upon completion of construction.”
    • Required — Buildings and structures erected or altered after adoption of the zoning ordinance inside Palmetto city.
      “certificate of occupancy has been issued”
  • Local zoningPresent (with conditions)

    Land inside Palmetto city limits.

    • District and use requirements in the City of Palmetto Zoning Ordinance apply.
    “Ordinance. The City of Palmetto Zoning Ordinance.”
    2 more reviewed findings on this topic
    • Present — Land inside Palmetto city limits; Palmetto has and administers a municipal zoning ordinance.
      “Ordinance. The City of Palmetto Zoning Ordinance.”
    • Present — All land within the incorporated limits of Palmetto city.
      “This ordinance shall apply to all areas within the incorporated limits of the City of Palmetto.”
  • Zoning districtsPublished

    Zoning districts inside Palmetto city limits, including RR, R-1, R-2, R-4, R-5, R-6, R-3A and R-3B.

    • District-specific dimensional and use requirements apply.
    • The opened code identifies residential districts and provides standards for R-3A, R-3B, R-4, R-5 and R-6.
    “Residential district. The conventional districts, including RR, R-1, R-2, R-4, R-5 and R-6; and the form-based districts, R-3A and R3-B.”
    One more reviewed finding on this topic
  • Minimum dwelling sizeDistrict specific (with conditions)

    Single-family dwellings inside Palmetto city limits, including manufactured homes, where the applicable zoning district has a minimum residential floor-area requirement.

    • The exact minimum residential floor area depends on the applicable zoning district.
    • All other zoning and building-code requirements also apply.
    “The dwelling unit shall comply with all restrictions and requirements of this ordinance, including, without limitation, the minimum lot area, minimum lot width, minimum residential floor area, required yard and maximum building height requirements of the zoning district in which it is located.”
  • Minimum lot sizeSpecified

    Residential R-3A District inside Palmetto city.

    • The cited form-based residential standards apply to properties with frontage on existing streets as shown on the Regulating Plan.
    • Lots created after the effective date of the ordinance are subject to Section 10-7.

    minimum lot area: >= 5000 square feet · maximum lot area: <= 8000 square feet · minimum lot width: >= 50 feet

    “R-3A District: Min. 5,000 sq. ft.; max. 8,000 sq. ft. [...] R-3A District: 50 ft.”
  • SetbacksSpecified

    Residential R-3A District inside Palmetto city.

    • Front RBL is generally 15 to 20 feet where no established dimension exists; an average existing setback applies where required by the section.
    • On corner lots the RBL applies on both frontages.
    • The section contains additional projection and driveway rules.

    front RBL: 15-20 feet (where no established dimension exists) · side yard one side: >= 5 feet · side yards total: >= 13 feet · rear yard: >= 25 feet

    “Where there is no established dimension, the RBL shall be between 15 ft. and 20 ft. [...] R-3A District: Min. 5 ft. on one side; 13 ft. total of both sides. [...] R-3A District: Min. 25 ft.”
  • Living in an RVTemporary only (with conditions)

    Recreational-vehicle occupancy inside Palmetto city limits.

    • Occupancy is allowed for up to 48 hours only when the vehicle contains sleeping accommodations, is parked on a residential lot, and is used by the lot owner or the owner's guests.
    • Using a mobile home or recreational vehicle as a dwelling on a city street, alley, highway, or other public place is unlawful.

    maximum temporary occupancy: <= 48 hours (Vehicle must contain sleeping accommodations, be parked on a lot in a residential district, and be used by the lot owner or guests.)

    “It shall be unlawful for any person to park or cause to be parked any mobile home or recreational vehicle on any street, alley, highway, or other public place in the city and to use the same as a dwelling. This provision shall not prohibit the temporary occupancy for periods up to 48 hours of a recreational vehicle; provided the recreational vehicle contains sleeping accommodations, is parked on a lot in a residential district, and is for the use of the owner of that lot or guests of the owner.”
    2 more reviewed findings on this topic
    • Limited — Recreational-vehicle occupancy on land inside Palmetto city.
      “temporary occupancy for periods up to 48 hours”
    • Limited — Use of a mobile home or recreational vehicle as a dwelling on public places, streets, alleys or highways inside Palmetto city limits.
      “It shall be unlawful for any person to park or cause to be parked any mobile home or recreational vehicle on any street, alley, highway, or other public place in the city and to use the same as a dwelling. This provision shall not prohibit the temporary occupancy for periods up to 48 hours of a recreational vehicle; provided the recreational vehicle contains sleeping accommodations, is parked on a lot in a residential district, and is for the use of the owner of that lot or guests of the owner.”
  • Camping on your landLimited

    Temporary camping or temporary occupancy in tents or recreational vehicles inside Palmetto city.

    • No cabin, garage, basement, tent, recreational vehicle, or other temporary structure may be used in whole or in part for dwelling purposes in any district.
    • A manufactured home may be used as a temporary dwelling for no more than six months only after zoning-administrator permit approval and only upon the listed emergency and hardship conditions.
    • An RV exception allows temporary occupancy up to 48 hours under Sec. 13-4.B.

    manufactured-home temporary dwelling maximum: <= 6 months (zoning-administrator permit and emergency, hardship, health/safety, sanitary-sewer, potable-water, and removal conditions) · RV temporary occupancy maximum: <= 48 hours (residential-district lot; sleeping accommodations; owner or owner guests)

    “No cabin, garage, basement, tent, recreational vehicle, or other temporary structure”
    One more reviewed finding on this topic
    • Prohibited — Using a tent or other temporary structure for dwelling purposes in any Palmetto zoning district.
      “No cabin, garage, basement, tent, recreational vehicle, or other temporary structure shall be used in whole or in part for dwelling purposes in any district; provided a manufactured home may be used as a temporary dwelling for a period not to exceed six months upon application to and approval of a permit for such occupancy by the zoning administrator upon determination that the following conditions exist and are met:”
  • Manufactured homesAllowed (with conditions)

    Manufactured-home occupancy as a single-family dwelling inside Palmetto city.

    • The home must meet HUD or successor standards and pass city inspection when used.
    • It must comply with applicable building, electrical, plumbing, fire, energy, and similar codes.
    • It must comply with district lot area, width, floor-area, yard, and height requirements.
    • Wheels must be removed; the home must be attached to a permanent continuous foundation enclosing the chassis, undercarriage, and towing mechanism; and it must be installed under manufacturer and Georgia anchoring requirements.

    minimum core living area: 20 feet by 30 feet · storage area: >= 120 square feet

    “If the dwelling unit is a manufactured home”
  • Accessory dwellingsLimited

    Use of garages or accessory buildings as dwellings inside Palmetto city limits.

    • The source does not resolve whether an attached accessory dwelling unit is allowed; it directly prohibits dwelling use of buildings erected as garages or accessory buildings.
    “Buildings erected as garages or accessory buildings shall not be occupied for dwelling purposes.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Development in Palmetto's R-4 Manufactured Home Community District.

    • The R-4 district permits densities up to six units per acre.
    • The source states that public water and sanitary sewer are required.
    “Densities up to six units per acre are permitted and public water and sanitary sewer are required.”
    2 more reviewed findings on this topic
    • Conditional — Water and sewer connections for property inside Palmetto city when city service is made available.
      “and may compel citizens to tap into same when such service is made available.”
    • Water and sewer (with conditions) — Development in Palmetto's R-5 Medium Density Residential District.
      “Land within this district will be served by public sanitary sewer and water facilities.”
  • Agricultural exemptionConditional

    Farm buildings and related structures on land inside Palmetto city.

    • Farm buildings and related structures such as barns, silos, and grain elevators are exempt from zoning height regulations in all districts.
    • Other buildings and structures remain subject to district maximum-height limits, subject to listed appurtenant-structure exceptions.
    “Farm buildings and related structures such as barns, silos, and grain elevators”
    One more reviewed finding on this topic
    • Available (with conditions) — Farm buildings and related structures inside Palmetto city limits.
      “Farm buildings and related structures such as barns, silos, and grain elevators shall be exempt from height regulations in all districts. Other buildings and structures shall not exceed the maximum height limitations of the zoning district in which they are located;”
  • Subdividing landLimited

    Subdivision activity inside Palmetto city limits, including specified exempt minor, estate, and combination subdivisions.

    • Combinations require no increase in the total number of lots and compliance with the zoning ordinance.
    • Minor subdivisions are limited to two lots, single-family detached residential use, existing public-street frontage, city street right-of-way requirements, Fulton/Coweta County health-department requirements, and no later resubdivision under the exemption.
    • Estate subdivisions require single-family detached residential zoning, minimum five-acre lots, existing public-street frontage, at least 100 feet of frontage, all applicable district requirements, Fulton/Coweta health-department compliance, and no rescheduling below five acres under the exemption.
    • The owner must notify the city in writing, submit a Georgia-registered land-surveyor-sealed plat, and submit the notification to the city clerk.

    minor subdivision maximum lots: 2 lots (Must satisfy all listed minor-subdivision conditions.) · estate subdivision minimum lot area: >= 5 acres (No lot may be rescheduled below five acres under the exemption.) · estate subdivision minimum frontage: >= 100 feet

    “Minor subdivisions. The division of land into two (2) lots, provided: (a) Each lot complies with all requirements of the ordinance and is limited to single-family detached residential use.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision of land inside Palmetto city limits.
      “For the purpose of these regulations, the types of activities contained in this section shall be considered subdivisions but exempt from the procedures and required public improvements portions of these regulations, except as noted:”
  • Driveway accessRequired

    Lots containing a building, dwelling unit, or structure inside Palmetto city.

    • Frontage may be on a public street, private street, or approved access easement.
    • New lots created after the ordinance's effective date must front on a public street right-of-way, private street easement, or approved access easement.
    • R-3A/R-3B driveway placement has additional corner-lot, common-lot-line, and front-yard restrictions.
    “frontage on a public street, private street or approved access easement”
    One more reviewed finding on this topic
    • Required — All residential driveways inside Palmetto city.
      “All residential driveways shall meet city engineering standards.”
  • Permit feesPublished (with conditions)

    Applications and permits required under the Palmetto zoning ordinance.

    • The mayor and council establish the fee schedule from time to time.
    • The schedule is to be available to the public and kept in the zoning administrator's office.
    • No specific current amount was located in the reviewed code section.
    “A schedule of fees for applications, permits and other purposes required by this ordinance shall be established from time to time by the mayor and council. The schedule shall be available to the public and shall be kept in the office of the zoning administrator.”
    2 more reviewed findings on this topic
  • Permit processPartial

    Zoning-related development and land-disturbance work inside Palmetto city.

    • A zoning compliance permit is required before erection, alteration, movement, or commencement of a use.
    • A certificate of occupancy is required before occupation or use of an erected or altered building.
    • Clearing, grubbing, excavating, filling, grading, or other land disturbance requires a land-disturbance permit before work begins.
    • The reviewed sources do not provide the complete technical building-permit application workflow.
    “No clearing, grubbing, excavating, filling, grading or other land disturbance activities shall occur on a site or portion of a site unless and until a land disturbance permit has been issued.”

Rules another office applies inside Palmetto

Palmetto does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic permitRequired

    Installation or physical development using an on-site sewage management system inside Palmetto city limits.

    • The permit must be obtained from the County Health Department before physical development or installation.
    • The written application must include owner/applicant information, property location, plans and specifications, facility type, utilities, bedrooms or sewage-flow data, soil characteristics, owner or agent signature, and any additional information needed to determine site suitability.
    • The County Board of Health may waive part of the information if sufficient information is already available.

    application decision period: <= 20 days (after receipt of a completed application)

    “No person may begin the physical development of a lot or structure where an on-site sewage management system will be utilized, nor install an on-site sewage management system or component thereof, without having first obtained from the County Health Department a construction permit for the installation of an onsite sewage management system.”
  • Well permitLimited

    Private wells drilled inside Palmetto city limits.

    • A licensed water-well contractor must install the well.
    • Before construction, the contractor must notify the county health department of the intent to drill.
    • Required separation distances include 10 feet from a sewer line, 50 feet from a septic tank, 100 feet from a septic absorption field, 150 feet from a cesspool or seepage pit, and 100 feet from an animal or fowl enclosure.

    sewer-line separation: >= 10 feet · septic-tank separation: >= 50 feet · septic absorption-field separation: >= 100 feet · cesspool or seepage-pit separation: >= 150 feet · animal or fowl enclosure separation: >= 100 feet

    “Wells must be installed by a licensed water well contractor. By using a licensed water well contractor, you can ensure that they meet basic criteria listed below. In addition, prior to actual construction, the water well contractor must notify the county health department of the intent to drill a water well, providing such information as is required on forms prepared by the Water Well Council.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Palmetto or Fulton County directly.

  • Owner-builder exemption — Owner-builder exemption for construction inside Palmetto city.
  • Lot coverage — Lot coverage inside Palmetto city.
  • Building height — Building height inside Palmetto city.
  • Tiny homes — Tiny-home occupancy inside Palmetto city.
  • Who permits septic — Septic permitting and administration inside Palmetto city limits.
4 more unanswered
  • Septic inspection
  • Off-grid sanitation
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Palmetto publishes no rule on the point, not that none exists. Fulton County’s page lists the county offices to call.

← All of Fulton County: county rules, score and offices