Chattahoochee Hills, Georgia requires a city building permit to construct, alter, repair, move or demolish a building, change its occupancy, or perform regulated electrical, gas, mechanical or plumbing work.1 The city administers zoning, while the Fulton County Board of Health permits and inspects onsite septic systems.23
At a glance
- Building permit
- Required for construction and other work covered by the city permit guide1
- Zoning
- Administered by Chattahoochee Hills under its Unified Development Code2
- Septic
- Permitted and inspected by the Fulton County Board of Health where public sewer is unavailable43
- RV living
- An RV or camper parked or stored on a lot may not be used as living quarters5
- Manufactured homes
- Not permitted as a principal use in the listed city zoning districts6
- Minimum lot size
- District-specific; RL generally requires 20 acres, and individual-septic lots require at least 1 acre7
- Private well
- Fulton County Board of Health review is required; the published well-location permit fee is $2508
- Owner-builder
- A current occupant may do work on the home, but city permits and inspections still apply910
Who to call
Building permits
City of Chattahoochee Hills Community Development
City building permits, plan review, zoning compliance and coordination of required building inspections
6505 Rico Road Chattahoochee Hills, GA 30268
Septic permits
Fulton County Board of Health, Environmental Health Services
Permits and inspects onsite sewage management systems and individual water supplies in Fulton County areas without public sanitary sewer
10 Park Place Health Center, 10 Park Place S.E., Atlanta, GA 30303
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Chattahoochee Hills means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Chattahoochee Hills, GA?
Yes. Chattahoochee Hills requires a building permit to construct, alter, repair, move or demolish a building or structure, change its occupancy, or install or replace regulated electrical, gas, mechanical or plumbing systems.1 Construction documents and a completed application must be submitted and approved before the city issues the permit, and work cannot begin until all required permits have been issued.11 Permit holders must obtain the required inspections.10
Georgia's mandatory construction codes apply to construction in the city even if a particular code is not locally enforced.12 The city guide identifies the editions it observes, but code editions can change; confirm the current code set with Community Development before commissioning final plans.13
Who issues building permits in Chattahoochee Hills?
City of Chattahoochee Hills Community Development is the first stop for city building permits and zoning compliance; its permit guide gives the office address as 6505 Rico Road, Chattahoochee Hills, GA 30268 and the main phone as 770-463-8881.9 The city requires construction documents with the completed application and approval before permit issuance.11
For inspections, permit holders are responsible for requesting every required inspection.10 The same city guide says a person who currently occupies a home may perform work on that home, but the building permit, code and inspection requirements still govern the project.9 Georgia also provides an owner-builder contractor-license exemption for an owner building the owner's own home, without waiving local rules.14
Does Chattahoochee Hills have zoning?
Chattahoochee Hills has municipal zoning, and a use must be listed for the parcel's zoning district and comply with the Unified Development Code and any applicable concept plan or zoning conditions.2 The city's published use table includes RL, HM, VL and HC district columns.15
Lot size is not one rule citywide. The RL district generally has a 20-acre minimum, subject to the family-lot exception, while the listed HC, HM-R, HM-MU and VL districts have no general minimum in the cited table.7 Any lot using an individual septic system must be at least 1 acre, or larger if the county health department requires it.16 The available material does not confirm a citywide minimum dwelling size or parcel-specific setbacks, so ask Community Development to identify the parcel's district and dimensional standards before buying.
How do septic permits work in Chattahoochee Hills?
The Fulton County Board of Health, not the city building office, permits and inspects onsite sewage management systems for Chattahoochee Hills properties that are not served by public sanitary sewer.3 A city building permit cannot be issued for a lot with an existing or proposed septic system until the county environmental health department approves it.17
Before occupancy, a septic lot also needs the county department's final inspection and approval, plus as-built drawings of the system.18 The published county health fee schedule lists a $300 new-residential onsite-system construction permit with inspection.19 Because an individual-septic lot must contain at least 1 acre and may need more if Environmental Health requires it, obtain the health review before treating zoning density as proof that a lot is buildable.16 Fulton County Board of Health also handles private-well review; its published fee is $250 for well-location review and a permit, including one sample if requested.8
Can you live in an RV or tiny home in Chattahoochee Hills?
A recreational vehicle, camper, bus, trailer, boat or boat trailer parked or stored on a Chattahoochee Hills lot may not be used as living quarters, and its parking or storage area must be within the lot's buildable area.20 That rule answers residential use of a parked RV; the available city material does not confirm a general rule for temporary camping on private land.
The reviewed city material does not establish a tiny-home-specific occupancy rule or a minimum dwelling size. A tiny house proposed as a permanent building would still face the city's building-permit requirement, applicable construction codes, zoning-district use rules and septic approval where no public sewer serves the lot.123 Manufactured homes are not permitted as a principal use in the RL, HM, VL and HC districts shown in the city's use table.6
Building a home in Chattahoochee Hills: what are the steps?
- Ask City Community Development to confirm the parcel's zoning district, permitted residential use and applicable dimensional standards. Chattahoochee Hills applies district-specific use rules.2
- If the lot will use septic, obtain Fulton County Board of Health approval before the city building permit; an individual-septic lot must contain at least 1 acre and may need to be larger.1716
- Prepare the site plan and construction documents, then submit them with the completed city building-permit application.11
- Do not start construction until all required permits have been issued.1
- Request and pass the required construction inspections.10
- For a septic property, secure the county's final approval and deliver septic as-built drawings before the city issues a certificate of occupancy.18
What should you check before buying land in Chattahoochee Hills?
Start with the city zoning district and permitted-use table, because the parcel's district controls what uses are allowed and the RL lot-size rule differs from the other listed districts.27 Check flood mapping early: new principal residential and nonresidential buildings are not allowed within identified existing or future-conditions floodplain limits.21
For a site without public sewer, ask Fulton County Environmental Health whether the proposed septic system and lot area can be approved before closing.3 Countywide soil data rates 59.4% of Fulton County soils as free of severe limits for a conventional septic drain field, but that Fulton County figure is not a substitute for evaluating the parcel.22 A private well requires county health review and a well-location permit.8 The citywide rule for mandatory public-water or sewer connection and the general city driveway-access requirement could not be confirmed, so ask Community Development and Environmental Health about service and access for the exact address.
Watch-outs
- An RV or camper stored on a Chattahoochee Hills lot cannot be used as living quarters.5
- The RL district generally requires 20 acres, while every individual-septic lot must have at least 1 acre or more if the county health department requires it.7
- New principal buildings are not allowed within identified existing or future-conditions floodplain limits.21
Sources
- Building in the City of Chattahoochee Hills: Your Guide to the Construction and Permit Process (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Sec. 7-2. Permitted uses (Chattahoochee Hills), quoted and re-checked
- Fulton County Board of Health Land-use (Chattahoochee Hills), quoted and re-checked
- Fulton County Board of Health Land-use (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Sec. 5-13. Vehicular parking (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Code of Ordinances, Appendix A, Sec. 7-2—Permitted uses (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Code of Ordinances, Appendix A, Sec. 6-3—Density (Chattahoochee Hills), quoted and re-checked
- Fulton County Board of Health Environmental Health Section Fee Schedule (Chattahoochee Hills), quoted and re-checked
- City of Chattahoochee Hills Community Development (chatthillsga.us)
- Building in the City of Chattahoochee Hills: Your Guide to the Construction and Permit Process (Chattahoochee Hills), quoted and re-checked
- Building in the City of Chattahoochee Hills: Your Guide to the Construction and Permit Process (Chattahoochee Hills), quoted and re-checked
- Georgia Department of Community Affairs — Mandatory and Permissive State Codes (Chattahoochee Hills), quoted and re-checked
- Building in the City of Chattahoochee Hills: Your Guide to the Construction and Permit Process (Chattahoochee Hills), quoted and re-checked
- Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Sec. 7-2. Permitted uses (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Sec. 6-3. Density (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Article XIV — Stormwater and Infrastructure (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Unified Development Code, Article XIV — Stormwater and Infrastructure (Chattahoochee Hills), quoted and re-checked
- Fulton County Board of Health Environmental Health Section Fee Schedule (Chattahoochee Hills), quoted and re-checked
- Unified Development Code, Sec. 5-13. Vehicular parking (Chattahoochee Hills), quoted and re-checked
- Chattahoochee Hills Code of Ordinances, Sec. 14-81—Provisions for flood damage reduction (Chattahoochee Hills), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.