Cave Spring, Georgia, in Floyd County, runs its own zoning ordinance and adopts the state minimum building codes inside city limits12. Manufactured homes are barred inside the city, with narrow exceptions3. Septic permits for Floyd County come from the Floyd County Health Department's Environmental Health office4. We could not confirm which office issues residential building permits inside the city, so call City Hall first5.
At a glance
- Zoning
- Yes. Cave Spring has its own zoning ordinance with R-1 and R-2 districts1
- Building permit
- City adopts the state building codes; agricultural outbuildings can be exempt. Which office issues permits is unconfirmed26
- Septic
- Floyd County Health Department, Environmental Health4
- RV living
- Limited: short stays only with a permanent house on the lot, and the city code conflicts with itself7
- Manufactured homes
- Prohibited inside city limits, with grandfathering3
- Minimum lot
- Half an acre in R-1; one-third acre in R-289
- Owner-builder
- Georgia does not require a license to build your own home; local codes still apply10
Who to call
Zoning
City of Cave Spring, City Hall
First call for Cave Spring zoning questions and for which office issues building permits inside the city
10 Georgia Avenue, Cave Spring, GA
Building permits
Rome-Floyd County Building Inspection Department
Floyd County building permits and inspections; Cave Spring's code says copies of its adopted technical codes are kept here
607 Broad Street, Rome, GA 30162
Septic permits
Floyd County Health Department, Environmental Health
Septic (onsite sewage) site evaluations, construction permits and final inspections for Floyd County, and notice of intent to drill for private wells
16 East 12th Street, Rome, GA 30161
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Cave Spring means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Cave Spring, GA have zoning, and what does it mean for lot size and setbacks?
Yes. Cave Spring has its own zoning ordinance, published as Appendix B of the city code, and its districts include R-1 and R-21.
In the R-1 agricultural and low density residential district, the minimum lot size is one-half acre, with a 25-foot front yard, 20-foot side yards and a 25-foot rear yard811. Buildings in R-1 top out at 35 feet or three stories12.
In the R-2 medium and high density residential district, the minimum lot size is one-third acre, with a 20-foot front yard, 10-foot side yards and a 20-foot rear yard913. R-2 allows 50 feet for apartment buildings and 35 feet for everything else14.
Accessory buildings keep the same front and side yards as the main structure in both districts11. We could not confirm minimum home size, lot coverage or accessory-dwelling rules; ask City Hall5.
Do you need a building permit in Cave Spring, and who issues it?
Cave Spring adopts the state minimum standard codes, including the international residential code, for construction inside the city2. Georgia's mandatory codes apply to any structure built in the state whether or not a local government enforces them15.
Agricultural buildings inside Cave Spring can skip a building permit, but only if they hold farm products, farm equipment or animals, are not used for habitation, have no toilet, draw no more than 125 amps, and stay under 4,000 square feet and one story6. Exempt buildings must still be built to code6.
We could not confirm which office issues residential building permits inside Cave Spring. The city's code says copies of the codes are kept at the county building inspection department2, and Floyd County's Rome-Floyd County Building Inspection Department handles building permits for unincorporated Floyd County16. Call Cave Spring City Hall first5, then the Rome-Floyd County Building Inspection Department17.
Georgia does not require a license to build your own home, but the owner still has to follow local codes and permits10.
How do septic permits work in Cave Spring?
Septic permits for Floyd County come from the Floyd County Health Department's Environmental Health section418. We could not find a separate Cave Spring septic rule, so expect the county health department to handle septic and well questions for city addresses too; confirm with them.
Georgia requires a construction permit before an onsite sewage system goes in, and the County Board of Health must find the site suitable19. A final inspection and written approval come before the system is backfilled or used20. Where a public or community sewer is available within 200 feet of the property line, or in the right-of-way next to it, connection is required21.
The county's published fee schedule, labeled effective May 1, 2008, lists a $275 application and site visit and a $475 delayed permit for building before permitting22. Confirm current fees by phone.
In Floyd County about 22% of soils rate "not limited" for a conventional drain field, so many lots need a site evaluation or an engineered system23.
Can you live in an RV, tiny home or manufactured home in Cave Spring?
RV: the zoning ordinance allows temporary occupancy of a recreational vehicle for no more than ten days in any two-month period, only with a permanent dwelling on the lot and one RV per lot7. A separate section of the city code bars RV occupancy outside a licensed RV park holding a city business license, and the two sections appear to conflict, so assume the stricter reading and ask City Hall before parking an RV on a lot75.
Camping in public areas inside Cave Spring is unlawful without a city permit; the camping section does not address private land24.
Manufactured homes: no mobile or manufactured home may be placed or occupied inside the city limits. Units already on private lots on January 1, 2002 are exempt until the right is abandoned by removal with no replacement within 30 days, and contractors may use temporary quarters during construction3.
Tiny homes: we found no tiny-home provision in Cave Spring's code. Georgia treats site-built or modular tiny homes as dwellings under the building codes, and local zoning decides where they can be sited25.
Building a home in Cave Spring: the steps, in order
- Call Cave Spring City Hall to confirm the zoning district for your lot and which office issues your building permit5.
- Check lot size and setbacks for R-1 or R-2 against your plan89.
- Contact the Floyd County Health Department's Environmental Health office about a site evaluation and septic construction permit, or ask about sewer availability1821.
- Check whether the lot lies in a flood zone; inside the city, where no base flood elevation exists, the lowest floor must sit at least three feet above the highest adjacent grade26.
- Apply for the building permit with plans that meet the state minimum codes the city adopts2.
- If the driveway meets a state highway, apply to the Georgia DOT District office27.
- Pass the septic final inspection before backfilling20.
What stays with Floyd County, and what to check before you buy in Cave Spring
Septic permits and well notices stay with the Floyd County Health Department rather than the city. A licensed contractor must notify the county health department before drilling a private water well28.
Land outside Cave Spring city limits falls under Floyd County's rules; see the Floyd County page for unincorporated land. Floyd County requires a permit for most building projects outside the city16, and county driveway connections need a permit before the building permit29.
Floyd County's effective property tax rate is 0.8%, with a median tax bill of $1,560 a year3031. Land that qualifies for Georgia's conservation-use assessment is assessed at 40% of its current use value, and the application goes to the county board of tax assessors32. The nearest city of 100,000 or more people is about 52 miles from the Floyd County center33.
Watch-outs
- We could not confirm who issues building permits, inspections or certificates of occupancy inside Cave Spring; ask City Hall before you buy5.
- Cave Spring's two RV rules appear to conflict, so assume the stricter reading and confirm with City Hall before living in an RV on a lot7.
- Manufactured homes are prohibited inside city limits except grandfathered units3.
- The Floyd County septic fee schedule we found is labeled effective May 1, 2008, so confirm current fees with Environmental Health22.
Sources
- Cave Spring Zoning Ordinance Sec. 7.1 (Cave Spring), quoted and re-checked
- Cave Spring Code Sec. 8-1 Technical codes adopted (Cave Spring), quoted and re-checked
- Cave Spring Code Sec. 8-24 Mobile home/manufactured homes or RVs (Cave Spring), quoted and re-checked
- Floyd County Health Department Environmental Health Section Fee Schedule, quoted and re-checked
- City of Cave Spring, City Hall (cavespring.ga.gov)
- Cave Spring Code Sec. 8-1 Technical codes adopted (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 6.3 Occupancy of recreational vehicles (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.2 R-1 (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.3 R-2 (Cave Spring), quoted and re-checked
- Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.2 R-1 (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.2 R-1 (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.3 R-2 (Cave Spring), quoted and re-checked
- Cave Spring Zoning Ordinance Sec. 7.3 R-2 (Cave Spring), quoted and re-checked
- Mandatory and Permissive State Codes (Georgia statewide rule), quoted and re-checked
- Building Inspection, quoted and re-checked
- Rome-Floyd County Building Inspection Department (romega.us)
- Floyd County Health Department, Environmental Health (nwgapublichealth.org)
- Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
- Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
- GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
- Floyd County Health Department Environmental Health Section Fee Schedule, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Cave Spring Code Sec. 24-13 Urban camping (Cave Spring), quoted and re-checked
- Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
- Cave Spring Code Sec. 20-70 Flood building standards (A zones) (Cave Spring), quoted and re-checked
- Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
- Well Water, quoted and re-checked
- floydcountyga.gov, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Conservation Use Land Values (Georgia statewide rule), quoted and re-checked
- Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.