Bolthole Index

Putnam County, Florida

Building permits, zoning and land rules in Palatka, Florida

Palatka, Florida requires building permits for listed construction and alteration work, with applications beginning through Putnam County before city review where required.1 The city administers zoning, while a private septic system needs both Palatka approval and a Putnam County health permit.23

At a glance

Building permit
Required for listed construction and alterations; applications begin with Putnam County1
Zoning
Palatka zoning districts and the official zoning map apply inside city limits2
Septic
City approval and a Putnam County health permit are required for a private system34
RV living
No specific occupancy rule confirmed; ask Palatka Planning about the parcel and proposed use25
Tiny home
No separate occupancy rule confirmed; city zoning and building review still apply21
Private well
A water-management-district or delegated permit is required before construction, repair or abandonment6
Owner-builder
A qualifying owner may act as contractor, but the building-permit requirement remains7

Who to call

Planning & zoning

City of Palatka Planning Department

Palatka zoning, city development review and the city side of building-permit processing

386-329-0100

[email protected]

205 N. 2nd St. Palatka, FL 32177

Online permits →

Septic permits

Florida Department of Health in Putnam County - Environmental Health

Putnam County septic permitting and inspections for properties using onsite sewage systems

386-326-3240

[email protected]

2801 Kennedy St., Palatka, FL 32177

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in Palatka means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Palatka, Florida?

Yes. Palatka lists construction or demolition of a building or structure, structural alterations, electrical, plumbing, mechanical, roofing, gas work, driveways, carports, porches, pools and storage buildings among work requiring a building permit.1 The list is not exhaustive, and some applications go directly through Putnam County while others also require city approval.1

Palatka generally excludes painting, carpeting, flooring, cabinet replacement, fence installation, lock changes and asphalt paving or coating from the permit process, except that Historic District requirements may still apply.1 Florida's statewide building code governs construction, while Palatka's zoning, setbacks and site-development rules remain local requirements.8 Ask the Planning Department to classify the proposed work before ordering plans or beginning construction.5

Who issues building permits in Palatka, and how do you apply?

Palatka's Planning Department partners with Putnam County to process building permits, and every application must be filed with the county before any required city application is submitted.5 Plans go through Putnam County's CitizenServe review system, where examiners review the documents for applicable codes and ordinances and may request corrections.9

The City of Palatka Planning Department is at 205 N. 2nd St., Palatka, FL 32177; call 386-329-0100 or email [email protected].5 Palatka publishes application forms and checklists for homes, duplexes, smaller structures and commercial buildings.10 City impact and connection fees apply to new building projects and are due before a certificate of occupancy; the amount is calculated by the final-inspection date.11

Does Palatka have zoning, and what does it mean for RVs and tiny homes?

Palatka has city zoning districts and an official zoning map for land inside the city limits.2 The Planning Department reviews development plans against the comprehensive plan and Municipal Development Code and works on site plans, subdivisions, rezoning, annexations, historic preservation and sign permits.5

We could not confirm a specific Palatka rule for living in an RV, temporary camping, tiny-home occupancy, accessory dwellings, minimum dwelling size, minimum lot size or district setbacks. Before buying, give the Planning Department the parcel address, zoning district, proposed unit type, foundation or chassis details, occupancy duration and utility plan, then request a written answer.5 A tiny home that involves regulated construction is not automatically outside the building-permit process, and an RV or other development in a mapped flood hazard area may require floodplain approval.112

How do septic permits work inside Palatka?

A private septic system inside Palatka needs approvals from both city and county authorities. Before construction, repair, alteration or enlargement, the owner must obtain a written permit signed by Palatka's water and sewer distribution superintendent and a valid permit from the county health authority.3 Plans and specifications also require the applicable health and environmental approvals.4

The Florida Department of Health in Putnam County handles local septic permitting and inspections at 2801 Kennedy St., Palatka, FL 32177; call 386-326-3240 or email [email protected].13 Only 5.2% of mapped Putnam County soils avoid severe limitations for a conventional septic drain field, so settle system feasibility before fixing the house location.14 Where public sewer becomes available, state connection rules may change the viability of continuing with an onsite system.15

Can you build as an owner-builder or add a private well in Palatka?

Florida allows a qualifying owner to act as the owner's own contractor for a one-family or two-family residence intended for the owner's use and occupancy.7 The owner must personally appear and sign the building-permit application, directly supervise work not performed by licensed contractors and comply with applicable permitting-agency requirements.7 Offering the residence for sale or lease within one year after completion creates a statutory presumption that it was built for sale or lease.7 The exemption does not remove building permits, inspections, zoning or code compliance.7

A private water well in Palatka requires a permit from the appropriate water management district or its delegated authority before construction, repair or abandonment.6 Ask Palatka Planning to confirm the site constraints and the responsible well-permitting office for the parcel before scheduling drilling.5

Building a home in Palatka: the steps, in order

  1. Ask Palatka Planning to confirm the parcel's zoning district, allowed residential use, setbacks, site-plan requirements and any Historic District or flood-hazard review.212
  2. Resolve water and wastewater early; a private well needs advance permitting, while a private septic system needs both city approval and a county health permit.63
  3. File the building-permit application with Putnam County first, then submit the required Palatka application and plans.5
  4. Respond to plan-review corrections and pay the required fees before permit issuance.9
  5. Keep approved plans at the job site and schedule required inspections through the Building-Zoning Department as work progresses.916
  6. Complete authorized work, obtain inspection approvals and pay all fees before the certificate of occupancy is issued.17

What should you check before buying land in Palatka and Putnam County?

Confirm that the parcel is inside Palatka before relying on city zoning or the city-county building-permit sequence.2 Obtain the zoning designation and ask whether the intended home, RV, tiny home, accessory dwelling, manufactured home or agricultural use is allowed.5 Driveway construction or alteration is among the work Palatka identifies as requiring permit review.18 Development wholly or partly in a flood hazard area requires a floodplain application and approval before work.12

Treat wastewater as a purchase contingency because only 5.2% of mapped Putnam County soils avoid severe conventional drain-field limitations.14 Putnam County's effective property-tax rate is about 0.8%, and its median annual property-tax bill is about $1,196.1920 The county is 72.3% wooded, so price clearing and access for the actual building envelope rather than the entire parcel.21

Watch-outs

  • Building-permit applications begin with Putnam County, but some projects also require Palatka approval; do not stop after only one submission.5
  • A private septic system inside Palatka needs both a city permit and a Putnam County health permit before construction.3
  • Only 5.2% of mapped Putnam County soils avoid severe limitations for a conventional septic drain field, so verify the proposed system and location before buying.14
  • Palatka's specific rules for RV occupancy, temporary camping and tiny homes could not be confirmed; ask Planning for a parcel-specific written answer.5

Sources

  1. Planning and Zoning Department (Palatka), quoted and re-checked
  2. Sec. 94-111. Establishment; official zoning map (Palatka), quoted and re-checked
  3. Sec. 86-213. Permit required; agreement for future connection with public sewer (Palatka), quoted and re-checked
  4. Sec. 86-212. Plans and specifications (Palatka), quoted and re-checked
  5. City of Palatka Planning Department (palatka-fl.gov)
  6. Water Well Contractor Licensing and Permitting (Palatka), quoted and re-checked
  7. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  8. Florida Building Commission (Palatka), quoted and re-checked
  9. Permit Process Step-by-Step (Palatka), quoted and re-checked
  10. Applications and Fees (Palatka), quoted and re-checked
  11. Applications and Fees (Palatka), quoted and re-checked
  12. Chapter 38 - Floods, Article I - Floodplain Management Ordinance (Palatka), quoted and re-checked
  13. Florida Department of Health in Putnam County - Environmental Health (putnam.floridahealth.gov)
  14. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  15. leg.state.fl.us (Florida statewide rule), quoted and re-checked
  16. Permit Process Step-by-Step (Palatka), quoted and re-checked
  17. Permit Process Step-by-Step (Palatka), quoted and re-checked
  18. Planning and Zoning Department (Palatka), quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Median property tax bill: Bolthole Index county data
  21. Wooded share of land: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Palatka

Palatka’s own rules

  • Building permitRequired

    Construction, demolition, and listed alterations inside Palatka city limits.

    • The city page says the examples are not an exhaustive list.
    • Some permits are passed directly to Putnam County and others require City permits.
    • Applications must be filed with the County first, then City applications may be submitted.
    “Some will be passed directly to the County. Others will require City permits.”
    3 more reviewed findings on this topic
    • Required — Construction and listed alterations inside Palatka city limits.
      “The following are examples of work requiring permits.”
    • Required — Construction, alteration, and demolition work inside Palatka city limits, subject to listed exemptions and project-specific review.
      “The following are examples of work requiring permits. Please call the Planning Department for further details. Some will be passed directly to the County. Others will require City permits.”
    • Required — Listed construction and alteration work inside Palatka city limits, including construction or demolition of buildings or structures.
      “The following are examples of work requiring permits. Please call the Planning Department for further details. Some will be passed directly to the County. Others will require City permits.”
  • InspectionsRequired

    Permitted building work inside Palatka city limits.

    • Final inspections must be scheduled with the Building-Zoning Department.
    • The city page does not enumerate every inspection type.
    “final inspections will need to be scheduled and completed.”
    2 more reviewed findings on this topic
    • Required — Permitted construction inside Palatka city limits.
      “As work progresses, final inspections will need to be scheduled and completed. Inspections should be scheduled by contacting the Building-Zoning Dept. Please Call to schedule: (386) 329-0100”
    • Required — Permitted construction inside Palatka city limits.
      “final inspections will need to be scheduled and completed”
  • Certificate of occupancyRequired

    Projects processed through the Palatka permit process.

    • All authorized work must be completed.
    • All inspections must be approved.
    • All fees must be paid.
    “When all work proposed and authorized by the permit has been completed and verified with all inspections approved and fees paid, a CO is issued.”
    3 more reviewed findings on this topic
    • Required — Projects inside Palatka city limits for which the permit process requires a certificate of occupancy.
      “Congratulations!!! When all work proposed and authorized by the permit has been completed and verified with all inspections approved and fees paid, a CO is issued.”
    • Required — Permitted building projects inside Palatka city limits.
      “Congratulations!!! When all work proposed and authorized by the permit has been completed and verified with all inspections approved and fees paid, a CO is issued.”
    • Required — Projects inside Palatka city limits when a certificate of occupancy is required by the permit process.
      “When all work proposed and authorized by the permit has been completed and verified with all inspections approved and fees paid, a CO is issued.”
  • Local zoningPresent

    Land inside Palatka city limits.

    • The city is divided into zoning districts under the official zoning map and Chapter 94.
    “The city is hereby divided into zoning districts”
    4 more reviewed findings on this topic
    • Present — Land inside the corporate limits of Palatka city.
      “The city is hereby divided into zoning districts as provided in this section and as shown on the official zoning map, which, together with all explanatory material shown therein, is hereby adopted by reference and declared to be a part of this chapter.”
    • Present — Land inside Palatka city limits.
      “The city is hereby divided into zoning districts as provided in this section and as shown on the official zoning map”
    • Present — Land inside Palatka city limits; the City of Palatka adopts and administers zoning through its Municipal Development Code and official zoning map.
      “The city is hereby divided into zoning districts”
    • Present — Land inside Palatka city limits; the city adopts and administers zoning districts and an official zoning map.
      “The city is hereby divided into zoning districts as provided in this section and as shown on the official zoning map, which, together with all explanatory material shown therein, is hereby adopted by reference and declared to be a part of this chapter.”
  • Zoning districtsPublished

    Land inside Palatka city limits.

    • The official zoning map is the final authority as to current zoning status.
    • Districts include residential, mobile-home residential, historic, commercial, industrial, conservation, agriculture/open rural, and other categories.
    “the official zoning map [...] shall be the final authority”
    2 more reviewed findings on this topic
    • Published (with conditions) — Zoning districts and land-development controls inside Palatka city limits.
      “To maintain the quality of life of the community and promote economic development through the implementation of the City’s comprehensive plan and zoning regulations.”
    • Published — Official Palatka zoning districts and zoning-map administration inside city limits.
      “To view the most recent zoning for the City of Palatka, use the GIS Reference Map.”
  • Who permits septicMixed (with conditions)

    Private sewage systems inside Palatka city limits.

    • Palatka requires approval by the city water and sewer distribution superintendent.
    • The county board of health issues the valid septic permit.
    • The county health department performs septic permitting and inspection.
    • Florida DEP is responsible for implementing applicable OSTDS statutes and regulations.
    “county health department offices will continue to do the permitting and inspection for septic tanks”
    4 more reviewed findings on this topic
    • County (with conditions) — Septic permitting and inspections for properties inside Palatka city limits that use onsite sewage systems; the administering body is the Putnam County health department.
      “If you live outside these 16 counties, your local county health department will still handle septic system permitting and inspections.”
    • Mixed (with conditions) — Septic systems inside Palatka city limits.
      “county health department offices will continue to do the permitting”
    • Mixed (with conditions) — Private sewage disposal systems inside Palatka city.
      “Septic tanks shall be constructed, repaired, altered, enlarged and maintained in accordance with plans and specifications approved by the county board of health and the state department of environmental protection. No person shall construct, repair, alter or enlarge any septic tank unless he receives approval by the water and sewer distribution superintendent and holds a valid permit for such work issued by the county board of health.”
    • Mixed (with conditions) — Private sewage disposal systems inside Palatka city limits.
      “approved by the county board of health and the state department of environmental protection. [...] approval by the water and sewer distribution superintendent”
  • Septic permitRequired

    Construction of a private sewage disposal system inside Palatka city limits.

    • A written permit signed by the water and sewer distribution superintendent is required before construction begins.
    • The owner must execute a written agreement to connect to public sewer when it becomes available.
    • A valid permit issued by the county board of health is also required for septic-tank work.
    “the owner shall first obtain a written permit signed by the water and sewer distribution superintendent.”
    3 more reviewed findings on this topic
  • Septic inspectionRequired

    Septic systems inside Palatka city limits.

    • The Putnam County Health Department performs septic permitting and inspection.
    • Private-provider inspection is optionally available beginning July 1, 2022, where authorized.
    “continue to do the permitting and inspection for septic tanks”
    One more reviewed finding on this topic
    • Required — Onsite sewage treatment and disposal systems inside Palatka city limits.
      “the county health department offices will continue to do the permitting and inspection for septic tanks”
  • Agricultural exemptionConditional

    Agricultural uses applying best management practices inside Palatka city limits, for purposes of the wetlands-protection article.

    • The exemption is from the requirements of the wetlands-protection article.
    • It applies to agricultural uses applying best management practices, including silviculture and cattle grazing.
    “Agricultural uses applying best management practices (including silviculture and cattle grazing).”
  • Subdividing landRegulated (with conditions)

    Subdivision and platting of land inside Palatka city limits.

    • A written petition to plat must be submitted with required ownership, title, plat, notice, tax, and other documentation.
    • The City staff reviews the petition; if sufficient, Planning Board and City Commission hearing dates are scheduled.
    • The City Commission must approve the plat by resolution before recording; the plat is not adopted until recorded with the Putnam County Clerk.
    • The city application states that upon approval the City furnishes a certified copy of the resolution to the Putnam County Commission; this does not transfer municipal approval jurisdiction.
    • The city application identifies Palatka Code of Ordinances sections 74-7 through 74-26 as applicable subdivision provisions.

    preliminary plat review fee: 882 USD (The city fee schedule separately lists a $1,000 final plat base fee.) · final plat base fee: 1000 USD · final plat filing fee: per 5.25 USD per lot · advertising and surrounding-property-owner-letter fee: 160 USD (Required for both preliminary and final plat processes according to the city application.)

    “The petition is reviewed by staff. If the application is found to be sufficient, the Planning Board hearing date and City Commission hearing dates will be scheduled for consideration of a resolution for the plat. If the City Commission approves the plat, the resolution approving the plat is adopted. It is the petitioner’s responsibility to pay the recording fees. The plat is not adopted until recorded with the County Clerk.”
    4 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision review and platting inside Palatka city limits.
      “The Planning Department is involved with site development plans and subdivision review, landscaping, rezoning, annexations, historic preservation, and sign permits.”
    • Regulated (with conditions) — Subdivision and development inside Palatka city limits.
      “The Planning Department is involved with site development plans and subdivision review, landscaping, rezoning, annexations, historic preservation, and sign permits.”
    • Regulated (with conditions) — Subdivision and lot-split activity inside Palatka city limits.
      “The Planning Department is involved with site development plans and subdivision review, landscaping, rezoning, annexations, historic preservation, and sign permits.”
    • Regulated (with conditions) — Subdivision and lot-split activity inside Palatka city limits.
      “Subdivision Development Plan or Preliminary Plat review$882.00”
  • Driveway accessRequired

    Driveway construction or alteration inside Palatka city limits.

    • The city lists driveways among examples of work requiring permits.
    • The list is not all-inclusive and applicants are directed to contact the Planning Department for details.
    • Historic District requirements may add approvals.
    “The following are examples of work requiring permits. Please call the Planning Department for further details. Some will be passed directly to the County. Others will require City permits.”
    2 more reviewed findings on this topic
    • Required — Driveway construction or alteration inside Palatka city limits.
      “The following are examples of work requiring permits.”
    • Required — Driveway construction or alteration inside Palatka city limits.
      “The following are examples of work requiring permits. Please call the Planning Department for further details. Some will be passed directly to the County. Others will require City permits.”
  • Building in a floodplainRequired

    Development wholly or partially within a flood hazard area inside Palatka city limits.

    • The ordinance applies to all development wholly within or partially within a flood hazard area, including subdivision, filling, grading, site improvements, utility installations, construction and alteration, manufactured homes and buildings, tanks, recreational vehicles, swimming pools, and any other development.
    • The applicant must file a written application on a city-furnished form identifying the development, site, intended use and occupancy, valuation, and other required information, accompanied by site plans or construction documents.
    • The planning director is the floodplain administrator and administers and enforces the chapter.
    • Floodplain development permits and building permits must condition commencement on obtaining other applicable state or federal permits, including permits from the St. Johns River Water Management District, Florida Department of Health for onsite sewage systems, Florida Department of Environmental Protection, and federal authorities.
    • A floodplain development permit becomes invalid unless authorized work commences within 180 days after issuance, or if work is suspended or abandoned for 180 days; written extensions of not more than 180 days may be requested with demonstrated justifiable cause.
    • Construction or development in a flood hazard area without an issued permit, in conflict with an issued permit, or not fully complying with the chapter is a violation.

    permit commencement deadline: 180 days (The permit becomes invalid if work does not commence within 180 days after issuance.) · suspension or abandonment period: 180 days (The permit becomes invalid if authorized work is suspended or abandoned for 180 days after work commences.)

    “Any owner or owner's authorized agent (hereinafter "applicant") who intends to undertake any development activity within the scope of this chapter, including buildings, structures and facilities exempt from the Florida Building Code, which is wholly within or partially within any flood hazard area shall first make application to the floodplain administrator, and the building official if applicable, and shall obtain the required permit(s) and approval(s).”
  • Permit feesPublished (with conditions)

    Published Palatka planning, subdivision, lot-split, variance, and related application fees.

    • The fee schedule is Appendix A, Supplement No. 29, created March 25, 2024.
    • Building impact and connection fees are assessed for all new building projects in the city and are due before obtaining a certificate of occupancy.
    • The impact fee is calculated by the date of final inspection; payment may be made earlier to avoid increases.

    subdivision development plan or preliminary plat review: 882 USD · final plat base fee: 1000 USD · final plat filing fee per lot: 5.25 USD · lot split: 150 USD

    “(b) Subdivision Development Plan or Preliminary Plat review$882.00 (c) Final plat base fee$1,000.00 (d) Fee for filing final plat (for each lot contained in the subdivision)$5.25 (e) Lot split$150.00”
    4 more reviewed findings on this topic
    • Published — City building-related applications and new building projects inside Palatka city.
      “The fees are assessed for all new building projects in the City and are due prior to obtaining a Certificate of Occupancy (CO).”
    • Published (with conditions) — City planning, zoning, site-plan, and related development applications inside Palatka city limits.
      “Site plan review, minor (accessory building, single-family residential lot)$50.00”
    • Published (with conditions) — City building, zoning, and development applications inside Palatka city limits.
      “Fee Schedule Appendix A 2024 Impact and Connection Fees The fees are assessed for all new building projects in the City and are due prior to obtaining a Certificate of Occupancy (CO). Please note the year change in the Transportation Impact fee columns and calculate accordingly. The fee is calculated by the date of final inspection, but can be paid ahead of time to avoid increases.”
    • Published (with conditions) — Planning, zoning, subdivision, and related applications inside Palatka city limits.
      “Final Site Construction Inspection, per inspection$300.00”
  • Permit processPublished (with conditions)

    Building permit applications inside Palatka city limits.

    • All plans must be submitted through Putnam County's CitizenServe review system.
    • Applications are made through both the City and County.
    • Plans examiners may require corrections.
    • Permit issuance requires payment of all fees.
    • Final inspections must be scheduled and completed before a CO is issued.
    “Permit applications should be made through the City and the County. Homeowners, follow the checklist on the City’s application. Failure to submit required documentation will result in lengthy delays.”
    3 more reviewed findings on this topic
    • Partial — Building and development applications inside Palatka city.
      “Building a Single-Family Residence or Duplex? Building-Site Plan Application Building Site Plan Checklist Examples of Site Plans”
    • Published (with conditions) — Building permits and related development applications inside Palatka city limits.
      “All applications must be filed with the County first.”
    • Partial — Residential building and development applications inside Palatka city limits.
      “This checklist is provided pursuant to Palatka Municipal Codes 38-72; 74-11; 94-33 to ensure a quality site plan is submitted by the applicant, which in return will expedite the review and approval process to issue the building permit. Please submit through CitizenServe on the Putnam County website: https://main.putnam-fl.com/?page_id=127”

Rules another office applies inside Palatka

Palatka does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Construction inside Palatka city limits under Florida's statewide building-code system.

    • Local land-use, zoning, setback, subdivision, and site-development requirements remain local requirements.

    effective date: 2023-12-31

    “The initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the commission is deemed adopted for use statewide without adoptions by local government.”
    One more reviewed finding on this topic
    • Adopted — Construction inside Palatka city limits under the statewide Florida Building Code.
      “The Effective Date for the Florida Building Code, 8th Edition (2023), is December 31, 2023.”
  • Well permitRequired

    Private water wells inside Palatka city, within the St. Johns River Water Management District service area.

    • A permit is required before construction, repair, or abandonment of a water well.
    • The District or a delegated entity issues the permit.
    • Florida DEP delegates the water-well permitting program to the water management districts.
    “Additionally, a permit must be obtained from the appropriate WMD or its delegated permitting authority prior to the construction, repair or abandonment of any water well.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Palatka or Putnam County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside Palatka city limits.
  • Minimum dwelling size — Residential districts inside Palatka city limits.
  • Minimum lot size — Residential and agricultural districts inside Palatka city limits.
  • Setbacks — Residential and agricultural districts inside Palatka city limits.
  • Lot coverage — Residential and agricultural districts inside Palatka city limits.
7 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Palatka publishes no rule on the point, not that none exists. Putnam County’s page lists the county offices to call.

← All of Putnam County: county rules, score and offices