Town of Dundee, Florida requires building permits for new construction, alterations, repairs, demolition and additions through its Development Services Department.1 Dundee sets its own zoning in Polk County.2 New development must connect to Town water and wastewater systems when reasonably available; septic installation and repair permits come from the Florida Department of Health in Polk County.34
At a glance
- Building permits
- Required; apply through Dundee Development Services1
- Zoning
- Town Land Development Code applies inside Dundee2
- Septic permits
- DOH-Polk; first establish whether Town sewer connection is required43
- RV living
- RV parks require a special exception in RMH; private-lot occupancy remains unconfirmed2
- Minimum home size
- 500 square feet for single-family attached development; not a universal home minimum5
- Owner-builder
- Conditional Florida exemption; building permits and code compliance still apply6
- Water and sewer
- Connection required for new development when Town services are reasonably available3
Who to call
Building permits
Town of Dundee Development Services Department — Building
Building permits, construction inspections and certificate requests inside Dundee
124 Dundee Road, Dundee, Florida 33838
Planning & zoning
Town of Dundee Planning Department
Town zoning, land-use and development questions
124 Dundee Road, Dundee, FL, 33838
Septic permits
Florida Department of Health in Polk County — Environmental Public Health
Septic installation and repair permits, evaluations and inspections throughout Polk County
2090 E. Clower St Bartow, FL 33830
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Town of Dundee means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Town of Dundee, FL?
Dundee requires a building permit for new construction, alterations, repairs, demolition and additions to a structure, and applicants obtain building permits from the Town Development Services Department.1 Dundee Development Services also permits and inspects mobile-home setups, signs and other structures.1 Florida’s statewide building code supplies the base code; local authorities may adopt amendments permitted by state law.7 An eligible Florida owner-builder must directly supervise work and build for personal use rather than sale or lease; the exemption does not remove building permits or code compliance.6
Who issues building permits in Town of Dundee, and how do you apply?
Start a Dundee building-permit application with the Town Development Services Department at 124 Dundee Road, Dundee, Florida 33838.1 The Town directs applicants to download and return its building-permit application and send building-permit submissions and questions to [email protected].1 Request construction inspections through [email protected], including the building-permit number, job-site address, inspection type and desired date.1 Send certificate-of-occupancy or certificate-of-completion requests to [email protected].1 Ask Development Services for the current fee sheets and required forms before budgeting the application.1
Does Town of Dundee have zoning, lot sizes and setbacks?
Dundee has its own Land Development Code and district-specific zoning rules inside town limits.2 Ask the Town Planning Department for a zoning verification for the parcel and proposed dwelling type before treating a small lot as buildable.8 For single-family attached development, Dundee specifies a minimum lot size of 2,000 square feet and minimum lot width of 20 feet.9 The same development standards require a 500-square-foot minimum dwelling floor area; that is not a minimum for every dwelling type.5 Single-family attached standards specify front setbacks of 25 feet, rear setbacks of 20 feet and side setbacks of at least 10 feet where there is no common wall.10
How do septic permits work inside Town of Dundee?
For new improvements or development inside Dundee or its water and wastewater service area, connection to Town water and wastewater systems is required at development when reasonably available.3 Establish service availability before designing a septic system for a Dundee parcel.3 Where septic is appropriate, DOH-Polk evaluates, permits and inspects new and repaired septic systems throughout Polk County, with septic permits available from the Bartow Environmental Public Health Office.4 Polk County’s soil data rates only 1.6% of soils as not limited for conventional drain fields; this is countywide context, not a Dundee parcel determination or proof that septic is impossible, so obtain a site evaluation.114
Can you live in an RV or tiny home in Town of Dundee?
Dundee allows recreational vehicle parks only by special exception in the RMH district; that park rule does not establish permission to occupy an RV on an ordinary residential lot.2 We could not confirm private-lot RV occupancy, temporary RV living while building, or a Dundee rule specifically authorizing tiny-home occupancy; ask the Town Planning Department about the proposed use before buying.8 Dundee’s 500-square-foot floor-area standard applies to single-family attached development, so it cannot establish permission for a detached tiny home.5 An off-grid proposal must also account for Dundee’s required water and wastewater connection when Town services are reasonably available.3
Building a home in Town of Dundee: what steps come first?
- Ask Dundee Planning for parcel zoning verification and confirmation that the proposed dwelling use fits the Town’s district rules.82
- Establish whether Town water and wastewater are reasonably available; arrange required connections or discuss a septic site evaluation with DOH-Polk.34
- Return the Dundee building-permit application to Development Services and request the current fee sheets and forms.1
- Arrange Town construction inspections and direct certificate requests to the Town’s published certificate email.1
For a parcel outside Dundee town limits, use the Polk County guide for the county’s unincorporated-area zoning answer; the Town’s zoning rules described here concern land inside Dundee.122
Watch-outs
- Dundee’s attached-home lot and floor-area minimums do not establish the standards for a detached home; ask Town Planning for the parcel’s applicable schedule.958
- A Dundee off-grid plan may still require Town water and wastewater connections when those services are reasonably available.3
- We could not confirm Dundee-specific private-well routing, floodplain application steps or accessory-dwelling approval; ask Town Planning to identify the responsible office before committing to a design.8
Sources
- Town of Dundee Development Services Department — Building (townofdundee.com)
- Code of Ordinances, Town of Dundee, Florida (Town of Dundee), quoted and re-checked
- library.municode.com (Town of Dundee), quoted and re-checked
- Florida Department of Health in Polk County — Environmental Public Health (polk.floridahealth.gov)
- Article 3, Development design and improvement standards (Town of Dundee), quoted and re-checked
- 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
- 61G20-1.001 Florida Building Code Adopted (Florida statewide rule), quoted and re-checked
- Town of Dundee Planning Department (townofdundee.com)
- Article 3, Development design and improvement standards (Town of Dundee), quoted and re-checked
- Article 3, Development design and improvement standards (Town of Dundee), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- 2018 Eloise CRA Plan, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.