San Antonio, Florida building permit applications must receive San Antonio approval before submission to Dade City Building Department under the cities’ service agreement.1 San Antonio sets district-specific zoning rules, including minimum lot and home sizes in its A Agriculture district.23 Septic permits inside San Antonio, in Pasco County, come from the Florida Department of Health in Pasco County.4
At a glance
- Building applications
- San Antonio approval first, then Dade City Building Department1
- Zoning
- A Agriculture district has its own lot, home-size and setback requirements235
- Septic permits
- Florida Department of Health in Pasco County4
- RV living
- Living, sleeping or housekeeping use on private residential property limited to 10 days6
- A district home size
- Minimum 1,000 square feet of enclosed living space3
- Owner-builder
- Conditional Florida licensing exemption; building permits and code compliance still apply7
Who to call
Building permits
San Antonio Building Services / Permit Coordinator
City approval of building permit applications; starting contact for parcel zoning questions
32819 Pennsylvania Ave.
Building permits
Building permit services under the agreement with San Antonio, after San Antonio approval
38020 Meridian Ave.
Septic permits
Florida Department of Health in Pasco County
Septic permits and inspections inside San Antonio and elsewhere in Pasco County
7509 State Road 52
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in San Antonio means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in San Antonio, FL?
San Antonio building permit applications go through city approval before submission to Dade City Building Department; the cities have an agreement for building permit services.1 Start with San Antonio’s Permit Coordinator to establish the application requirements for your proposed home, addition or other work.1 Florida’s owner-builder exemption allows qualifying owners to act as their own contractor for a home for their own use, subject to direct supervision and other conditions; the exemption does not remove building permit or code requirements.7
Who handles San Antonio building permit applications?
San Antonio Building Services is the first stop for building permit applications, and Dade City Building Department provides the building permit services after San Antonio approval.1 Contact the San Antonio Permit Coordinator at 352-588-2127; Dade City Building Department is listed at 352-523-5050.18 Ask the city for the current review fee, required application documents and the route for zoning review before submitting your plans.1 Septic approval follows a separate route through the Florida Department of Health in Pasco County.4
Does San Antonio have zoning, lot-size and setback rules?
San Antonio’s A Agriculture district requires a minimum lot area stated in the code as 217,835 square feet (five acres).2 Single-family dwellings in that district need at least 1,000 square feet of enclosed living space.3 Main-building setbacks in the A district are generally 50 feet in front, 25 feet on the side and 50 feet at the rear; a street-abutting side yard has a 20-foot minimum, and an average-front-yard rule may apply.5 Ask San Antonio to identify the parcel’s district before using these dimensions: these are A district requirements, not a citywide minimum for every lot.25
How do septic permits work inside San Antonio?
New septic installations, repairs, modifications and approvals of existing systems inside San Antonio require a permit from the Florida Department of Health in Pasco County.4 The health department also continues to handle septic inspections.9 An existing septic tank therefore does not eliminate the approval question when a proposed project changes the system.4 Pasco County’s soil survey rates only 3.5% of soils as not limited for conventional septic drain fields; that countywide rating supports planning for a site evaluation, rather than assuming septic is impossible or that a particular city lot will work.10
Can you live in an RV or tiny home in San Antonio?
San Antonio limits living, sleeping or housekeeping use of camping and recreational equipment on private residential property to 10 days.6 Equipment stored outside a garage must be behind the front building line, although loading or unloading may occur anywhere on the premises.6 The private-property occupancy limit does not support using an RV as a long-term home while building.6 San Antonio’s flood-hazard rules separately require temporary RVs or park trailers to remain fewer than 180 consecutive days or be fully licensed and ready for highway use; that placement rule does not extend the residential occupancy allowance.116 We could not confirm general tiny-home or accessory-dwelling permission; ask San Antonio about the proposed dwelling and its zoning district.
Building a home in San Antonio: what should you check first?
Start by asking San Antonio to confirm the parcel’s zoning district and the proposed home’s fit with lot size, floor space and setbacks; the A Agriculture district has specific requirements for each.235 Arrange septic review with the Florida Department of Health in Pasco County if the project uses an onsite system.4 Obtain San Antonio’s approval of the building permit application before submitting to Dade City Building Department.1 For land outside city limits, use the Pasco County guide for the county’s building permit jurisdiction.12 We could not confirm city water-connection, driveway-access or lot-splitting requirements; ask San Antonio before committing to a parcel.
Watch-outs
- San Antonio’s A district dimensions do not establish the requirements for every zoning district.25
- The flood-hazard RV placement alternative does not override San Antonio’s 10-day private residential occupancy limit.116
- We could not confirm city-specific building review fees, tiny-home approval or private-well requirements; ask San Antonio’s Permit Coordinator before buying.1
Sources
- San Antonio Building Services / Permit Coordinator (sanantonioflorida.org)
- Code of Ordinances: Chapter 82 - ZONING, Sec. 82-2 (A) Agriculture zoning district (San Antonio), quoted and re-checked
- Code of Ordinances: Chapter 82 - ZONING, Sec. 82-2 (A) Agriculture zoning district (San Antonio), quoted and re-checked
- Onsite Sewage Treatment & Disposal Systems (OSTDS) - Florida Department of Health in Pasco County (San Antonio), quoted and re-checked
- Code of Ordinances: Chapter 82 - ZONING, Sec. 82-2 (A) Agriculture zoning district (San Antonio), quoted and re-checked
- Code of Ordinances: Chapter 82 - ZONING, Sec. 82-11 Supplementary regulations (San Antonio), quoted and re-checked
- 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
- Dade City Building Department (sanantonioflorida.org)
- Florida Department of Health in Pasco County (pasco.floridahealth.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Code of Ordinances: Chapter 70, Sec. 70-181 Temporary placement (San Antonio), quoted and re-checked
- Florida Statutes § 125.56 — Enforcement and amendment of the Florida Building Code (Florida statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.