Bolthole Index

Palm Beach County, Florida

Building permits, zoning and septic rules in Town of Manalapan, Florida

Town of Manalapan, Florida requires building permits for new residential construction and administers its own zoning.12 In Palm Beach County, septic permitting and inspection remain with the Florida Department of Health in Palm Beach County under the state DEP framework.3 Manalapan prohibits RVs and manufactured homes in flood hazard areas, and residential districts have specific minimum home sizes.4567

At a glance

Building permits
Town building permits required for new residential construction1
Zoning
Town zoning applies inside Manalapan2
Septic permits
Palm Beach County health department; DEP framework38
RV living
RVs prohibited in flood hazard areas4
Minimum home size
R1-A and R1-C: 2,000 sq ft ground floor; R1-B: 3,000 sq ft697
Owner-builder
State exemption is conditional; building permits still required10

Who to call

Building permits

Town of Manalapan Building Department

Town building-permit applications, inspections and flood-zone determination inquiries

561-383-2571

[email protected]

600 S. Ocean Blvd. Manalapan, FL 33462

Online permits →

Zoning

Town of Manalapan Zoning Department

Town zoning and architectural-review inquiries

561-383-2544

[email protected]

600 S. Ocean Blvd. Manalapan, FL 33462

Septic permits

Florida Department of Health in Palm Beach County — Environmental Public Health

Septic permitting, plan review and private-well location review

561-840-4500

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Town of Manalapan means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Town of Manalapan, FL?

Town of Manalapan requires a building-permit application and supporting documents for new residential construction; required building permits and Architectural Commission approval must be obtained before construction begins.1 The town’s minimum building-permit fee is $250, and fees are cumulative.11 Building-permit fees cover processing, building plan review and inspections, but exclude re-inspections and zoning review.11 Starting construction without required building permits or ARCOM approval triggers a fee equal to four times the required building-permit and/or ARCOM fee.11 Budget for the separate reviews before committing to a construction start date.11

Who handles building permits in Town of Manalapan?

The Town of Manalapan Building Department uses My Government Online (MGO) for new building permits and inspection scheduling.12 Create an account through the town’s linked portal to submit building-permit applications and schedule inspections.12 For current building-permit questions, contact the Building Department at 561-383-2571 or [email protected].12 The municipal office address is 600 S. Ocean Blvd. Manalapan, FL 33462.12 Next-day inspection requests must be scheduled before 4:00 PM.13 Septic permitting remains a separate health-department responsibility inside town limits.3

Does Town of Manalapan have zoning and minimum home sizes?

Town of Manalapan administers municipal zoning inside town limits.2 In R1-A and R1-C, single-family dwellings must have at least 2,000 square feet of ground-floor area, and dwelling units must have at least 1,400 square feet of floor area.69 R1-B instead requires at least 3,000 square feet of ground-floor area for a single-family dwelling.7 R1-A lot coverage cannot exceed 35 percent.14 For cluster development within a planned unit development, minimum yards are 25 feet front and rear and 10 feet on the sides, with an adjacent-garage exception.15 Those cluster standards are not a townwide setback schedule; ask the Town Zoning Department to identify the parcel’s district before sizing a house.1516

How do septic permits and wells work in Town of Manalapan?

Septic systems inside Town of Manalapan require permitting through the Florida Department of Health in Palm Beach County under DEP’s statewide framework.83 The health department reviews septic and well plans, and plan approval must precede issuance of a building permit.17 Final well and septic approvals must be recorded with the building department before a certificate of occupancy is issued.17 Well drillers submit location plans to the health department before drilling.17 Palm Beach County’s soil-survey figure is 0 percent rated not limited for conventional septic drain fields; that countywide rating calls for site evaluation and may mean an engineered system, rather than making septic impossible.18

Can you live in an RV or tiny home in Town of Manalapan?

Town of Manalapan prohibits recreational vehicles in flood hazard areas.4 Manufactured homes are also prohibited in those areas.5 These prohibitions are explicitly limited to flood hazard areas and do not establish an affirmative right to occupy an RV elsewhere in town.45 We could not confirm a separate town rule allowing temporary camping, tiny-home occupancy or accessory dwelling units; ask the Town Zoning Department about the proposed use and parcel.16 A small permanent home must still fit the applicable district’s minimum floor-area rules, including the substantial ground-floor minimums in R1-A, R1-B and R1-C.679

Building a home in Town of Manalapan: what are the steps?

  1. Ask the Town Zoning Department to identify the parcel’s zoning district and applicable architectural review; the department provides ARCOM and TCOM application information.216
  2. Prepare the town’s residential-construction submission: application, applicable affidavit, notice of commencement, cost estimate, survey/site plan, plans, product approvals, energy calculations, applicable flood documents and ARCOM/TCOM approval.19
  3. Obtain health-department approval if the project uses septic, before the building permit is issued.1917
  4. Create an MGO account, submit the building-permit application and obtain required approvals before starting work.191
  5. Schedule construction inspections through MGO and complete required septic or well approvals before occupancy.1317

What should you check before buying in Town of Manalapan?

Ask the Town Building Department about flood-zone determination before choosing an RV, manufactured home or building design; Manalapan’s flood-hazard rules prohibit those housing types and impose flood-resistant construction requirements even on structures exempt from the Florida Building Code.124520 We could not confirm district minimum lot sizes or a separate driveway-access approval rule; bring the survey and proposed driveway to the Town Zoning Department and Building Department.1612 Florida’s owner-builder exemption requires direct onsite supervision and construction for the owner’s use, and does not remove building-permit or code-compliance obligations.10 For land outside town limits, use the Palm Beach County guide; the county’s general zoning framework applies to unincorporated land.21

Watch-outs

  • Manalapan’s RV and manufactured-home prohibitions apply in flood hazard areas; do not assume an RV is an approved temporary residence elsewhere.45
  • Building-permit fees exclude zoning review and re-inspections, and starting without required approvals increases the applicable fees fourfold.11
  • We could not confirm off-grid sanitation approval in Manalapan; ask the Palm Beach County health department before designing an alternative waste system.17

Sources

  1. Building Department – Town of Manalapan (Town of Manalapan), quoted and re-checked
  2. Zoning Department – Town of Manalapan (Town of Manalapan), quoted and re-checked
  3. Wastewater Systems – Florida Department of Health in Palm Beach County (Town of Manalapan), quoted and re-checked
  4. § 153.106 Flood resistant development for buildings and structures (Town of Manalapan), quoted and re-checked
  5. § 153.106 Flood resistant development for buildings and structures (Town of Manalapan), quoted and re-checked
  6. library.municode.com (Town of Manalapan), quoted and re-checked
  7. library.municode.com (Town of Manalapan), quoted and re-checked
  8. Wastewater Systems – Florida Department of Health in Palm Beach County (Town of Manalapan), quoted and re-checked
  9. library.municode.com (Town of Manalapan), quoted and re-checked
  10. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  11. Building Permit Fees – Town of Manalapan (Town of Manalapan), quoted and re-checked
  12. Town of Manalapan Building Department (manalapan.org)
  13. Building Department – Town of Manalapan (Town of Manalapan), quoted and re-checked
  14. library.municode.com (Town of Manalapan), quoted and re-checked
  15. § 151.618 Regulations governing planned unit developments (Town of Manalapan), quoted and re-checked
  16. Town of Manalapan Zoning Department (manalapan.org)
  17. Florida Department of Health in Palm Beach County — Environmental Public Health (palmbeach.floridahealth.gov)
  18. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  19. Building Department – Town of Manalapan (Town of Manalapan), quoted and re-checked
  20. § 153.106 Flood resistant development for buildings and structures (Town of Manalapan), quoted and re-checked
  21. Planning, Zoning & Building - Zoning (2026 county census)

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Manalapan

Town of Manalapan’s own rules

  • Building permitRequired

    New building permits and residential new construction inside Manalapan town.

    • A permit application and required supporting documents must be submitted.
    • Any person, firm, or business must have business registration before beginning work in Town.
    “Failure or refusal by the owner or the owner’s contractor to obtain proper Building Permit(s) and/or Architectural Commission approval prior to the commencement of construction activities will result in a fee equal to four (4) times the required ARCOM fee and/or building permit fee.”
  • InspectionsRequired

    Permitted construction inside Manalapan town.

    • Inspections are scheduled through MGO.
    • Next-day inspections must be scheduled before 4:00 PM.
    “Please create an account to submit your permits and schedule inspections. For next-day inspections, please schedule before 4:00 PM”
  • Local zoningPresent

    Land inside Manalapan town limits.

    “Department mission is to preserve the unique character, beauty, and quality of life of the Town of Manalapan by administering fair and consistent zoning regulations, guiding responsible development, and ensuring that land use and architectural standards protect the community’s residential character and coastal environment.”
  • Minimum dwelling sizeSpecified

    Single-family dwellings in the R1-A district.

    • Open or screened porches receive fifty percent credit.
    • The total ground-floor area of any building plus accessory structure may not exceed two-thirds of the building area.

    minimum single-family dwelling ground-floor area: >= 2000 square feet · minimum dwelling-unit floor area: >= 1400 square feet

    “No single-family dwelling shall have a ground floor square foot area less than two thousand (2,000) square feet and no dwelling unit shall have a floor square foot area less than one thousand four hundred (1,400) square feet.”
    2 more reviewed findings on this topic
    • Specified — Single-family dwellings in the R1-B district.
      “No single-family dwelling shall have a ground floor square foot area less than three thousand (3,000).”
    • Specified — Single-family dwellings in the R1-C district.
      “No single-family dwelling shall have a ground floor square foot area less than two thousand (2,000) square feet and no dwelling unit shall have a floor square foot area less than one thousand four hundred (1,400) square feet.”
  • SetbacksSpecified

    Cluster development within a planned unit development inside Manalapan town.

    • The yard standards apply to cluster development.
    • Side yards are 10 feet except for the garage exception.

    front yard: 25 feet · side yard: 10 feet (Adjacent-lot garages may join at the property line or be grouped away from the individual lot.) · rear yard: 25 feet

    “Minimum yard requirements in a cluster development shall be: (a) Front yard, twenty-five (25) feet. (b) Side yard, ten (10) feet except that garages upon an adjacent lot may join at the property line or be grouped on land away from the individual lot. (c) Rear yard, twenty-five (25) feet.”
  • Lot coverageSpecified

    Lots in the R1-B district.

    • Coverage uses 50 percent of the lot portion east of State Road A-1-A and 100 percent west of it.
    • Driveways, vehicular parking areas, pool decks, patios and lanais count at 50 percent; walkways and grass pavers are excluded.

    maximum lot coverage: <= 35 percent (District calculation formula and exclusions apply.)

    “Lot coverage shall not exceed thirty-five (35) percent of the total area created by the sum of fifty (50) percent of that portion of the lot or lot of record which is located east of State Road A-1-A plus one hundred (100) percent of that portion of the lot or lot of record which is located west of State Road A-1-A.”
    One more reviewed finding on this topic
    • Specified — Lots in the R1-A district.
      “Lot coverage shall not exceed thirty-five (35) percent regardless of which side of Highway A1A the single family dwelling is located.”
  • Building heightSpecified

    Principal and accessory structures in the R3-A district.

    • A single-story structure may not exceed 14 feet.
    • A non-tiered two-story structure may not exceed 24 feet; a tiered two-story structure may not exceed 28 feet.
    • Pitched-roof overall height may add 10 feet and flat-roof overall height may add 4 feet, subject to exceptions.

    maximum building height: <= 28 feet (Two stories or 28 feet, whichever is less.) · maximum accessory-structure height: <= 14 feet (One story or 14 feet, whichever is less.)

    “No building shall exceed two (2) stories or twenty-eight (28) feet in height, whichever is less and no accessory structures shall exceed one (1) story or fourteen (14) feet in height, whichever is less.”
  • Living in an RVProhibited

    Recreational vehicles in flood hazard areas inside Manalapan town.

    • The prohibition is limited to flood hazard areas.
    “Recreational vehicles, defined in F.S. § 320.01, are not permitted in flood hazard areas.”
  • Manufactured homesProhibited

    Manufactured homes in flood hazard areas inside Manalapan town.

    • The prohibition is limited to flood hazard areas.
    “Manufactured homes, defined in 15C- 1.0101, F.A.C., are not permitted in flood hazard areas.”
  • Building in a floodplainRequired

    Development in flood hazard areas inside Manalapan town.

    • FBC-exempt structures must comply with ASCE 24.
    • Structures seaward of the coastal construction control line must comply with the more restrictive applicable Florida Building Code requirements.
    • Minor and non-habitable major structures must comply with the chapter and ASCE 24.
    “buildings, structures, and facilities that are exempt from the Florida Building Code, including substantial improvement or repair of substantial damage of such buildings, structures and facilities, shall be designed and constructed in accordance with the flood load and flood resistant construction requirements of ASCE 24.”
  • Permit feesPublished (with conditions)

    Building permits inside Manalapan town.

    • Fees are cumulative.
    • The permit fee excludes re-inspections and zoning review.
    • Failure to obtain required permits or ARCOM approval before construction results in four times the required ARCOM and/or building-permit fee.

    standard fee up to $2750 valuation: 250 USD · additional fee $2750-$2500000 valuation: 2.7 percent · additional fee over $2500000 valuation: 2 percent · minimum permit fee: 250 USD · sub-permit fee: 75 USD · plan revision base fee: 100 USD · additional fee per plan sheet/page/attachment: 20 USD

    “Building Permit Fee includes permit processing, building plan review and inspections excluding re-inspections and Zoning review.”
  • Permit processPublished (with conditions)

    Building-permit applications inside Manalapan town.

    • Applicants must create an MGO account.
    • Residential new-construction submissions require the listed application, affidavit if applicable, notice of commencement, cost estimate, survey/site plan, plans, product approvals, energy calculations, flood documents where applicable, health-department approval if on septic, and ARCOM/TCOM approval.
    “THE FOLLOWING INFORMATION & DOCUMENTS ARE REQUIRED FOR PERMIT PROCESSING”

Rules another office applies inside Town of Manalapan

Town of Manalapan does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicMixed (with conditions)

    Onsite sewage treatment and disposal systems inside Manalapan town.

    • DEP implements the applicable OSTDS statutes and regulations; the Palm Beach County health department continues permitting and inspection.
    “Effective July 1, 2021, the Florida Department of Environmental Protection (DEP) is responsible for implementing the Florida Statutes and regulations applicable to OSTDS. Under Florida’s Clean Waterways Act of 2020, the county health department offices will continue to do the permitting and inspection for septic tanks; please continue to work with them for all of your permitting-related needs.”
  • Septic permitRequired

    Septic tanks and OSTDS inside Manalapan town.

    • Palm Beach County health department offices perform septic permitting under DEP's OSTDS framework.
    “The Florida Department of Health in Palm Beach County is charged with regulating, permitting and monitoring proper onsite sewage treatment and disposal.”
  • Septic inspectionRequired

    Septic systems inside Manalapan town.

    • Private-provider inspections may be used by owners or contractors with owner authorization beginning July 1, 2022.
    “the county health department offices will continue to do the permitting and inspection for septic tanks; please continue to work with them for all of your permitting-related needs.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Manalapan or Palm Beach County directly.

  • Minimum lot size — Minimum lot size in Manalapan town zoning districts.
  • Camping on your land — Temporary camping inside Manalapan town.
  • Tiny homes — Tiny-home occupancy inside Manalapan town.
  • Accessory dwellings — Accessory dwelling units inside Manalapan town.
  • Off-grid sanitation — Off-grid sanitation inside Manalapan town.
3 more unanswered
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Manalapan publishes no rule on the point, not that none exists. Palm Beach County’s page lists the county offices to call.

← All of Palm Beach County: county rules, score and offices