Building permits, zoning and land rules in Groveland, Florida

Groveland, Florida requires building permits for residential construction through the city Building Division.1 Groveland sets its own zoning; Lake County Environmental Health handles septic permitting where septic is applicable.23 Groveland’s sewer-connection requirement can determine whether a septic plan is appropriate, so resolve wastewater service before designing a home.4

At a glance

Building permits
City Building Division issues residential and commercial building permits1
Zoning
City zoning districts have their own use tables25
Septic permits
Lake County Environmental Health; subject to city sewer requirements34
RV living
Habitation prohibited under residential-zone RV storage rules; Agriculture zoning excluded from those standards67
Owner-builder
Conditional exemption available; city application includes owner-builder documents8
Wells
Separate well permit required; Lake County Environmental Health regulates well permits9
Floodplain development
Separate approval before work where city floodplain regulations apply10

Who to call

Building permits

Groveland Building Division

City residential and commercial building permits and construction inspections

352-429-2141 Ext. 2

[email protected]

6825 SR 50 2nd Floor Groveland, FL 34736

Online permits →

Planning & zoning

Groveland Planning & Zoning Division

City zoning and land-use questions

352-429-2141

[email protected]

Septic permits

Florida Department of Health in Lake County, Environmental Public Health

Onsite sewage treatment and disposal and well construction services in Lake County

352-253-6130

[email protected]

320 W. Main Street, Tavares, FL 32778

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Groveland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Groveland, Florida?

Groveland’s Building Division issues building permits for residential and commercial construction inside city limits and schedules inspections during construction.111 Florida’s statewide building code applies to residential construction, with statutory exemptions for specified buildings.12

Groveland offers an owner-builder application route with disclosure and affidavit documents.8 Florida’s owner-builder exemption requires an eligible home to be for the owner’s use rather than sale or lease, with direct onsite supervision of work not performed by licensed contractors; the exemption does not remove building-permit or code obligations.13

Who issues building permits in Groveland, and where do you apply?

The Groveland Building Division is the city office for residential and commercial building permits, while construction inspections are scheduled through the city’s inspection services.111 Reach Groveland Building Division at 352-429-2141 Ext. 2 or [email protected]; schedule building inspections through eTRAKiT.14

Groveland’s residential application materials call for an application, property record card, notice of commencement, plans, product approvals, plot plan, water conservation application, and applicable impact-fee and septic documentation.15 Treat the city building application and any septic application as distinct approvals: the residential checklist requires a septic tank permit when applicable, and Lake County Environmental Health administers septic permitting.3

Does Groveland have zoning, and what does it mean for your lot?

Groveland has city zoning, with permitted-use tables for its zoning districts; each Community Type and Special District has its own use table.25 Ask Groveland Planning & Zoning to identify the parcel’s district and confirm the proposed home’s use, setbacks, lot size, height and lot coverage before commissioning plans.2

We could not confirm Groveland’s district-specific numeric lot-size, setback or minimum dwelling-size standards, or the approval path for accessory dwellings; ask the city Planning & Zoning Division for the applicable schedule.5 Florida’s accessory-dwelling statute authorizes local ordinances but does not itself require every municipality to allow accessory dwellings.16

Reach Groveland Planning & Zoning at 352-429-2141 or [email protected] for parcel-specific answers.17

How do septic permits and sewer connections work in Groveland?

Lake County Environmental Health administers septic permitting for Groveland properties where a septic system is applicable, and the city residential checklist requires the septic tank permit.3 Groveland requires buildings and trailers on lots inside city limits to connect to public sewer within 3 months after notification by the city manager or designee.4 Resolve the city’s sewer requirement before paying for a septic design.4

Florida requires septic permits for installation, replacement, repair, modification or abandonment and a site evaluation to establish system suitability.18 Lake County’s soil figures are countywide: only 3.7% of soils rate not limited for a conventional septic drain field, which supports budgeting for a site evaluation or engineered system rather than assuming septic is impossible.19

Can you live in an RV or tiny home on land in Groveland?

Groveland’s residential-zone RV parking and storage standards prohibit habitation of parked or stored RVs, boats and trailers and require a permitted principal structure on the lot rather than vacant land.6 Those standards exclude Agriculture zoning, but that exclusion does not establish permission to live in an RV or exemption from other city land-use rules.7

We could not confirm a general private-land camping allowance or a specific tiny-home occupancy rule in Groveland; ask the city Planning & Zoning Division about the proposed dwelling and parcel before buying.2 Do not treat the short-term loading, unloading or cleaning exception as residential permission: the cited residential-zone rule prohibits habitation.6

What are the steps to build a home in Groveland?

  1. Ask Groveland Planning & Zoning to identify the parcel’s zoning district and verify the proposed use against its use table.25
  2. Resolve sewer service with the city; if septic is applicable, obtain the required approval through Lake County Environmental Health.43
  3. Assemble the city’s residential building-permit materials, including plans, plot plan and applicable supporting approvals.15
  4. Obtain city floodplain development approval before work where the floodplain regulations apply, and a driveway permit before qualifying improvements in a public street or designated street right-of-way.1020
  5. Obtain the city building permit and arrange required construction inspections.111

What stays with Lake County when you build in Groveland?

Groveland’s city building permits and zoning do not replace Lake County Environmental Health’s septic and well permitting functions.1239 Lake County Environmental Health lists onsite sewage treatment and disposal and well construction among its services.21 For land outside Groveland city limits, use the Lake County guide for the county’s unincorporated-area building and zoning answers.2223

Groveland’s floodplain application requires approval before work begins where applicable and states that no floodplain development permit is required when the parcel is outside a special flood hazard area.10 Florida’s bona fide agricultural exemption is for nonresidential farm buildings, fences and signs, excludes urban agriculture, and preserves floodplain-management requirements; it does not exempt a farmhouse as a residential dwelling.24

Watch-outs

  • Groveland’s Agriculture-zoning exclusion from residential RV storage standards is not an affirmative RV habitation allowance; ask city Planning & Zoning about the parcel.7
  • The sewer ordinance’s 5,000-foot limitation applies outside Groveland city limits, so do not use that distance as an inside-city exemption.4
  • We could not confirm Groveland’s tiny-home, temporary camping or district-specific dimensional requirements; ask city Planning & Zoning before committing to a parcel.2

Sources

  1. Building Division (Groveland), quoted and re-checked
  2. Community Development Code, Section 5.3 Uses (Groveland), quoted and re-checked
  3. Residential Permit Checklist (Groveland), quoted and re-checked
  4. Section 78-119. Connections with sewer required (Groveland), quoted and re-checked
  5. Community Development Code, Section 5.3 Uses (Groveland), quoted and re-checked
  6. library.municode.com (Groveland), quoted and re-checked
  7. Community Development Code, Section 8.1 General Requirements (Groveland), quoted and re-checked
  8. Applications & Forms (Groveland), quoted and re-checked
  9. Environmental Public Health (Groveland), quoted and re-checked
  10. Floodplain Development Permit Application (Groveland), quoted and re-checked
  11. Building Division (Groveland), quoted and re-checked
  12. Florida Statutes § 553.73 — Florida Building Code (Florida statewide rule), quoted and re-checked
  13. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  14. Groveland Building Division (groveland-fl.gov)
  15. Building Division (Groveland), quoted and re-checked
  16. Florida Statutes § 163.31771: Accessory dwelling units (Florida statewide rule), quoted and re-checked
  17. Groveland Planning & Zoning Division (groveland-fl.gov)
  18. OSTDS Construction Application (Florida statewide rule), quoted and re-checked
  19. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  20. Section 66-64. Permits required; fees; posting permit (Groveland), quoted and re-checked
  21. Florida Department of Health in Lake County, Environmental Public Health (lake.floridahealth.gov)
  22. Single Family Residential Permit Checklist (2026 county census)
  23. Planning & Zoning - Lake County Government (2026 county census)
  24. F.S. 604.50 — Nonresidential farm buildings; farm fences; farm signs (Florida statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Groveland

Groveland’s own rules

  • Building permitRequired

    Residential and commercial construction inside Groveland city limits.

    • The Building Division issues residential and commercial permits.
    • Floodplain development separately requires a permit before work starts when applicable.
    “The Building Division issues residential and commercial permits”
  • Owner-builder exemptionAvailable (with conditions)

    Owner-builders applying for construction permits inside Groveland city limits.

    • The city's application materials include an Owner Builder Disclosure Statement and an Owner/Builder Affidavit if applicable; specific statutory eligibility conditions were not extracted.
    “owner-builder permit under an exemption from the law.”
  • InspectionsRequired

    Construction requiring city building permits inside Groveland city limits.

    • The city schedules building inspections during construction.
    • Floodplain applications authorize reasonable compliance inspections.
    “schedules building inspections as needed during the construction process.”
  • Local zoningPresent

    Land inside Groveland city limits; the city Community Development Code establishes zoning districts and use tables.

    “Each use table outlines the permitted uses in each Zoning District.”
  • Zoning districtsPublished

    Groveland city zoning districts and their use tables.

    • Each Community Type and Special District has its own use table.
    • The retrieved excerpt does not provide the complete district schedule or dimensional standards.
    “Each Community Type and Special District includes its own use table.”
  • Living in an RVLimited

    Parking, storage, and habitation of recreational vehicles on property in Groveland residential zoning districts.

    • The standards apply to residential zoning districts but exclude Agriculture zoning.
    • The lot must contain a permitted principal structure and may not be vacant.
    • No more than one RV, boat, or trailer per dwelling unit may be stored in a required front yard or required backyard.
    • The vehicle must be registered, moveable, maintained, and not used as a residence.
    • Short-term loading, unloading, or cleaning is exempt for up to two 24-hour periods in any seven-day period.

    maximum RVs in required front yard: 1 per dwelling unit · maximum RVs in required backyard: 1 per dwelling unit · loading/unloading/cleaning exemption: <= 2 24-hour periods in any seven-day period

    “No parked or stored recreational vehicle, boat, or trailer shall be inhabited”
  • Mandatory utility hookupSewer (with conditions)

    Every lot or parcel within Groveland city limits on which a residential, commercial, or industrial building or trailer is situated.

    • Connection and use are required within three months after notification by the city manager or designee.
    • Connections must follow city council rules and charges.
    • The ordinance's 5,000-foot limitation is expressly stated for land outside city limits.

    connection deadline after city notification: 3 months · outside-city sewer-line distance limitation: > 5000 feet (The quoted limitation applies outside the city limits.)

    “shall connect or cause such building or trailer to be connected with the public sewer facilities”
  • Agricultural exemptionConditional

    Parking and storage of recreational vehicles, boats, and trailers in Agriculture zoning inside Groveland city limits.

    • The residential-zone RV storage standards expressly exclude Agriculture zoning.
    • This is an exemption from the cited residential storage standards, not a general exemption from all city permits or land-use regulations.
    “in a residential zoning district, not including Agriculture zoning”
  • Driveway accessRequired

    Construction, alteration, or removal of a driveway or related improvement on a public street or designated street right-of-way inside Groveland city limits.

    • A permit must be obtained before the improvement.
    • Permit fees are established by resolution and the permit must be posted at the construction site.
    “without obtaining a permit authorizing such improvement.”
  • Building in a floodplainRequired

    Development located in a special flood hazard area or otherwise subject to Groveland floodplain regulations.

    • No work may begin before permit issuance.
    • If the parcel is not in a special flood hazard area, the application states that no floodplain development permit is required.
    • The permit expires if work does not begin within six months and becomes void if work is not substantially completed within one year.
    • Additional state, local, and federal permits may be required.

    permit expiration if work has not commenced: 6 months · permit void if work not substantially completed: 1 year

    “No work of any kind may start until a permit is issued.”
  • Permit processPublished (with conditions)

    Building and related permit processing inside Groveland city limits.

    • Residential permit materials require an application, property record card, notice of commencement, plans, product approval, plot plan, water conservation application, and applicable impact-fee and septic documentation.
    • The city provides online permit and inspection services through eTRAKiT.
    “Application [...] Property Record Card [...] Notice of Commencement [...] Plans”

Rules another office applies inside Groveland

Groveland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic permitRequired

    Onsite sewage systems inside Groveland city limits when a septic system is otherwise applicable.

    • The city residential permit checklist requires a septic tank permit if applicable.
    • Lake County Environmental Health lists septic system permitting as an administered function.
    • City policy may prohibit septic tanks within 500 feet of a sewer line unless the stated exception applies.
    “□ Septic Tank Permit (if applicable) Revised 12/2023”
  • Well permitRequired

    Private well permits inside Groveland city limits.

    • Lake County Environmental Health lists well permits among the programs it regulates.
    • The city permit materials also identify wells as requiring a separate permit in the construction checklist materials.
    “a separate permit must be secured for [...] WELLS”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Groveland or Lake County directly.

  • Minimum dwelling size — Minimum dwelling size inside Groveland city limits.
  • Minimum lot size — Minimum lot size inside Groveland city limits.
  • Setbacks — Building setbacks inside Groveland city limits.
  • Lot coverage — Lot coverage inside Groveland city limits.
  • Building height — Building height inside Groveland city limits.
5 more unanswered
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Groveland publishes no rule on the point, not that none exists. Lake County’s page lists the county offices to call.

← All of Lake County: county rules, score and offices