The City of Blountstown, Florida issues building permits within the city limits1. The city also has its own land development regulations with land use districts2. Septic permits for lots inside Blountstown are still required and now go through the Florida Department of Environmental Protection, not the city3. Land outside the city falls under Calhoun County.

At a glance

Building permits
Issued by the City of Blountstown inside city limits1
Zoning
City land development regulations with land use districts2
Septic
Permit required; applications go to Florida DEP43
Flood areas
Floodplain development permit required before work5
RV living
Floodplain rule: under 180 consecutive days unless highway-ready; other zoning rules unconfirmed6
Mobile homes
Allowed in several districts under conditions7
Building permit fees
Set by the city council; city posts a fee schedule8

Who to call

Building permits

City of Blountstown building permits

Building permits inside Blountstown city limits

Codes & inspections

Blountstown City Hall

Main city number for building permits, zoning questions and city utilities

850.674.5488

[email protected]

20591 Central Ave. West Blountstown, FL 32424

Building permits

Blountstown building permit forms

Permit application, owner-as-contractor disclosure and related forms

Planning & zoning

Blountstown Land Development Regulations, Article II

Land use districts and the uses allowed in each

Planning & zoning

Blountstown mobile home ordinance (land development code section 2.01.19)

Where single mobile homes may be placed inside the city

Septic permits

Florida Department of Environmental Protection, Onsite Sewage Program

Septic (OSTDS) permit applications for Calhoun County, including lots inside Blountstown

850-245-2118

[email protected]

3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Contact details are copied from each office’s official page and were checked against it on October 16, 2026.

Off-grid gear

Going off-grid in Blountstown means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Blountstown, Florida?

Yes. The City of Blountstown issues building permits within the city limits1, so a home or addition inside the city is permitted by the city, not by Calhoun County. Inside a flood hazard area, development also needs a floodplain development permit from the floodplain administrator before work starts5. Manufactured homes placed in a flood area are inspected by the city's building official9. We could not confirm the city's owner-builder rules or certificate of occupancy process, so ask City Hall before you pull a permit yourself.

Who issues building permits in Blountstown, and how do you reach them?

City Hall at 20591 Central Ave. West is the contact point: call 850.674.5488 or email [email protected]10. The city's permit page links a fee schedule and an application packet that includes a development order application and an owner-as-contractor disclosure11. Fee amounts are set by the city council from time to time8. Calhoun County's Building Department serves unincorporated land; see the Calhoun County page for land outside the city.

Does Blountstown have zoning, and what does it mean for mobile homes and RVs?

Blountstown has its own land development regulations that establish land use districts and regulate the uses of land in each2. Single mobile homes are permitted on individual lots in several districts, but only one single-family unit is allowed per lot, and the unit must have its wheels, axles and tow bars removed7. For RVs, the city code we reviewed only addresses flood hazard areas: an RV there must be on site fewer than 180 consecutive days or be fully licensed and highway-ready6. We could not confirm minimum lot sizes, setbacks or whether living in an RV is allowed in each district, so ask City Hall and read the district chapter before you buy.

How do septic permits work inside Blountstown?

The city code makes it unlawful to install a septic tank system without a permit4, and it bars septic tanks within 200 feet of the sewer line12. Where sewer is more than 200 feet from the lot, a dwelling is not required to connect13. The city code still names the county public health unit as the issuer14, but Calhoun County applicants now apply through Florida DEP with form DEP4015, a site plan and a floor plan3. Call DEP at 850-245-211815. Conventional drain-field soils are limited in the county, so expect a site evaluation16.

Building a home in Blountstown: the steps, in order

  1. Ask City Hall at 850.674.5488 which zoning district the lot is in and whether sewer is within 200 feet104.
  2. If the lot is in a flood hazard area, apply for the floodplain development permit5.
  3. If no sewer is available, apply to Florida DEP for the septic permit and site evaluation3.
  4. Submit the city's building permit application and forms11.
  5. Get the city's final approvals; a final septic approval must be issued not more than 60 days before electrical service is connected17.

What stays with Calhoun County, and what to check before you buy?

Septic permits for every address in Calhoun County, city or not, run through Florida DEP3. Land outside Blountstown is governed by the county's rules, covered on the Calhoun County page. Wells are permitted through the water management district or its delegate, not the city18. County-level numbers: Calhoun County's effective property tax rate is 0.6%19 and annual precipitation is about 57 inches20.

Watch-outs

  • We could not confirm the city's zoning district rules for lot size, setbacks or RV living; ask City Hall at 850.674.5488 before relying on any assumption10.
  • Inside flood hazard areas, a floodplain development permit is required before work, and other state and federal permits may apply5.
  • Do not start a septic system before the permit is issued; the city bars septic within 200 feet of the sewer line12.

Sources

  1. City of Blountstown building permits (blountstownfl.govoffice3.com)
  2. Blountstown Land Development Regulations, Article II (blountstownfl.govoffice3.com)
  3. Onsite Sewage FAQ - Permitting, quoted and re-checked
  4. Blountstown Code Sec. 10-1 Septic tanks and sewage disposal requirements (Blountstown), quoted and re-checked
  5. Blountstown Code Sec. 19-4 Permits (floods) (Blountstown), quoted and re-checked
  6. Blountstown Code Sec. 19-35 Recreational vehicles and park trailers (Blountstown), quoted and re-checked
  7. Blountstown mobile home ordinance (land development code section 2.01.19) (blountstownfl.govoffice3.com)
  8. Blountstown Code Sec. 10-32 Building permit fees (Blountstown), quoted and re-checked
  9. Blountstown Code Sec. 19-6 Inspections (Blountstown), quoted and re-checked
  10. Blountstown City Hall (blountstownfl.govoffice3.com)
  11. Blountstown building permit forms (blountstownfl.govoffice3.com)
  12. Blountstown Code Sec. 40-52 Septic tanks (Blountstown), quoted and re-checked
  13. Blountstown Code Sec. 40-44 Same—With sewer system (Blountstown), quoted and re-checked
  14. Blountstown Code Sec. 10-1 Septic tanks and sewage disposal requirements (Blountstown), quoted and re-checked
  15. Florida Department of Environmental Protection, Onsite Sewage Program (floridadep.gov)
  16. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  17. Blountstown Code Sec. 10-1 Septic tanks and sewage disposal requirements (Blountstown), quoted and re-checked
  18. Water Well Contractor Licensing and Permitting (Florida statewide rule), quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Annual precipitation: Bolthole Index county data

Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Blountstown

Blountstown’s own rules

  • Building permitLimited

    Development in flood hazard areas inside Blountstown city

    • Applies to development wholly or partly within a flood hazard area; no permit and other state or federal permits must be obtained before work.
    • General building permit requirement outside flood areas not verified.
    “shall first make application to the floodplain administrator, and the building official if applicable, and shall obtain the required permit(s) and approval(s).”
  • InspectionsLimited

    Manufactured homes and floodplain development inside Blountstown city flood hazard areas

    • Certification of lowest-floor elevation must be submitted to the building official upon placement.
    “the building official shall inspect manufactured homes that are installed or replaced in flood hazard areas to determine compliance with the requirements of this chapter and the conditions of the issued permit.”
  • Living in an RVLimited

    RVs and park trailers in flood hazard areas inside Blountstown city

    • Temporary placement: fewer than 180 consecutive days, or fully licensed and highway-ready with only quick-disconnect utilities.
    • Otherwise must meet manufactured-home requirements of section 19-34.
    • Zoning rules for RVs outside flood areas not verified.

    temporary placement: < 180 days (or highway-ready)

    “Be on the site for fewer than 180 consecutive days; or”
  • Manufactured homesLimited

    Manufactured homes in flood hazard areas inside Blountstown city

    • Licensed installer, permanent reinforced foundation, anchoring and elevation required.
    • Zoning-based placement rules not verified.
    “All new manufactured homes and replacement manufactured homes installed in flood hazard areas shall be installed on permanent, reinforced foundations”
  • Who permits septicCounty (with conditions)

    Septic systems inside Blountstown city; the county public health unit issues the permits under the city code

    • City bars septic tanks other than those state-approved and any within 200 feet of the sewer line.
    “it shall be unlawful for any person to construct, install, or commence the installation of a septic tank system or other device for sewage disposal unless or until there has first been obtained a septic tank construction permit or existing tank approval for the same, issued from the office of the county public health unit.”
  • Septic permitRequired

    Installing a septic system inside Blountstown city

    • Not applicable to lots served by an existing community or public sewage system.
    • Septic prohibited within 200 feet of the sewer line.
    “it shall be unlawful for any person to construct, install, or commence the installation of a septic tank system or other device for sewage disposal unless or until there has first been obtained a septic tank construction permit or existing tank approval for the same, issued from the office of the county public health unit.”
  • Septic inspectionRequired

    Final septic system approval before electrical service inside Blountstown city

    • Final system approval permit must be issued not more than 60 days before electrical connection.
    • Structures served by a municipal sewer need written acceptance for service instead.

    approval validity before electric connection: <= 60 days

    “a final system approval permit or existing tank approval issued by the county public health unit for the structure not more than 60 days prior to the connection or installation of electrical service.”
  • Off-grid sanitationLimited

    Septic or alternative sewage disposal inside Blountstown city

    • Only state-approved septic tanks; none within 200 feet of the sewer line; county public health unit permit required.

    septic distance from sewer line: >= 200 feet

    “no septic tanks, other than those approved by the state department of environmental regulation, shall be constructed within the corporate limits of the city. no septic tank shall be constructed within 200 feet of the sewer line.”
  • Mandatory utility hookupSewer (with conditions)

    Buildings or trailers used as dwellings on lots inside Blountstown city

    • Connect within three months after notification by the city manager.
    • No connection required where the sewer line is more than 200 feet from the lot.
    • Water connection requirement not verified.

    sewer distance threshold: <= 200 feet (no connection required beyond 200 feet) · time to connect after notice: <= 3 months

    “no connection shall be required where the sewer system or line is more than 200 feet from such lot or parcel of land.”
  • Building in a floodplainRequired

    Development in flood hazard areas inside Blountstown city

    • Applies to development wholly or partially within a flood hazard area.
    • Other state and federal permits must also be obtained.
    “shall first make application to the floodplain administrator, and the building official if applicable, and shall obtain the required permit(s) and approval(s).”
  • Permit feesVariable (with conditions)

    Building permit fees inside Blountstown city

    • Amounts are set by the city council from time to time; the fee schedule was not retrieved.
    “fees to be charged by the city shall be set from time to time by the city council.”
  • Permit processPartial

    Floodplain development permit applications inside Blountstown city

    • Written application on city form with site plan, valuation and signature; permit invalid if work not commenced within 180 days.
    • General building permit process not retrieved.

    permit expiration if work not commenced: <= 180 days (extensions up to 180 days each)

    “a floodplain development permit or approval shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Blountstown or Calhoun County directly.

  • Owner-builder exemption — Owner-builder exemption inside Blountstown city
  • Certificate of occupancy — Certificates of occupancy inside Blountstown city
  • Local zoning — Zoning inside Blountstown city
  • Zoning districts — Zoning districts inside Blountstown city
  • Minimum dwelling size — Minimum dwelling size inside Blountstown city
11 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Blountstown publishes no rule on the point, not that none exists. Calhoun County’s page lists the county offices to call.

← All of Calhoun County: county rules, score and offices