Building permits, zoning and land rules in Las Animas County, Colorado

55Index Score / 100
#29 of 64 in Colorado

Unincorporated Las Animas County, Colorado requires building permits for construction, and the county Building Department calculates the fee from the project's value12. County zoning also applies outside municipal boundaries, while septic permits come from the Las Animas-Huerfano Counties District Health Department34.

At a glance

Building permit
Required for construction in unincorporated Las Animas County1
Zoning
County zoning applies outside incorporated municipalities3
Septic permit
Required before installing an onsite wastewater treatment system5
Tiny home
State-regulated units may serve as long-term housing, but county zoning still controls the site63
RV living
Private-land occupancy rules could not be confirmed; ask the county Land Use Office7
Private well
A new groundwater-diverting well generally needs a Colorado well permit8
Floodplain development
A county permit is required before development begins in a Special Flood Hazard Area9

Who to call

Building permits

Las Animas County Building Department

County building permits, permit-fee determination and building inspections

719-845-2577

200 East 1st Street, Room 104, Trinidad, Colorado 81082

Online permits →

Planning & zoning

Las Animas County Land Use Office

Land divisions, subdivisions, rezoning and other land-use applications

719-845-2577

200 East 1st Street, Room 104, Trinidad, Colorado 81082

Septic permits

Las Animas-Huerfano Counties District Health Department — OWTS Program

OWTS permits, septic installer licensing and OWTS permit records for Las Animas County

719-846-2213

412 Benedicta Avenue, Trinidad, CO 81082

Contact details are copied from each office’s official page and were checked against it on September 27, 2026.

Do you need a building permit in Las Animas County, Colorado?

Yes. Unincorporated Las Animas County requires a building permit for construction, and an OWTS permit must be completed before the county issues the building permit when the project needs onsite wastewater treatment1. The Building Department determines the building-permit fee from the stated project value, so obtain that amount before using the payment portal2. The county page also directs plumbing and electrical permits and inspections to the State of Colorado10. Colorado law lets a county except a structure used solely to shelter agricultural implements, farm products, livestock or poultry, but the available county material does not establish that every farm building is exempt11. Ask the Building Department at 719-845-2577 whether the exact scope needs a permit and which plans or inspections apply10.

Who is the Las Animas County building department, and how do you reach it?

The Las Animas County Building Department is at 200 East 1st Street, Room 104, Trinidad, Colorado 81082, and its permit and inspections number is 719-845-257710. The department's page links the building permit, fee information, building guides, an owner-doing-the-work form and the county payment portal10. A project value is needed so staff can determine the fee to enter in the portal2. We could not confirm the legal conditions for acting as an owner-builder or the county's full inspection sequence, so ask the Building Department before committing to that route. For zoning, parcel divisions or rezoning, use the Land Use Office at the same courthouse address and phone number7. Land-use staff recommend an appointment for application review, and incomplete submittals may be refused until every required item arrives together12.

Does Las Animas County have zoning?

Yes. Las Animas County's land-use regulations apply to public and private land and structures in unincorporated Las Animas County, while land inside municipal boundaries is excluded3. Uses and structures must comply with the applicable zoning district, so a rural address alone does not establish that a house, RV, tiny home or accessory use is allowed3. The Land Use Office processes land divisions, subdivisions, rezoning and other land-use cases137. Contact that office at 719-845-2577 to identify the parcel's district and confirm its allowed uses, setbacks and dimensional rules before selecting a building site7. Colorado counties may regulate building location, height, bulk, lot coverage, lot size, open space and land uses through zoning, but that state authority does not supply a single countywide numeric standard for every parcel14.

How do septic permits work in Las Animas County?

The Las Animas-Huerfano Counties District Health Department administers septic, or OWTS, permits in Las Animas County4. An applicant must submit the OWTS permit application and appropriate fee before installing any onsite wastewater treatment system, and contractors or installers must be licensed by the department515. The Las Animas County office is at 412 Benedicta Avenue in Trinidad and can be reached at 719-846-221315. Colorado requires the local OWTS permit before building approval when a structure is not served by a sewage treatment works, followed by final inspection and local approval before occupancy1617. Only 10% of county soils are rated without severe limits for a conventional septic drain field, so make soil and system feasibility an early purchase contingency18.

Can you live in an RV or tiny home on your land in Las Animas County?

We could not confirm a complete Las Animas County rule for long-term RV occupancy or temporary camping on private land. The available Colorado camping rule concerns land controlled by Colorado Parks and Wildlife, so it does not answer whether an RV may be occupied on a private parcel19. Ask the Las Animas County Land Use Office at 719-845-2577 about the parcel's zoning district, temporary-use rules and sanitation requirements before moving an RV onto the property7. Colorado-regulated tiny homes can be approved for long-term living on permanent or temporary foundations, but plans require state approval before construction and the unit still must satisfy local zoning6. In unincorporated Las Animas County, that means county zoning remains part of the answer3. Any occupied structure also needs adequate sanitary sewage disposal, and a permitted OWTS is one allowed route where sewer service is unavailable20.

Building a home in Las Animas County: the steps, in order

  1. Ask the Land Use Office to identify the zoning district, allowed residential use and parcel-specific siting rules37.
  2. Verify water: every new groundwater-diverting well in Colorado generally needs a Division of Water Resources permit, subject to statutory and basin-specific rules8.
  3. Establish septic feasibility and obtain the district OWTS permit before county building approval when sewage-treatment service is unavailable516.
  4. Prepare the building application and project value, then ask the Building Department to calculate the fee before paying through the portal210.
  5. Confirm the required building inspections with the county and route plumbing and electrical permits and inspections through the State of Colorado10.
  6. Complete the OWTS final inspection and secure local approval before occupancy when the home is not served by a sewage treatment works17.

What should you check before buying land in Las Animas County, Colorado?

Start with zoning and septic. County zoning applies throughout unincorporated Las Animas County, and only 10% of county soils are rated without severe limits for a conventional drain field318. Check the flood map before siting improvements because a Floodplain Development Permit is required before development begins in a Special Flood Hazard Area9. Verify a legal water source because a new groundwater-diverting well generally needs a state permit and may face basin-specific conditions8. If a home will connect directly to a state highway, obtain a Colorado Department of Transportation access permit21. Confirm recorded access and ownership around the parcel because federal land accounts for 11.1% of the county22. Finally, budget for a median annual property-tax bill of about $524 and an effective property-tax rate of about 0.2%2324.

Watch-outs

  • An OWTS permit must be completed before Las Animas County issues a building permit for a project that needs onsite wastewater treatment1.
  • Only 10% of Las Animas County soils are rated without severe limits for a conventional septic drain field, so do not assume a conventional system will fit the parcel18.
  • Private-land RV occupancy remains unconfirmed; ask the Las Animas County Land Use Office about the exact parcel and proposed use7.

Sources

  1. Las Animas County Building Department (2026 county census)
  2. Building Department, quoted and re-checked
  3. Las Animas County Land Use Regulations, quoted and re-checked
  4. On-Site Wastewater Treatment Systems (OWTS) Program, quoted and re-checked
  5. On-Site Wastewater Treatment Systems (OWTS) Program, quoted and re-checked
  6. Consumers of Manufactured Homes and Tiny Homes - HUD (Colorado statewide rule), quoted and re-checked
  7. Las Animas County Land Use Office (lasanimascounty.colorado.gov)
  8. Water Administration (Colorado statewide rule), quoted and re-checked
  9. Las Animas County Land Use Regulations, quoted and re-checked
  10. Las Animas County Building Department (lasanimascounty.colorado.gov)
  11. Colorado Revised Statutes 2025 Title 30 Government - County (Colorado statewide rule), quoted and re-checked
  12. Land Use - Special Events Permit Application, quoted and re-checked
  13. Land Use - Special Events Permit Application, quoted and re-checked
  14. Colorado Revised Statutes 2025 Title 30 Government - County (Colorado statewide rule), quoted and re-checked
  15. Las Animas-Huerfano Counties District Health Department — OWTS Program (la-h-health.colorado.gov)
  16. Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
  17. Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
  18. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  19. Title 33 - Parks and Wildlife - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
  20. Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
  21. Access Permits | Frequently Asked Questions (Colorado statewide rule), quoted and re-checked
  22. Federal land share: Bolthole Index county data
  23. Median property tax bill: Bolthole Index county data
  24. Effective property tax rate: Bolthole Index county data

Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Las Animas County in Colorado

55
County map
Las Animas County highlighted among the Colorado counties · colored by Index score

How Las Animas County scores

Seclusion89100% ev.
Self-Sufficiency26100% ev.
Admin Boringness4190% ev.
Durability47100% ev.
Property Autonomy75100% ev.
Carry Cost86100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$248kTypical home
0.2%Property tax
$1,005Land / acre
15.8"Annual rain
37.4% of yrsSevere drought
8.3 / yr (+7.3)Mid-century 100°F days
25 daysMid-century dry spell
1.02" (+4.9%)Mid-century 1-day rain
1.29×Wildfire change factor
100%Forward climate coverage
$2,411Home insurance / yr
3.7% / yrInsurance growth
1.21%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
218Radius comparison (15 mi)
3People / sq mi
11.1%Federal land
74.4%Land at 15% slope or less
10%Septic soil without severe limits
305,330 acWorkable land screen
21.6%Wooded land
13.7 tonsBiomass / forest ac
51.6°FAvg temp

Scout Las Animas County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Las Animas County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Las Animas County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Las Animas County rules

  • County-wide zoningPresent

    Unincorporated territory of Las Animas County.

    • The regulations exclude land within municipal boundaries.
    • Uses and structures must conform to the applicable zoning district regulations.
    “The provisions of these Regulations shall apply to all private and public land and structures located within Las Animas County except land within the boundaries of municipal corporations and except as otherwise prohibited by state or federal law.”
  • Who permits septicLocal

    OWTS/septic systems in Las Animas County.

    • The district is a bi-county health department serving Las Animas and Huerfano Counties.
    “Las Animas-Huerfano County District Health Department permits the installation, repair, and use of these systems in the County.”
  • Septic permitRequired

    Installation of any onsite wastewater treatment system in Las Animas County.

    • The permit application must be submitted to the district with the appropriate fee before installation.
    • The district also licenses septic contractors/installers.
    “A OWTS/septic permit application must be completed and submitted to this department with the appropriate fee prior to installing any onsite wastewater treatment system (OWTS).”
  • Subdividing landRegulated (with conditions)

    Land divisions and subdivisions in unincorporated Las Animas County.

    • The Land Use Office processes subdivision and land-division applications.
    • The regulations include exemptions and separate subdivision procedures.
    “The Land Use Office is responsible for the administration and processing of applications for division of lands, subdivisions, rezoning and other land use cases.”
  • Building in a floodplainRequired

    Development within a designated Special Flood Hazard Area or designated floodplain in Las Animas County.

    • No structure or land may be located, altered, or have its use changed within the Special Flood Hazard Area without compliance with the flood damage prevention chapter.
    • A Floodplain Development Permit application must be presented to the Floodplain Administrator.
    • Subdivision portions in a designated 100-year floodplain or special flood hazard area may be developed only with a Floodplain Development Permit.

    floodplain threshold: 100-year floodplain or Special Flood Hazard Area

    “Floodplain development permit: A permit required before construction or development begins within any Special Flood Hazard Area (SFHA).”
  • Permit feesVariable (with conditions)

    County building permits and land-use permits.

    • For building permits, the project value must be provided so the fee can be determined.
    • The Land Use Office directs applicants to contact Planning to determine the fee for special events.
    “for Building Permit fee, prior to entering into the Portal, please have the value of the project included in your building permit application or email it to [email protected] or call 719-845-2577 so a fee can be determined that you will enter into the "Price" field within the portal”
  • Permit processPartial

    County land-use permit applications and reviews.

    • Submittals are accepted 8:00 A.M. to 4:30 P.M.
    • An appointment is recommended so staff are available to review and accept applications.
    • Incomplete submittals may be refused until all required items are received together.

    submittal hours: 8:00 A.M. to 4:30 P.M.

    “8:00 A.M. - 4:30 P.M. Appointment recommended in order for staff to be available to review and accept permit applications for review. NOTE: incomplete submittals may be refused until all required items can be received together.”

Colorado rules that apply here

  • Building permitRequired

    Construction, including adding previously unlicensed space to a Health Facility license, or operational permits for a Colorado-licensed Health Facility located in a jurisdiction with no local Building Department.

    • The Division is responsible for issuing the building permit when no local Building Department exists.
    • Limited Scope Project permits may be used instead of an individual Building, Fire, or Life Safety Code permit for projects identified by the Division.
    • Permit issuance is contingent upon review and approval by the Fire Code Official.
    • The determination of when a building permit is required is based on International Building Code Section 105 requirements, except Sections 105.1.1 and 105.1.2.
    • Substantial changes to the project scope, including adding square footage, require a new permit application.
    • Once all corrections identified through code review are satisfactorily addressed, the Division will issue the permit.

    building permit determination: International Building Code Section 105, except Sections 105.1.1 and 105.1.2 (Substantial changes to project scope require a new permit application.)

    “Under these circumstances, the Division will issue the applicable Building Permits and associated Certificates of Occupancy”
    One more reviewed finding on this topic
    • Limited — Construction, renovation, emergency, cash-funded, or in-house-funded projects involving Colorado state buildings and administered through the Department of Personnel and Administration/Office of the State Architect.
      “State Buildings Program (SBP) is responsible for establishing minimum building codes for all construction by state agencies [...] Colorado has no statewide building code”
  • Building code adoptedPartial

    Construction at Colorado state agencies and institutions of higher education owned facilities.

    • The approved state building codes are minimum requirements for the specified state-owned facilities.
    • The source states that additional codes, standards, and appendices may be adopted by state agencies and institutions in addition to the listed minimum codes and standards.
    • The statewide source describes Colorado as a local-control state in which most building-code adoption decisions are driven by local governments, not the state.
    • The listed code editions and effective dates are those stated in the retrieved Approved State Building Codes document, which is marked Rev. 9/2023.

    International Building Code edition: 2021 edition (Chapter 1 as amended; Chapters 2-35 and Appendices C and I) · International Residential Code edition: 2021 edition (As applicable) · International Energy Conservation Code edition: 2021 edition (As adopted by the Colorado State Buildings Program and Colorado Energy Office) · National Electrical Code edition: 2023 edition (Effective July 30, 2023) · Colorado Model Electric Ready and Solar Ready Code effective date: 2023-07-01 date · International Plumbing Code edition: 2021 edition (First printing (March 2020); effective May 15, 2023 as adopted by the Colorado Examining Board of Plumbers) · International Fuel Gas Code edition: 2021 edition (First printing; effective May 15, 2023 as adopted by the Colorado Examining Board of Plumbers)

    “These minimum requirements are to be applied to all construction at state agencies and institutions of higher education owned facilities.”
    One more reviewed finding on this topic
    • Partial — Construction at Colorado state agencies and institutions of higher education owned facilities under the Colorado State Buildings Program and other state authorities.
      “Approved building codes and standards are adopted by the Office of the State Architect (herein referred to as State Buildings Program (SBP)) and other state authorities, and are identified below. These minimum requirements are to be applied to all construction at state agencies and institutions of higher education owned facilities.”
  • InspectionsRequired

    All reviewed Colorado State Buildings Program construction projects subject to state building-code compliance review.

    • The policy states that all reviewed construction projects are inspected for building-code compliance.
    • Required inspections are identified on the Building Inspection Record and may include building, special, fire, plumbing, electrical, boiler, elevator, and health-department inspections as applicable.
    • Local fire districts and other state authorities may have separate inspection responsibilities.
    • The policy applies to state buildings and state projects, not uniformly to every private project in Colorado.
    “All reviewed construction projects shall be inspected for building code compliance.”
  • Building heightDistrict specific (with conditions)

    Municipal zoning districts in Colorado where the municipality adopts building-height or story regulations.

    • The applicable height or story limit is determined by the municipality's zoning regulations and district classification.
    • The statute provides authority but no statewide numeric height limit.
    • Height restrictions do not apply to existing buildings under the cited municipal zoning authority, except as stated for new growth of vegetation.

    building height or number of stories: local regulation (No statewide numeric limit specified)

    “the governing body of each municipality is empowered to regulate and restrict the height, number of stories, and size of buildings and other structures”
  • Tiny homesAllowed (with conditions)

    Colorado Division of Housing-regulated tiny homes intended for residential occupancy and long-term living.

    • Plans must be submitted to the Colorado Division of Housing for approval before construction of the units.
    • The unit must satisfy applicable Colorado-adopted codes and standards and local zoning requirements.
    • Tiny home units are certified for the specific site where installed; relocation to another Colorado site requires the applicable design criteria, and design differences require revisions.

    foundation types: permanent or temporary

    “Tiny homes are approved for long term living”
  • Manufactured homesAllowed (with conditions)

    Installation and resulting residential use of HUD-code manufactured homes and mobile homes in Colorado, subject to Colorado Division of Housing requirements and local zoning or building requirements.

    • HUD homes must be certified by the applicable State Administrative Agent for installation in Colorado; imported units are monitored by the State Administrative Agent of the state from which they are imported, rather than necessarily by Colorado's SAA.
    • A HUD home may be installed anywhere in Colorado only where local zoning allows it.
    • Local jurisdictions may require site mitigation to meet local wind and snow loads, but the mitigation cannot directly affect or change the construction of the home itself.
    • The Division of Housing regulates installation and installation inspections for HUD homes; mobile-home foundation and structural construction requirements are regulated by local jurisdictions with active building departments.
    • The state minimum HUD design criteria listed by the source are Wind Zone 1, Thermal Zone 3, and Middle Roof Load Zone (30 psf).

    wind zone: 1 zone · thermal zone: 3 zone · roof load zone: 30 psf (Middle Zone)

    “HUD homes [...] can be installed anywhere in Colorado as long as the local zoning allows for it.”
  • Accessory dwellingsAllowed (with conditions)

    One accessory dwelling unit as an accessory use to a single-unit detached dwelling in a Colorado subject jurisdiction where single-unit detached dwellings are allowed.

    • The rule applies to a subject jurisdiction: either a municipality with a population of at least 1,000 within a metropolitan planning organization, or the portion of a county within a census-designated place of at least 40,000 people that is also within a metropolitan planning organization.
    • The subject jurisdiction must allow the ADU through an administrative approval process.
    • The rule applies on or after June 30, 2025.
    • The state requirement does not establish that every Colorado municipality or county area is a subject jurisdiction.

    maximum required ADUs per single-unit detached dwelling: 1 unit · effective date: >= 2025-06-30 · qualifying municipality population: >= 1000 persons (municipality must also be within a metropolitan planning organization) · qualifying census-designated-place population: >= 40000 persons (county portion must also be within a metropolitan planning organization)

    “Section 1 requires a subject jurisdiction, on or after June 30, 2025, to allow, subject to an administrative approval process, one accessory dwelling unit”
  • Septic inspectionRequired

    OWTS construction, installation, alteration, or repair statewide before the system is placed in use, plus operating inspections when authorized under applicable rules.

    • A final inspection must occur after permitted work is completed and before the system is placed in use.
    • The local public health agency or its designated professional engineer determines compliance with the permit, statute, and applicable rules.
    • For a building not serviced by a sewage treatment works, an occupancy permit requires final OWTS inspection and local agency approval.
    “Final inspection of a system to be made by the local public health agency or its designated professional engineer after construction, installation, alteration, or repair work under a permit has been completed, but before the system is placed in use, to determine that the work has been performed in accordance with the permit and that the system is in compliance with this article and the rules adopted under this article;”
  • Off-grid sanitationLimited

    Sanitation for dwellings and occupied structures statewide that is provided without connection to a sewage treatment works.

    • The structure must have adequate facilities for sanitary disposal of sewage.
    • An OWTS may be used subject to applicable permit, inspection, construction, installation, alteration, and use requirements.
    • Construction of new cesspools is prohibited.
    • Septage removed during maintenance or cleaning must be disposed of at an approved site and in an approved manner.
    “No person shall construct or maintain any dwelling or other occupied structure that is not equipped with adequate facilities for the sanitary disposal of sewage.”
  • Well permitRequired

    Every new groundwater-diverting well in Colorado, including residential wells, subject to statutory exemptions and basin-specific rules.

    • The Division of Water Resources administers groundwater permitting and issues permits.
    • Applicants must complete the appropriate application and pay the associated fee.
    • Statutory exemptions and additional Denver Basin or Designated Basin rules may affect the requirement or permit conditions.
    • In many areas, a well may also require an augmentation plan if its priority is not sufficient to divert in priority.

    complete-application review time: <= 49 days (DWR states review of complete new and replacement applications may take up to 49 days)

    “Every new well in the state that diverts groundwater must have a well permit.”
  • Mandatory utility hookupConditional

    Residential or other occupied structures statewide that are not serviced by a sewage treatment works.

    • Colorado law conditions building and occupancy permitting on either service by a sewage treatment works or an approved OWTS process.
    • If the structure is not serviced by a sewage treatment works, the local public health agency must issue the OWTS permit before building construction or remodeling approval, and must complete a final inspection and approve the installation before occupancy approval.
    • This claim does not establish a universal statewide mandate to connect to a particular municipal water or sewer provider.
    “A permit to construct or remodel a building or structure that is not serviced by a sewage treatment works until the local public health agency has issued a permit for an on-site wastewater treatment system;”
  • Driveway accessRequired

    Direct residential access from a property to a Colorado state highway, and construction, relocation, closure, modification, or change in use of access points to state highways.

    • Direct access from a house to a state highway requires an access permit.
    • Some state-highway access categories require access from a lesser street or by easement from a parent parcel whenever possible.
    • Level 1 permits cover single-family residential/agricultural permits; Level 2 covers commercial property and developments exceeding 20 vehicular trips per day without roadway improvements; Level 3 covers commercial property requiring roadway improvements.
    • Level 1 fees are $50, Level 2 fees are $100, and Level 3 fees are $300.
    • No fees are charged to local government applications or political subdivisions.
    • There is no upfront charge to review an Access Permit Application.
    • The permittee is responsible for roadway-improvement costs required with issuance of an access permit.
    • Performance-bond requirements apply only to private projects; local agencies are not required to comply, although CDOT regions may require a bond at their discretion.

    Level 1 access permit fee: 50 USD (Single-family residential/agricultural permits) · Level 2 access permit fee: 100 USD (Commercial property permits and developments exceeding 20 vehicular trips per day without roadway improvements) · Level 3 access permit fee: 300 USD (Commercial property permits requiring roadway improvements)

    “If you want the house to have direct access off of the state highway, then you will need an access permit.”
  • Short-term rentalsLimited

    Short-term rentals statewide, defined in the cited official source as lodging-unit rentals for fewer than 30 days.

    • There is no statewide STR regulatory scheme.
    • Boards of county commissioners may license and regulate STR owners or agencies and set license fees, terms, issuance, and revocation procedures.
    • Home-rule municipalities and private contracts or homeowners' association covenants may impose additional restrictions.

    maximum rental duration for STR definition: < 30 days

    “There are no statewide regulations regarding STRs. As established through House Bill 20-1093, state law allows for boards of county commissioners (BOCCs) to license and regulate an owner or owner’s agency and to fix the fees, terms, and manner for issuing and revoking licenses.”
  • Campground & park staysAllowed (with conditions)

    Temporary overnight camping, including parking a motor home or traveler, on land and water under the control of Colorado Parks and Wildlife, including state parks and state recreation areas.

    • The source addresses lands and waters under the control of the Division of Parks and Wildlife, not all public or private land statewide.
    • Camping includes parking a motor vehicle, motor home, or traveler for the apparent purpose of overnight occupancy.
    • A commission-issued permit may be required; the statute defines permits to include campground permits and electrical hookup permits.
    • The state may charge fees for required passes or permits for use of any state park or state recreation area where supervision, maintenance, or specified facilities warrant a fee.

    overnight occupancy: true (Camping definition includes the parking of a motor vehicle, motor home, or traveler for the apparent purpose of overnight occupancy.) · permit types: campground permits; electrical hookup permits

    “Develop state parks and state recreation areas suitable for such recreational activities as camping, [...] "Camping" means [...] the parking of a motor vehicle, motor home, or traveler”
  • county zoning authorityGeneral

    Colorado counties adopting zoning plans for all or any part of unincorporated territory.

    • The county planning commission may make the zoning plan; in a county having a county planning commission, it must do so upon order by the board of county commissioners.
    • The zoning plan may regulate districts or zones, including building location, height, bulk, size, lot coverage, lot size, open spaces, population density, building and land uses, and access to sunlight for solar energy devices.
    • The plan may include regulations for uses on or along storm or floodwater runoff channels or basins only when the channel or basin has been designated and approved by the Colorado water conservation board, to lessen or avoid hazards from storm or floodwaters.
    • The statute applies to unincorporated territory and does not describe incorporated cities or towns as within this county zoning grant.
    “zoning all or any part of the unincorporated territory within such county”
  • county building authorityGeneral

    Colorado counties adopting and enforcing building codes and requiring building permits in designated unincorporated areas.

    • A board of county commissioners may adopt a building code in all or part of the county, but the area must not be within the limits of an incorporated city or town.
    • Buildings or structures used solely to shelter agricultural implements, farm products, livestock, or poultry may be excepted from the building code and permit requirement.
    • Before adoption, the county planning commission may designate part or all of the county for the building code upon request from the board of county commissioners; the board must hold a public hearing and publish notice once weekly for four consecutive weeks.
    • After adoption of the building code, construction, reconstruction, alteration, or remodeling in the designated area requires a building permit, except for the agricultural-shelter exception.
    • The board must fix a reasonable schedule of building-permit fees; no permit fee may be charged unless a qualified inspector actually performs an inspection.
    • Plans must conform to the building code, and plans and specifications generally must bear the seal of a Colorado-licensed architect or engineer unless exempted by section 12-120-403.
    • Every county adopting or updating a building code must adopt and enforce an energy code meeting or exceeding one of the three most recent International Energy Conservation Code versions under section 30-28-211.
    • The 2025 amendment to section 30-28-204 is effective January 1, 2026 and adds accessibility requirements for substantially amended or updated county building codes, with an exception for compliant one- and two-family dwellings and townhomes.
    “A board of county commissioners is authorized to adopt ordinances and a building code”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-built construction in unincorporated Las Animas County.
  • Certificate of occupancy — Certificates of occupancy in unincorporated Las Animas County.
  • Living in an RV — Long-term or residential RV occupancy on private land in unincorporated Las Animas County.
  • Camping on your land — Temporary camping outside an approved campground in unincorporated Las Animas County.
  • Agricultural exemption — Agricultural construction and land uses in unincorporated Las Animas County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Las Animas County, Colorado

Is Las Animas County a good place to live off-grid or homestead?

Las Animas County scores 55/100 on the Bolthole Index, a solid county profile. Its strengths: deep seclusion — about 218 people within 15 miles and manageable long-term carry cost. Watch-outs: thin water margin (15.8″/yr rainfall) and more administrative friction around building and land use.

Do you need a building permit in Las Animas County, Colorado?

Las Animas County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Las Animas-Huerfano Counties District Health Department, Environmental Health (OWTS Program). These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Las Animas County, Colorado?

Land in Las Animas County runs about $1,005 per acre, based on the latest county data.

What is the water situation in Las Animas County?

Las Animas County gets about 15.8" of rain a year, with severe drought in roughly 37.4% of years.

How remote is Las Animas County?

A typical private-land location has about 218 people within 15 miles and 365,652 within 100 miles. These radius catchments are the published fallback where road routing is unavailable.

Off-grid gear

Going off-grid in Las Animas County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Las Animas compares in Colorado

Compare side-by-side →See all 64 Colorado counties ranked →