In Farmersville (Tulare County, California), a building permit starts with an application and site plan at Farmersville City Hall, then the plans go to the Tulare County RMA for review and approval1. The city sets its own zoning2, and Tulare County's Environmental Health Division handles septic and well permits34.
At a glance
- Building permit
- City application and site plan first, then Tulare County RMA plan review1
- Plan check and inspection
- The city contracts with the Tulare County Building Department5
- Zoning
- City zoning by district (U-R, O-S, R-1, R-M)26
- Minimum lot (R-1)
- 6,000 square feet7
- Septic
- Tulare County Environmental Health Division and RMA3
- Well permit
- Required anywhere in Tulare County4
- Flood zones
- City development permit before any construction8
Who to call
Building permits
City of Farmersville Planning & Development (building permits)
First-step building permit application and site plan review inside Farmersville city limits
909 W. Visalia Road, Farmersville, CA 93223
Building permits
Tulare County Building Department
Building plan check and inspection under contract for the City of Farmersville
Zoning
City of Farmersville Planning & Zoning
Zoning and subdivision applications inside Farmersville city limits
909 W Visalia Rd, Farmersville, CA 93223
Septic permits
Tulare County Environmental Health Division
Septic (onsite wastewater) permits and water-well permits for Tulare County
5957 S. Mooney Blvd, Visalia, CA 93277
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Farmersville means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Farmersville have zoning, and what does it mean for lot size?
The City of Farmersville has its own zoning code for land inside city limits, with residential uses assigned by district in a land-use table2. The table's residential columns are U-R, O-S, R-1 and R-M6.
In the R-1 single-family zone, corner and interior lots each need at least 6,000 square feet7. In the R-M multiple-family zone, buildings and parking may cover up to 70 percent of the lot9. The Planning & Zoning division reviews zoning and subdivision applications10. We could not confirm city rules on RVs or tiny homes on a private lot; ask Planning & Zoning.
Do you need a building permit in Farmersville, and who issues it?
Farmersville uses a two-step process. First, an application and site plan go to the City of Farmersville for review1. After city approval, the site plan and construction plans go to the Tulare County RMA for review and approval1. The city contracts with the Tulare County Building Department for building plan check and inspection5.
The city issues permits through its MyGov web platform, where applicants sign up for an account and apply11. Sewer connections need a city encroachment permit12. Fees follow the city's comprehensive fee schedule13. We could not confirm which building-code edition the city enforces or whether owner-builders have a special exemption.
How do septic permits work in Farmersville?
Septic permits in Tulare County come from the county, not the city. The County RMA and the Environmental Health Division are the regulatory agencies for onsite wastewater treatment systems, and the Environmental Health Division regulates these elements within the county's cities3. Most onsite system construction, installation and repair work requires a permit14.
We could not confirm a Farmersville-specific septic rule, and a lot connected to the city sewer needs a city encroachment permit rather than a septic permit12. Call Tulare County Environmental Health at 559-624-7400 to check before you buy15. Only about 6.4% of soils in Tulare County lack severe limits for a conventional drain field16.
Building a home in Farmersville: the steps, in order
- Confirm the lot's zoning with Planning & Zoning106.
- If the lot is in a flood hazard area, get the city development permit before any construction8.
- Submit the application and site plan to the City of Farmersville1.
- After city approval, submit construction plans to the Tulare County RMA1.
- Get a city encroachment permit for the sewer connection12.
- Schedule inspections through the Tulare County Building Department5.
What stays with Tulare County, and what to check before you buy
Tulare County handles building plan check and inspection under contract5, septic permits14, and well permits: a permit is required for well construction, destruction and inactivation anywhere in Tulare County4. Well work must be done by a contractor with a valid C-57 license4.
Tulare County's effective property tax rate is 0.7%17. The nearest city of 100,000 or more is about 31 miles from the county center18.
Watch-outs
Sources
- City of Farmersville Planning & Development (building permits) (cityoffarmersville-ca.gov)
- Farmersville Municipal Code § 17.40.020, Table 1—Permitted uses (Farmersville), quoted and re-checked
- Septic Systems, quoted and re-checked
- Water Wells, quoted and re-checked
- Tulare County Building Department (cityoffarmersville-ca.gov)
- Farmersville Municipal Code § 17.40.020, Table 1—Permitted uses (Farmersville), quoted and re-checked
- Farmersville Municipal Code § 17.24.040, Area, lot width and yard requirements (Farmersville), quoted and re-checked
- Farmersville Municipal Code § 18.04.150, Development permit (Farmersville), quoted and re-checked
- Farmersville Municipal Code § 17.32.040, Area, density, lot width and yard requirements (Farmersville), quoted and re-checked
- City of Farmersville Planning & Zoning (cityoffarmersville-ca.gov)
- Next Steps | Farmersville, CA (Farmersville), quoted and re-checked
- Farmersville Municipal Code Chapter 13.08, Sewers (Farmersville), quoted and re-checked
- Farmersville Municipal Code Chapter 13.08, Sewers (Farmersville), quoted and re-checked
- Liquid Waste (Septic System) FAQ's, quoted and re-checked
- Tulare County Environmental Health Division (tularecountyeh.org)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.