Mountain View, California requires a building permit for a new single-family home or duplex, and the City sets zoning under Chapter 36 of its code12. Owners of single-family and duplex properties may elect to sign as owner-builders3. Septic permits in Santa Clara County, which includes Mountain View, are issued by the county Department of Environmental Health, not the City4.
At a glance
- Building permit
- Required for a new single-family home or duplex; apply online through ePermitsMV15
- Zoning
- City zoning under Chapter 36, with district-specific standards2
- Septic
- County Department of Environmental Health issues septic permits4
- Owner-builder
- Allowed for single-family and duplex properties3
- Minimum lot (R1)
- 6,000 square feet for new subdivisions6
- Minimum lot (R2)
- 7,000 square feet for new subdivisions7
- Overnight camping
- Not allowed on a vacant lot without the owner's permission8
Who to call
Building permits
City of Mountain View Building Division
Building permits for new single-family homes and duplexes inside Mountain View city limits
500 Castro Street, Mountain View, CA 94041
Planning & zoning
City of Mountain View Planning Division
Zoning standards and planning review for lots inside Mountain View city limits
500 Castro Street, Mountain View, CA 94041
Septic permits
Santa Clara County Department of Environmental Health
Septic (onsite wastewater treatment system) permits for new systems and repairs, and installation inspections, in Santa Clara County
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Mountain View means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Mountain View, CA?
Yes. Mountain View requires a permit to construct a new single-family home or duplex inside city limits1. A new home also needs separate electrical, mechanical, plumbing, demolition and excavation permits, and a flood permit if the lot is in a flood zone9.
The City adopts the California Building Standards Code by reference with local amendments, and applications submitted from January 1, 2026 must comply with it10. California also states that no building may be erected, altered, moved or demolished without a permit11.
Expect real cost. The City's fee page lists building inspection at $218 per hour where no other fee is specified12, and the City's new-home page puts building permit fees for a single-family home at $15,000 to $25,0009.
Who issues building permits in Mountain View, and how do you reach them?
The City of Mountain View, not Santa Clara County, issues building permits inside city limits. Building and fire protection permits must be submitted electronically on the City's ePermitsMV portal5.
The Building Division can be reached at (650) 903-6313 or [email protected], and the Planning Division at (650) 903-6306913. Both are at City Hall, 500 Castro Street, first floor9.
Santa Clara County's own Department of Planning and Development issues building permits only for unincorporated land, so its rules do not apply to a lot inside Mountain View14.
Does Mountain View have zoning, and what does it mean for lot size and setbacks?
Yes. The City administers its own zoning under Chapter 36 of the city code, with district-specific standards2. Zoning districts, not one citywide rule, decide what you can build, so look up the exact district for a parcel first.
In the R1 single-family district, new subdivisions need lots of at least 6,000 square feet6. In the R2 one- and two-family district, the minimum is 7,000 square feet7.
R2 buildings are limited to 24 feet for one story and 30 feet for two stories15. R2 front setbacks start at a 20-foot minimum for the first-floor wall16. Detached accessory structures in R1 and R2 may not cumulatively cover more than 30 percent of the required rear yard17.
Subdividing into three or more lots where one lacks street frontage requires a planned unit development permit18.
How do septic permits work in Mountain View?
Santa Clara County's Department of Environmental Health, not the City of Mountain View, handles septic permits and issues them for new onsite wastewater systems and repairs419. The county requires a permit to construct, reconstruct or repair an individual onsite sewage disposal system, and such systems are used where public sewer is unavailable within 300 feet of the property line20.
Soils are a challenge: only 1 percent of Santa Clara County soils rate as not very limited for a conventional drain field, so expect a site evaluation and often an engineered system21. Cesspools are not authorized in the county22.
We could not confirm whether a specific Mountain View address must connect to public sewer; ask the Building Division and the county Department of Environmental Health before you buy919.
Can you live in an RV or tiny home on your lot in Mountain View?
Camping or lodging overnight in a vacant lot or building in Mountain View without the owner's or occupant's permission is prohibited8. That rule is about permission, so it does not itself answer whether you may live in an RV on your own lot. California says RVs are not intended for occupancy as a permanent dwelling unless a local ordinance allows it23.
On lots in the RMH mobile-home district, no travel trailer, camper or other recreational vehicle may be placed for occupancy or storage24. In flood hazard areas, an RV must stay less than 180 consecutive days or be fully licensed and ready for highway use25.
We could not confirm a Mountain View rule on tiny-home occupancy. Ask the Planning Division at (650) 903-630613. Accessory dwelling units are allowed in some cases, including on qualifying flag lots26, and California requires ministerial approval of ADU applications27.
Building a home in Mountain View: the steps, in order
- Confirm the zoning district and its standards with the Planning Division213.
- If the lot is new or oddly shaped, check subdivision rules18.
- Decide who will pull the permit. Permits must be signed by a California licensed contractor, except that an owner of a single-family or duplex property can elect to sign as an owner-builder3.
- Submit the permit application online through ePermitsMV5.
- Get the septic or sewer question settled with Santa Clara County Environmental Health19.
- Build to the 2025 California Building Standards Code as amended by the City, and schedule inspections10.
What stays with Santa Clara County, and what to check before you buy
Septic permits and county wells stay with county offices, and the county's unincorporated-area rules do not apply inside city limits. For instance, the county's ban on using RVs as housing on residential lots covers unincorporated Santa Clara County only28.
Wells in the Santa Clara Valley Water District service area require a permit29. We could not confirm a well-permit rule specific to land inside Mountain View.
Before buying, check flood zone status, since flood permits and RV limits depend on it25. Prices are high: the typical Santa Clara County home value is $1,624,35630.
Watch-outs
- The City confirms the 2025 California Building Standards Code applies to applications submitted from January 1, 2026, so older plans may need updating10.
- We could not confirm Mountain View rules on tiny-home occupancy, wells, off-grid sanitation, or agricultural building exemptions; ask the Planning Division at (650) 903-630613.
Sources
- New Construction (Mountain View), quoted and re-checked
- R2 zone development standards (Mountain View), quoted and re-checked
- Who Can Sign For a Permit? (Mountain View), quoted and re-checked
- Onsite Wastewater Treatment System (OWTS), quoted and re-checked
- Permit Center (Mountain View), quoted and re-checked
- Minimum lot area and width in R1 subdivisions (Mountain View), quoted and re-checked
- Minimum lot area and width in R2 subdivisions (Mountain View), quoted and re-checked
- Camping, etc., on property without owner's permission (Mountain View), quoted and re-checked
- City of Mountain View Building Division (developmentpermits.mountainview.gov)
- Building and Fire Codes (Mountain View), quoted and re-checked
- Do I need a building permit for my project? (California statewide rule), quoted and re-checked
- Building Permit Fees (Mountain View), quoted and re-checked
- City of Mountain View Planning Division (developmentpermits.mountainview.gov)
- Apply for a Building Permit, quoted and re-checked
- library.municode.com (Mountain View), quoted and re-checked
- R2 zone development standards (Mountain View), quoted and re-checked
- Development standards for detached structures in R1 and R2 zoning districts (Mountain View), quoted and re-checked
- Subdivisions in the R1 zone creating parcels without required frontage (Mountain View), quoted and re-checked
- Santa Clara County Department of Environmental Health (deh.santaclaracounty.gov)
- Other approvals that may be needed for construction, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Santa Clara County OWTS Ordinance No. NS-517.85, quoted and re-checked
- hcd.ca.gov (California statewide rule), quoted and re-checked
- Mobile home parks/subdivisions (Mountain View), quoted and re-checked
- Flood-resistant development; temporary placement of recreational vehicles (Mountain View), quoted and re-checked
- Subdivisions in the R1 zone creating parcels without required frontage (Mountain View), quoted and re-checked
- Accessory Dwelling Unit Handbook March 2026 (California statewide rule), quoted and re-checked
- plandev.santaclaracounty.gov, quoted and re-checked
- Well Permits and Inspections, quoted and re-checked
- Typical home value (Zillow): Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.