King City, California adopts its own zoning (Title 17)1 and its Building & Safety Department handles building plan review, permits and inspections inside city limits2. Building permits follow the 2025 California Building Standards Code3. We could not confirm who issues septic permits inside the city; Monterey County's Environmental Health Bureau covers unincorporated land, so ask both offices before you buy.
At a glance
- Building permit
- Required inside city limits; issued by the King City Building & Safety Department2
- Building code
- 2025 California Building Standards Code, with local amendments3
- Zoning
- City-run zoning under Title 17, by district1
- R-1 minimum lot
- 6,000 sq ft, 60 ft wide, 90 ft deep4
- R-1 setbacks
- Front 20 ft (never under 17 ft), side 6 ft, rear 10 ft5
- Sewer connection
- Required if a public sewer is within 200 ft of the building6
- Septic permit
- Not confirmed inside city limits; ask the city and Monterey County Environmental Health7
- Accessory dwelling
- Allowed in R-1 under Chapter 17.478
Who to call
Building permits
King City Building & Safety Department
Building plan review, permit issuance and inspections for projects inside King City
212 S Vanderhurst Avenue, King City, CA 93930
Planning & zoning
King City Community Development Department
Planning, zoning and land-use development permits inside King City
212 S Vanderhurst Avenue, King City, CA 93930
Planning & zoning
King City Land Use Development Permits (online portal)
Land use permit applications and online payment
Septic permits
Monterey County Health Department, Environmental Health Bureau (Land Use)
Septic system (OWTS) review and permits for unincorporated Monterey County; also the county contact for wells and water supply review
1270 Natividad Road, Salinas, CA 93906
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in King City means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does King City have zoning, and what does it mean for lot size and setbacks?
King City, California administers its own Title 17 zoning ordinance inside city limits, with separate chapters for each district, including the A agricultural district and the R-1 single family district1. Monterey County's zoning does not apply inside the city9.
In the R-1 district, a residential building site must be at least 6,000 square feet, 60 feet wide and 90 feet deep4. The front yard is 20 feet deep and never under 17 feet, except on cul-de-sacs5. Interior side yards are at least 6 feet and rear yards at least 10 feet5. Structures can cover at most 40 percent of the lot10. The main building can be two stories and 30 feet tall, and accessory buildings top out at 14 feet11.
Those figures describe the R-1 district only4. The A district and the other districts have their own tables, and the zoning map is a separate document, so confirm a parcel's district with the Community Development Department12.
Do you need a building permit in King City, and who issues it?
Yes. Inside King City, the Building & Safety Department is responsible for building plan review, permit issuance and periodic site inspections for new construction, remodels and additions, including residential projects2. Permits are processed under the 2025 California Building Standards Code, adopted with local amendments by Chapter 12.043. Applications filed before January 1, 2026 fall under the prior code3.
Appointments are required for permit issuance2. Applicants can apply and pay online for almost all permits through the city's Citizenserve system13.
The county's rules are separate. Monterey County Housing & Community Development issues building permits only for unincorporated land, so a King City address does not go to the county permit counter. We could not confirm the city's fee schedule or a certificate of occupancy rule; ask the Building & Safety Department.
How do septic permits work inside King City?
We could not confirm who issues septic permits inside King City. King City's code requires an occupied building to connect to the public sewer, at the owner's expense, when a city sewer sits within 200 feet of the nearest point of the building, and connection is due within 90 days after official notice6. A lot that reaches the city sewer is therefore probably a sewer-hookup question, not a septic one.
Monterey County's septic rules, including the Environmental Health Bureau's OWTS permit, are written for unincorporated Monterey County and reach a city only by written agreement between the county and that city14. Call the Environmental Health Bureau7 and the King City Building & Safety Department2 before relying on a septic system on a city parcel.
County-wide, only 2.6 percent of soils are rated not limited for a conventional drain field, so any septic plan usually needs a site evaluation and often an engineered system15.
Can you live in an RV, tiny home or accessory dwelling in King City?
Accessory dwelling units and junior accessory dwelling units are allowed in the R-1 district if they meet the standards of Chapter 17.478. We did not confirm the rule for the A district.
We could not confirm King City's rules on living in an RV, on tiny homes or on manufactured homes inside city limits. Monterey County's ban on living in an RV on private property applies to unincorporated land, so do not read it as the city's rule16. California treats RVs as not intended for permanent occupancy and generally limits them to mobilehome parks or special occupancy parks unless a local ordinance allows otherwise17. Ask the Community Development Department before parking anything you plan to sleep in12.
Building a home in King City: the steps, in order
- Confirm the parcel's zoning district and its lot size, setback and height limits with the Community Development Department12.
- Ask whether a public sewer lies within 200 feet of the building site, since connection is required in that case6.
- Make an appointment with the Building & Safety Department and submit plans for review under the 2025 California Building Standards Code23.
- Apply for land use and building permits through the city's Citizenserve portal13.
- Schedule inspections with the Building & Safety Department as work proceeds2.
If you are splitting a lot, King City regulates subdivisions under its Title 1618.
What stays with Monterey County, and what to check before you buy in King City
Land outside King City limits is a different case: Monterey County's building, zoning and septic rules apply only to unincorporated land, and the Monterey County page covers it. Check the parcel's jurisdiction first.
Property taxes are set county-wide: Monterey County's effective property tax rate is 0.7 percent19, and the median bill is $4,782 a year20. Owner-builders should know that California's Contractors' License Law exemption for owners building on their own property does not waive building permits, inspections, zoning or septic approvals21.
We could not confirm King City's flood plain rules, short-term rental rules, driveway access rules or water well rules. Ask the Community Development Department12 about each one.
Watch-outs
- King City's septic permit authority inside city limits is unconfirmed; ask the Environmental Health Bureau and the King City Building & Safety Department before you plan an onsite system72.
- Permit applications filed before January 1, 2026 are governed by the prior code, so date your application carefully3.
- Setback and lot numbers here are R-1 only; other districts, including the A agricultural district, have separate standards1.
Sources
- Chapter 17.06 Districts—Established, King City Title 17 Zoning (King City), quoted and re-checked
- King City Building & Safety Department (kingcity.com)
- Chapter 12.04 Construction Codes Adopted, King City Title 12 Buildings and Construction (King City), quoted and re-checked
- Chapter 17.12 R-1—Single Family Residential District, King City Title 17 Zoning (King City), quoted and re-checked
- Chapter 17.12 R-1—Single Family Residential District, King City Title 17 Zoning (King City), quoted and re-checked
- Chapter 15.13 Sewers—Use, King City Title 15 Waters and Sewers (King City), quoted and re-checked
- Monterey County Health Department, Environmental Health Bureau (Land Use) (countyofmonterey.gov)
- Chapter 17.12 R-1—Single Family Residential District, King City Title 17 Zoning (King City), quoted and re-checked
- countyofmonterey.gov, quoted and re-checked
- Chapter 17.12 R-1—Single Family Residential District, King City Title 17 Zoning (King City), quoted and re-checked
- Chapter 17.12 R-1—Single Family Residential District, King City Title 17 Zoning (King City), quoted and re-checked
- King City Community Development Department (kingcity.com)
- King City Land Use Development Permits (online portal) (kingcity.com)
- Adopted Monterey County Code Chapter 15.20, Sewage Disposal, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Problem Vehicle Report, quoted and re-checked
- hcd.ca.gov (California statewide rule), quoted and re-checked
- King City, CA Code of Ordinances (eCode360) table of contents (King City), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- California Business and Professions Code Section 7044, quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.