Gustine, California, a city in Merced County, adopts and enforces its own zoning and subdivision code, so lot and land-use questions inside city limits go to City Hall, not the county planning counter1. Sleeping in an RV on a residential lot needs a Temporary Use Permit2. Merced County's Division of Environmental Health runs the county's septic permits3; we could not confirm who issues building permits inside Gustine.
At a glance
- Zoning
- Gustine's own zoning and subdivision code applies inside city limits1
- Building permits
- Not confirmed for the city; call Gustine City Hall before you plan work4
- Septic
- Merced County Division of Environmental Health permits septic systems countywide; how that applies inside the city is unconfirmed3
- RV as sleeping quarters
- Needs a Temporary Use Permit from the City, except in mobile home parks or the T district2
- Camping on a lot
- Unlawful, with a guest exception up to 3 consecutive nights per calendar month5
- Accessory dwelling units
- ADUs and junior ADUs are allowed under the city code6
- Owner-builder
- California exempts owner-builders from contractor licensing, not from local permits7
Who to call
Zoning
Main number for the city's Community Development department, which lists a Building Division and a Planning Division on the city site
352 Fifth Street, Gustine, CA 95322
Septic permits
Merced County Division of Environmental Health
Septic and well permits for Merced County
Contact details are copied from each office’s official page and were checked against it on October 16, 2026.
Off-grid gear
Going off-grid in Gustine means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Gustine have zoning, and what does it mean for lots and setbacks?
Yes. Gustine, in Merced County, California, has a Zoning-Subdivision Code of its own, with planning permits decided by the city's Director1. The county's zoning ordinance covers only the unincorporated area, so Merced County's lot-size and setback tables do not govern a parcel inside Gustine8.
The city's code names districts, including a mobile home park combining district called T2. Dimensional rules differ by district, so look up the district for your exact parcel with City Hall before you assume a lot size, setback or dwelling size. We could not confirm a minimum dwelling size or single-lot manufactured-home rules in the city code.
Do you need a building permit in Gustine, and who issues it?
We could not confirm an official Gustine rule on general building permits, inspections or certificates of occupancy. The city's code does refer to building permits for accessory dwelling units6, and the city site lists a Building Division under Community Development4.
The Merced County Building and Safety Division issues building permits only for the unincorporated areas of Merced County, so it is not the office for a lot inside Gustine9. Call Gustine City Hall at (209) 854-64714 to confirm who reviews plans, which California code edition applies and what the fees are before you draw anything up. California's 2025 Building Standards Code applies to applications filed on or after January 1, 202610.
How do septic permits work in Gustine?
Merced County's Division of Environmental Health administers onsite wastewater permits under Merced County Code Chapter 9.543. The county requires an approval and construction permit before a new onsite sewage system is built or an existing one is repaired11.
We could not confirm whether a lot inside Gustine is required to connect to city sewer or may use a septic system, because the city's connection ordinance was not located. Ask City Hall first, then the Division of Environmental Health at (209) 381-110012. Soils matter too: only 4.6% of soils in Merced County rate as not limited for a conventional drain field, so a lot that needs septic will likely need a site evaluation or an engineered system13. Merced County's well permits are issued by the same Division14.
Can you live in an RV or tiny home in Gustine?
Gustine does not allow an RV or boat to be used as sleeping quarters on a residential site unless the City issues a valid Temporary Use Permit2. Exceptions in the city code: mobile home parks and the T district, emergency use after a home calamity with City Manager permission, and houseguests, who may stay up to 2 weeks in any 12-month period without a permit2.
Camping on public or private property in Gustine is unlawful, except friends or family of the owner with the owner's consent for up to 3 consecutive nights per calendar month; the City Manager can issue a camping permit for longer stays on private residential property5.
We found no tiny-home provision in the city's code. State guidance says RVs are generally limited to mobilehome parks or special occupancy parks unless a local ordinance allows otherwise15. Ask City Hall about tiny homes.
Can you build an accessory dwelling unit in Gustine?
Yes. Gustine's code allows accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs) and requires them to comply with California Government Code sections 65852.2 and 65852.226. Conversions and limited detached ADUs need only a building permit; other ADUs need a building permit and an ADU permit6.
A detached ADU that goes through the building-permit-only route is capped at 800 square feet with side and rear setbacks of at least 4 feet, and a JADU is capped at 500 square feet6. The city section continues with height, parking and other standards that we did not confirm.
Building a home in Gustine: the steps, in order
- Call Gustine City Hall at (209) 854-64714 and ask which zoning district your parcel is in and whether a planning permit is needed1.
- Ask the City which office issues building permits and inspections for the lot, since that was not confirmed.
- Ask the City whether the lot must connect to city sewer; if it does not, apply to Merced County Environmental Health for a septic construction permit11.
- If you plan to live on site during construction, ask about a Temporary Use Permit before parking an RV2.
- As an owner-builder you may be exempt from California contractor licensing, but not from local permits or inspections7.
What stays with Merced County, and what to check before you buy
Septic and well permits sit with Merced County's Division of Environmental Health3. Land outside Gustine city limits falls under the county's rules, where the county requires building permits for new construction in unincorporated areas16; see the Merced County page for those rules.
County-level figures: Merced County's effective property tax rate is 0.7%17, and the typical home value is $418,99618. Confirm flood zone status for your parcel with City Hall; Merced County's floodplain ordinance covers its own jurisdiction, and we could not confirm a floodplain rule inside Gustine19.
Watch-outs
- Searches for Gustine building permits often land on Merced County's Building and Safety Division, which serves only unincorporated Merced County9.
- Gustine's general building-permit process, fees and inspections were not confirmed on an official page; call City Hall at (209) 854-64714.
- Whether a lot inside Gustine can use septic or must connect to city sewer was not confirmed; ask City Hall and Merced County Environmental Health12.
- An RV used for sleeping on a residential lot without a Temporary Use Permit is an infraction, and each day counts as a separate violation2.
Sources
- Gustine Zoning-Subdivision Code Sec. 4-52-030 Limited Term Permit (Gustine), quoted and re-checked
- Gustine Zoning-Subdivision Code Sec. 4-44-120 Recreational Vehicle and Boat Storage (Gustine), quoted and re-checked
- Onsite Wastewater Treatment System Construction & Destruction Application/Permit, quoted and re-checked
- City of Gustine (City Hall) (cityofgustine.com)
- Gustine Municipal Code Sec. 3-2-82 Camping prohibited (Gustine), quoted and re-checked
- Gustine Zoning-Subdivision Code Sec. 4-44-140 Accessory Dwelling Units (Gustine), quoted and re-checked
- California Business and Professions Code Section 7044 (2026 county census)
- Zoning Code | Merced County, CA, quoted and re-checked
- Building & Safety, quoted and re-checked
- Approved Building Standards (California statewide rule), quoted and re-checked
- On-site Septic System Standards, quoted and re-checked
- Merced County Division of Environmental Health (countyofmerced.com)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Well Construction, Destruction, Mining, and Export Application/Permit User Guide, quoted and re-checked
- hcd.ca.gov (California statewide rule), quoted and re-checked
- Guide to Building Permits & Inspections in Merced County (unincorporated areas), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
- Merced County Unified Development Ordinance, Article 2, quoted and re-checked
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.