Unincorporated Colusa County, California requires building permits for new buildings and many alterations, and every application goes through the county's online permit portal1,2. County zoning covers unincorporated land; the cities of Colusa and Williams run their own zoning inside city limits3,4,5. Septic systems and wells outside city sewer come from Colusa County Environmental Health, not the Building Department6,7.
Do you need a building permit in Colusa County, California?
Yes.
Yes. Colusa County requires permits for new residential, commercial and industrial buildings, additions, decks, pools, water heaters, patio covers, conversions, expansions, reroofing, electrical and plumbing systems, heating and air-conditioning systems, and structures over 120 square feet; the county says that list is not exhaustive1. The 2025 California Building Standards Code became effective January 1, 2026 and applies to building-code work the county administers15. After issuance, county inspectors verify that work matches the permit, applicable codes and approved plans1. At completion, the inspector signs the job card, and the county can issue a Certificate of Occupancy or Notice of Completion upon request1. An owner-builder option can exempt a qualifying owner from contractor licensing, but it does not remove the county permit or inspection requirements14,16.
Who issues building permits in Colusa County, and how do you reach them?
The Colusa County Building Department receives building applications through the county's online permit portal and reviews project plans for code compliance.
The Colusa County Building Department receives building applications through the county's online permit portal and reviews project plans for code compliance2. The coordinated review sends the plot plan to Planning for allowed-use and setback review, Environmental Health for wells and waste disposal, the applicable fire district for State Fire-Safe review, and Public Works for county-road encroachments, flood hazards and significant grading2. The Building Department is at 1213 Market Street in Colusa and can be reached at (530) 458-04812. A complete plan set may need electrical and plumbing plans, truss and energy calculations, a plot plan, and applicable sprinkler and solar plans2. Public Works publishes separate fees: a county-right-of-way encroachment permit costs 3% of the estimated work, weekend or holiday inspections are billed separately, and a flood-zone development permit has no fee17.
Does Colusa County have zoning, and what does it mean for setbacks and lot size?
Yes.
Yes. The Colusa County Zoning Code applies to all unincorporated land in Colusa County3. Inside city limits, Colusa administers its own zoning ordinance4 and Williams sets zoning under its own Title 175; the county's rules below do not apply there, and we could not confirm who issues building permits in either city, so ask the city. The county publishes a countywide map plus maps for named communities and unincorporated parts of Colusa and Williams18. Planning reviews whether a proposed use is allowed and whether the plot plan meets setbacks2. Minimum parcel size is 80 acres in F-A and U-C, 40 acres in E-A and 10 acres in U-T and A-T12, and 20 acres in A-T-2012. In those agricultural districts a home (a non-agricultural structure) needs 25-foot front and rear setbacks, and side setbacks of 25 feet in F-A, E-A and U-C or 20 feet in U-T and A-T12. Non-agricultural structures may reach 30 feet unless a variance is obtained12. Manufactured or mobile homes are permitted in listed residential and agricultural zones12. A second unit must have at least 150 square feet; we could not confirm a minimum size for primary homes3. A second unit may be up to 1,200 square feet, or 2,500 in the agricultural districts F-A, E-A, U-C, U-T and A-T3.
How do septic permits work in Colusa County?
Colusa County Environmental Health administers onsite wastewater treatment systems in unincorporated areas for ordinary systems designed at 10,000 gallons per day or less.
Colusa County Environmental Health administers onsite wastewater treatment systems in unincorporated areas for ordinary systems designed at 10,000 gallons per day or less6. A permit is required before constructing, reconstructing or repairing a septic system, and site evaluation is part of approval9. Only 3.9% of county soils avoid a severe USDA limitation for a conventional drain field, so test the actual homesite early and budget for a design beyond a standard trench system if the evaluation requires one19. A property with an approved available sanitary sewer within 200 feet must connect when the right-of-way and required sewer-authority and LAFCO approvals can be obtained6. Surface-discharge approaches such as surface irrigation or evaporation ponds are not authorized as county OWTS, and alternative systems carry installation, operating, monitoring and inspection requirements6. Environmental Health is at 1213 Market Street in Colusa and can be reached at (530) 458-088820.
Can you live in an RV or tiny home on your land in Colusa County?
You cannot use an RV as a permanent residence in unincorporated Colusa County; temporary RV occupancy during home construction requires a Temporary Use Permit and must fit the circumstances allowed by county code.
You cannot use an RV as a permanent residence in unincorporated Colusa County; temporary RV occupancy during home construction requires a Temporary Use Permit and must fit the circumstances allowed by county code10. We could not confirm a general private-land camping allowance outside that construction pathway, so ask Planning before placing or occupying an RV. Colusa County's tiny-home ordinance, adopted December 14, 2021, treats a park-trailer tiny home outside an approved mobile-home or special-occupancy park as an accessory dwelling unit, but only if all of these are met: utilities connect to county-approved systems under an issued county permit; the wheels and tongue are removed; a county-approved foundation with its own building permit supports it; and the exterior looks like a house rather than an RV, with matching skirting, to the Community Development Director's satisfaction11. A tiny home on wheels that cannot meet those conditions is not covered by that pathway, so confirm the classification with Planning before buying one11. Manufactured and mobile homes are allowed in listed residential and agricultural districts, while temporary mobile homes require a Temporary Use Permit12,13.
Building a home in Colusa County: what are the steps?
Ask Planning to verify the parcel's zoning district, allowed residential use, setbacks and any required land-use approval before finalizing plans.
- Ask Planning to verify the parcel's zoning district, allowed residential use, setbacks and any required land-use approval before finalizing plans2.
- Start the Environmental Health site evaluation and septic permit if public sewer is unavailable, because poor drain-field ratings make early soil work especially valuable9,19.
- Apply to Environmental Health before drilling, modifying or abandoning a water well7.
- Prepare the building plans and a plot plan showing buildings, utilities, sewage disposal, streets, easements and access2.
- Submit the complete building application through the online permit portal2.
- Coordinate with Public Works if the project affects county right-of-way, grading or a flood hazard, and obtain a Caltrans encroachment permit if access enters a state highway21,22.
- Keep approved plans onsite and complete the required inspections through final sign-off1.
What should you check before buying land in Colusa County?
First determine whether the parcel is unincorporated or inside Colusa or Williams, then use the county's published maps and have the responsible planning office confirm the exact zone, allowed dwelling type, setbacks and parcel status.
First determine whether the parcel is unincorporated or inside Colusa or Williams, then use the county's published maps and have the responsible planning office confirm the exact zone, allowed dwelling type, setbacks and parcel status8,18. A land division requires county subdivision review in unincorporated Colusa County23. Check the FEMA flood map, which the county says covers the unincorporated areas, and ask Public Works about floodplain permits and elevation certificates before choosing a building pad; Public Works also reviews every building-permit plot plan for flood hazards, and the flood-zone development permit carries no fee24. The county's pages do not spell out construction standards for flood zones, so get those from Public Works in writing24. Verify legal access too: Public Works issues and inspects permits for work in county right-of-way, while access onto a state highway needs Caltrans approval21,22. Wells require a county permit, and severe drought occurs in about 41% of years7,19. Septic feasibility is a major purchase contingency because only about 4% of soils avoid severe limits for a conventional drain field19.
Watch-outs
- A shed or similar structure over 120 square feet is specifically listed as permit-required, but the county's list is not exhaustive; ask the Building Department before beginning smaller work too1.
- Permanent RV residence is not allowed, and temporary occupancy during home construction requires a Temporary Use Permit10.
- A nearby sewer can change the septic plan: qualifying structures within 200 feet of approved available sanitary sewer must connect when the ordinance's access and approval conditions are met6.
- Public Works says county subdivision standards are being updated and may change before revised standards are posted, so confirm the current version before designing a land split23.
- The county's tiny-home pathway applies to park trailers outside approved parks, and the Community Development Director judges the exterior and skirting, so ask Planning to confirm a specific unit before you buy11.
Sources
24 official pages, each quoted and re-checked · written October 16, 2026
- Building Permits
- Building Permits
- Colusa County Zoning Code
- Colusa: City of Colusa zoning information (Colusa County)
- Williams: Williams Code 17.01.030 Permitted; limited; conditional; and temporary uses (Colusa County)
- Colusa County Onsite Wastewater Treatment Systems Ordinance (2026 county census)
- Appendix G Drainage, Hydrology, and Water Quality Analysis
- Zoning Code | Colusa County, CA
- Colusa County Onsite Wastewater Treatment Systems Ordinance
- countyofcolusaca.gov
- Ordinance No. 819 — Tiny Homes
- Colusa County Zoning Code — Zoning Classifications, Allowed Uses, and Development Standards
- Colusa County Zoning Code: Zoning Classifications, Allowed Uses, and Development Standards
- Building Permit Form
- Building | Colusa County, CA - Official Website
- Owner-Builder Responsibilities (California statewide rule)
- Fee Schedule
- Zoning Code
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Colusa County Environmental Health (countyofcolusaca.gov)
- Colusa County Public Works (countyofcolusaca.gov)
- Encroachment Permits | Caltrans (California statewide rule)
- Subdivision Standards
- Floodplain Development Permits | Colusa County
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Colusa County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.