The Town of Marana, Arizona requires a town building permit before constructing, enlarging, substantially modifying or moving a residential building or mobile home.1 Marana sets its own zoning; for addresses in Pima County, the county handles septic construction and discharge authorizations.23 Start with Marana Building Safety and Planning for the home and land use, and Pima County Onsite Wastewater for septic.45
At a glance
- Building permit
- Town permit required for residential construction, enlargement, substantial modification or relocation1
- Zoning
- Town zoning applies inside Marana limits2
- Septic
- Pima County construction and discharge authorizations for Pima County addresses3
- Minimum lot size
- Residential district number multiplied by 1,000 square feet6
- AG setbacks
- Front and side: 40 feet; rear: 60 feet7
- Owner-builder
- Conditional Arizona contractor-license exemption; building permits still apply8
Who to call
Building permits
Town of Marana Building Safety
Town building-permit requirements and application plans
Building permits
Town of Marana Development Services — Building Safety and Planning
Building-permit and zoning questions; development guidance
11555 W. Civic Center Drive, Bldg. A2
Floodplain permits
Town floodplain management and development engineering questions
Codes & inspections
Town of Marana Development Services — Project Requirements
Project-specific building-permit guidance and floodplain-use reminder
Septic permits
Pima County Onsite Wastewater Treatment Facilities
Septic construction and discharge authorizations, inspections and transfers for Pima County addresses
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Town of Marana means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Marana, AZ?
Marana requires a town building permit before residential construction, enlargement, substantial modification or relocation, including mobile homes.1 Marana’s application requires scaled plans showing lot dimensions, existing buildings relative to property lines, and proposed off-street parking.1 Plans must also detail structural features and electrical, plumbing and mechanical installations for town review.1
Marana’s project guidance exempts one-story detached storage sheds or playhouses limited to 200 square feet measured from the foundation edge; ask Building Safety about your exact project before relying on that exemption.94
Who handles building permits and zoning in the Town of Marana?
Marana Building Safety answers building-code and building-permit questions at (520) 382-2600.4 Marana Planning answers zoning questions at the same number or [email protected].4 The town’s One-Stop Shop brings together planners, building-code examiners and engineering technicians for new-development questions.4
Use the town counter for a home inside Marana limits; Pima County regulates septic construction, replacement, ownership transfer and closure for Pima County properties.110 For a parcel outside town limits, consult the Pima County guide: the county’s building-permit requirement applies to unincorporated county land.11
Does the Town of Marana have zoning, lot-size rules and setbacks?
The Town of Marana has its own zoning chapter, and the official zoning-map data layer is the final authority for current zoning status.212 In Marana’s single-family residential districts, the number after the dash determines the minimum lot area when multiplied by 1,000 square feet; R-180 requires 180,000 square feet.6
Marana’s AG district requires front and side setbacks of 40 feet and a rear setback of 60 feet, with maximum lot coverage of 40%.713 Use those dimensions only for AG land, and ask Marana Planning to identify the parcel’s district before drawing a home, barn or workshop layout.74
How do septic permits work inside the Town of Marana?
For a Marana property in Pima County that will use septic, Pima County must issue a Construction Authorization before the facility is constructed or replaced.3 After the final field inspection, Pima County must issue a Discharge Authorization before the system is buried and used.3 A site investigation determines whether the home needs a conventional or alternative system, so settle wastewater feasibility before committing to a home layout.3
When buying a Pima County property already served by septic, the seller must obtain a qualified inspection within 6 months before transfer and provide the report before closing.14 The buyer must submit the Notice of Transfer within 15 calendar days after transfer.14
Can you live in an RV or tiny home in the Town of Marana?
We could not confirm a Marana rule allowing residential RV occupancy, temporary camping during construction, or tiny-home occupancy; ask Marana Planning about the proposed use and parcel zoning before buying.4 Marana has town zoning, so a district’s lot-size allowance does not by itself answer whether the intended dwelling is allowed.26
Arizona’s Recreational Vehicle Long-Term Rental Space Act concerns rented spaces in RV or mobile-home parks; that law does not establish permission to live in an RV on a private Marana lot.15 Ask Building Safety what plans and building approval a proposed small permanent home needs.14
What steps should you take before building a home in the Town of Marana?
Start with Marana Planning: identify current zoning through Marana Maps and confirm the proposed use and district dimensions.412 Next, resolve septic feasibility with Pima County for a Pima County address, including the site investigation and Construction Authorization.3 Ask Marana Engineering about floodplain management; a structure in the floodplain may need a floodplain use permit in addition to its building permit.169
Then prepare the scaled site and construction plans for Marana Building Safety and obtain the town building permit before starting residential construction.1 For projects requiring an appeal period, Marana will not issue building permits until that period expires.4 Arizona’s owner-builder exemption concerns contractor licensing for qualifying owner occupancy, and does not remove local building-permit requirements.8
Watch-outs
- Do not bury or use a new septic system at a Pima County address until Pima County issues its Discharge Authorization after final field inspection.3
- We could not confirm Marana’s minimum dwelling size or required public water and sewer connections; ask Marana Planning and Building Safety before choosing a house design.4
- Marana’s AG setback figures are district-specific; confirm the parcel’s current zoning on the official map.712
Sources
- Town of Marana Building Safety (codelibrary.amlegal.com)
- Chapter 17-4. Zoning (Town of Marana), quoted and re-checked
- Onsite Wastewater Treatment Facilities, quoted and re-checked
- Town of Marana Development Services — Building Safety and Planning (maranaaz.gov)
- Pima County Onsite Wastewater Treatment Facilities (pima.gov)
- 17-4-5 Residential zoning districts (Town of Marana), quoted and re-checked
- 17-4-4 Agricultural (AG) (Town of Marana), quoted and re-checked
- Persons not required to be licensed; penalties; applicability (Arizona statewide rule), quoted and re-checked
- Town of Marana Development Services — Project Requirements (maranaaz.gov)
- Onsite Wastewater Treatment Facilities, quoted and re-checked
- Do I Need a Permit?, quoted and re-checked
- 17-4-1 Zone districts and zoning groups established (Town of Marana), quoted and re-checked
- 17-4-4 Agricultural (AG) (Town of Marana), quoted and re-checked
- Onsite Wastewater Treatment Facilities, quoted and re-checked
- 33-2101 - Application; duration of stay; exclusions; notice and pleading requirements (Arizona statewide rule), quoted and re-checked
- Town of Marana Engineering (maranaaz.gov)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.