Inside the city limits of Southside, Alabama, property owners must get a Building and Zoning Permit before starting construction, and the city's Building Department enforces its own zoning12. Septic permits for Southside addresses do not come from the city: the Etowah County Health Department handles them3. The rules below apply inside Southside; unincorporated Etowah County is a different set of rules.
At a glance
- Building permit
- Building and Zoning Permit required before construction inside city limits1
- Zoning
- City zoning with named districts, run by the Building Department24
- Septic
- Permit from the Etowah County Health Department where no public sewer connects35
- RV living
- Not allowed on a residential lot; parking limited to a few consecutive days6
- Certificate of occupancy
- Required after final inspection for work under a zoning permit7
- Owner-builder
- Alabama licensing exemption for owners building their own one- or two-family home8
Who to call
Building permits
Building and zoning permits, inspections and flood management inside Southside city limits
2255 Highway 77, Southside, Alabama 35907
Septic permits
Etowah County Health Department, Environmental Office
Septic-tank requests and environmental complaints in Etowah County, including addresses inside Southside
709 East Broad Street, Gadsden, Alabama 35903
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Southside means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Southside, Alabama?
Yes. Every property owner inside Southside city limits must apply for and receive a Building and Zoning Permit before any construction activity, which includes site preparation, excavation, new buildings, accessory or temporary structures, moving a structure, and alteration or repair1. Painting, interior remodeling and work that does not change a structure's character, size or position are excluded1. The city's application carries a $50 fee9.
The Building and Zoning approval is not the building permit itself: building permits are purchased separately after zoning approval10. Southside enforces building, electrical, plumbing, mechanical gas and fire standards, though we could not confirm which code editions it has adopted11.
Who issues building permits in Southside, and how do you reach them?
The Southside Building Department issues building and zoning permits for land inside the city limits12. Call (256) 442-9775 or visit 2255 Highway 77, Southside, Alabama 3590712. Submit a completed application with the necessary supporting documents to City Hall; incomplete applications are not processed10.
The city employs two building inspectors for permitted jobs, and the department asks for inspection requests at least 24 hours in advance1312. Building permits and zoning belong to the city, but septic permits stay with the Etowah County Health Department3.
Does Southside have zoning, and what does it mean for RVs, lot size and setbacks?
Yes. Southside zones land inside its limits, and its adopted code contains districts including RT Rural Transitional and MHP Manufactured Home Park24. Rules differ by district, so check the parcel's district with the Building Department before you buy12.
In the RT district, accessory residential dwelling units are allowed if they meet the city's accessory-dwelling section14. In the MHP district, manufactured homes need at least 1,000 square feet of gross floor area and rental lots at least 6,000 square feet, with impervious surface capped at 40 percent and structures at 25 feet or two stories15161718. The MHP district is meant to be served by municipal water and sewer19. We could not confirm dimensional rules for the city's other districts.
How do septic permits work inside Southside, Alabama?
Inside Southside, septic approval comes from the Etowah County Health Department, not the city, and the city's own permit application says its approval does not stand in for it3. Alabama law requires a permit from the local health department before installing or repairing an onsite system on property that is not connected to a public sanitary sewer5. The application needs a site evaluation and professional soils information20.
Call the Environmental Office at 256-439-2586 and ask for the environmental office21. Soils matter: only 18.3% of Etowah County soils are rated without severe limitations for a conventional drain field, so expect to need an engineered design on many lots22. If a public sewer line serves the lot, none of this applies; ask the city which lots are connected.
Can you live in an RV or tiny home in Southside, Alabama?
Not in an RV on a residential lot. Southside bars living, sleeping and housekeeping use of a recreational vehicle parked on a residential lot or in any unapproved location6. Major RVs may be parked off-street for no more than three consecutive days, may not sit in a front yard except in an enclosed structure, and must be registered and tagged if stored outside6.
A manufactured home is a different case: Alabama recognizes a qualifying manufactured home as a residence, and Southside provides a dedicated MHP district for them2319. We could not confirm any Southside rule on tiny homes, so ask the Building Department how a tiny home on a foundation or wheels would be classified12.
Building a home in Southside: the steps, in order
- Call the Etowah County Health Department Environmental Office for a site evaluation if no public sewer serves the lot521.
- Submit the Building and Zoning application to City Hall, then buy the separate building permit after zoning approval10.
- If the lot is in a mapped flood hazard area, plan the lowest floor at least one foot above base flood elevation24.
- Schedule inspections with 24 hours' notice12.
- Obtain a certificate of occupancy after final inspection before anyone moves in7.
What stays with Etowah County, and what to check before you buy in Southside?
Septic permits stay with the Etowah County Health Department even inside Southside3. Private wells require a Notification of Intent to the state before work starts, rather than a permit issued to the owner25.
Etowah County's own subdivision regulations and floodplain ordinance are written for the county's jurisdiction outside city limits, so confirm with the Building Department which rules reach a parcel at the city's edge2627. Land outside Southside's limits in unincorporated Etowah County is reported as not zoned, which is not true inside the city28. Property taxes are set at the county level, where the effective rate is about 0.4% and the median bill about $585 a year2930.
Watch-outs
- The Building and Zoning Permit is separate from the building permit, so zoning approval alone does not let construction start10.
- Living in an RV on a residential lot inside Southside is prohibited, and parking is limited to a few consecutive days6.
- Septic approval comes from the Etowah County Health Department, not from the city's building permit3.
Sources
- Building and Zoning Permit Application (Southside), quoted and re-checked
- Building Department (Southside), quoted and re-checked
- Building and Zoning Permit Application (Southside), quoted and re-checked
- Sec. 30-142. RT Rural Transitional zoning district (Southside), quoted and re-checked
- Onsite Sewage Disposal (Southside), quoted and re-checked
- Sec. 30-86. Recreational vehicle parking and storage (Southside), quoted and re-checked
- Article V. Administrative and Enforcement Guidelines (Southside), quoted and re-checked
- Exemptions (Alabama statewide rule), quoted and re-checked
- Building Department (Southside), quoted and re-checked
- Building and Zoning Permit Application (Southside), quoted and re-checked
- Building Department (Southside), quoted and re-checked
- Southside Building Department (cityofsouthside.com)
- Building Department (Southside), quoted and re-checked
- Sec. 30-142. RT Rural Transitional zoning district (Southside), quoted and re-checked
- Sec. 30-146. MHP Manufactured Home Park zoning district (Southside), quoted and re-checked
- Sec. 30-146. MHP Manufactured Home Park zoning district (Southside), quoted and re-checked
- Sec. 30-146. MHP Manufactured Home Park zoning district (Southside), quoted and re-checked
- Sec. 30-146. MHP Manufactured Home Park zoning district (Southside), quoted and re-checked
- Sec. 30-146. MHP Manufactured Home Park zoning district (Southside), quoted and re-checked
- Onsite Sewage | Alabama Department of Public Health, quoted and re-checked
- Etowah County Health Department, Environmental Office (alabamapublichealth.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- What is a manufactured home? (Alabama statewide rule), quoted and re-checked
- Sec. 14-71. Specific standards (Southside), quoted and re-checked
- ADEM Administrative Code Division 9, quoted and re-checked
- Subdivision Regulations of Etowah County, Alabama, quoted and re-checked
- Etowah County Floodplain Development Ordinance, quoted and re-checked
- Gadsden-Etowah IDA - Permits and Regulations (2026 county census)
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.