Preston County, West Virginia
Kingwood is a city in Preston County, West Virginia. Kingwood adopts its own zoning, so inside its limits Kingwood’s rules apply, not the county’s. Septic permits inside Kingwood come from Kingwood. 9 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Preston County page.
Construction and listed building-related work within Kingwood city.
“A building permit shall be required to be obtained by the owner or authorized agent for the construction of buildings/homes, additions/alterations to buildings/homes, remodeling, repairs or renovations performed, moving of a building/home, demolition and excavation in regard to property, fences, signs, pools, accessory buildings and other structures within the municipality.”
Building-code adoption by Kingwood city inside city limits.
“Adoption of the State Building Code is repealed. All references to the “State Building Code” in any corresponding ordinances are removed and replaced with “ordinance/ordinances.” All city ordinances requiring building permits and zoning approval shall remain in force and effect.”
Land inside Kingwood city limits.
“The city is hereby divided into six zoning districts and six height and area districts, which shall be known as:”
Alternative sewage systems inside Kingwood city limits.
“No individually owned septic system or septic tank nor multi-user septic system nor any other form of sewage system and treatment plant, other than that sewage system maintained by the city shall be permitted within the municipal boundaries of the city, unless approved by the Sanitary Board of the city.”
Individually owned, multi-user, or other non-city sewage systems inside Kingwood city limits.
“Upon application to the said Sanitary Board for use of a sewage system separate from that maintained by the city, the Board shall determine if it can adequately supply said sewage service to said applicant and only upon such a determination that sewage service cannot be adequately provided shall the Sanitary Board approve the installation and use of an individual septic tank or other multi-user sewage system and treatment plant or any other form of sewage treatment within the municipal boundaries.”
Non-city sewage systems inside Kingwood city limits.
“No individually owned septic system or septic tank nor multi-user septic system nor any other form of sewage system and treatment plant, other than that sewage system maintained by the city shall be permitted within the municipal boundaries of the city, unless approved by the Sanitary Board of the city.”
Sewage service for property inside Kingwood city limits.
“Notice of this provision shall be given to the Department of Health verifying the requirement of the usage of the municipal sewage system within said municipal boundaries.”
Accessory buildings and structures inside Kingwood city limits.
“A building permit shall be required to be obtained by the owner or authorized agent for the construction of buildings/homes, additions/alterations to buildings/homes, remodeling, repairs or renovations performed, moving of a building/home, demolition and excavation in regard to property, fences, signs, pools, accessory buildings and other structures within the municipality.”
Foundation excavation, construction, structural alteration, and specified land/building uses inside Kingwood city limits.
issuance timing for a conforming vacant-land or change-of-use permit: <= 10 days after application (only where the proposed use conforms to Chapter 152)
“A building permit for the use or occupancy of vacant land, or for a change in the use of land, or of an existing building, shall be applied for and issued before any such land shall be occupied or used, or such land or building changed in use, and such permit shall be issued within ten days after application has been made, provided that such proposed use is in conformity with the provisions of this chapter.”
We looked and could not find an official answer yet. Silence is not permission; ask Kingwood or Preston County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Kingwood publishes no rule on the point, not that none exists. Preston County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Kingwood means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.