Zoning, building permits and septic rules in Village of Clearview, West Virginia
Village of Clearview is a village in Ohio County, West Virginia. Septic permits inside Village of Clearview come from the state health agency. 3 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Ohio County page.
Answers from the rulebook for Village of Clearview
Rules another office applies inside Village of Clearview
Village of Clearview does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Who permits septicState (with conditions)
Onsite sewage or excreta-disposal systems installed inside Clearview village limits.
A written permit must be obtained from the Commissioner of the Bureau for Public Health or the commissioner's authorized representative before installation or establishment.
The system must be installed according to the commissioner's plans, specifications, and instructions, or ones approved in writing.
Commercial or industrial wastes subject to West Virginia Department of Environmental Protection regulatory control are excepted from §16-1-9.
“from the commissioner or his or her authorized representative.”
Septic permitRequired
Installation or establishment of a sewage or excreta-disposal system inside Clearview village limits.
The permit is a written permit from the Commissioner of the Bureau for Public Health or the commissioner's authorized representative.
The system must be installed according to the commissioner's plans, specifications, and instructions, or ones approved in writing.
Commercial or industrial wastes subject to West Virginia Department of Environmental Protection regulatory control are excepted from §16-1-9.
“without first obtaining a written permit to install or establish the system or method”
Well permitRequired
Installation or establishment of a water-supply system inside Clearview village limits.
A written permit must be obtained from the Commissioner of the Bureau for Public Health or the commissioner's authorized representative before installation or establishment.
The water-supply system must be installed according to the commissioner's plans, specifications, and instructions, or ones approved in writing.
This finding is for water-supply systems under §16-1-9; the opened source does not separately define every type of well.
“must apply and obtain a permit from their Local Health Department prior to drilling, modifying, or abandoning the well.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Village of Clearview or Ohio County directly.
Building permit — Residential construction inside Clearview village limits.
Owner-builder exemption — Owner-built residential construction inside Clearview village limits.
Building code adopted — Buildings inside Clearview village limits.
Inspections — Building inspections inside Clearview village limits.
Certificate of occupancy — Occupancy of buildings inside Clearview village limits.
22 more unanswered
Local zoning
Zoning districts
Minimum dwelling size
Minimum lot size
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Septic inspection
Mandatory utility hookup
Agricultural exemption
Shed and accessory-building permit exemption
Subdividing land
Driveway access
Building in a floodplain
Short-term rentals
Permit fees
Permit process
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Clearview publishes no rule on the point, not that none exists. Ohio County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Clearview means bringing your own water and power. The kit we’d start with: