Nicholas County, West Virginia
Richwood is a city in Nicholas County, West Virginia. 11 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Nicholas County page.
Location of mobile homes or house trailers within Richwood city limits.
“In order to aid the enforcement of this ordinance, a building permit must be obtained and approved by the City Council prior to location in any area of the municipality.”
Buildings and structures within Richwood corporate limits.
“There is hereby adopted and incorporated by reference, to safeguard life and property and to ensure the quality of construction, the West Virginia Building Code, as promulgated by the State Fire Commission under West Virginia Code section 29-3-5B and WV COR Title 87 Series 4.”
Buildings or premises in flood-hazard areas subject to the City floodplain ordinance.
“In areas of flood hazard it shall be unlawful to occupy, or to permit the use or occupancy, of any building or premises. or both, or part thereof hereafter created, erected, installed, changed. converted or wholly or partly altered or enlarged in its use or structure until a certificate of compliance has been issued by the Floodplain Administrator stating that the building or land conforms to the requirements of this local law.”
Development adjacent to watercourses inside Richwood's floodplain-ordinance area.
flood protection setback: twice watercourse-channel width or 50 feet, whichever is less (Measured from the top of the banks of all watercourses.)
“A Flood Protection Setback equal to twice the width of the watercourse channel measuring from the top of one bank to the top of the opposite bank or 50 feet, whichever is less, shall be maintained from the top of the banks of all watercourses.”
Recreational vehicles placed in any special flood-hazard area inside Richwood.
maximum continuous on-site duration: < 180 days (Alternative compliance is full highway readiness or installation under manufactured-home placement and flood-reduction requirements.)
“Recreational vehicles to be placed within any special flood hazard area shall either: i. Be on site for fewer than 180 consecutive days. Or, ii. Be fully licensed and ready for highway use.”
Mobile homes entering and locating within Richwood corporate limits.
mobile-home permit registration fee: 5 USD · permit period: 1 year (Renewal permit without additional charge may be issued if occupant is not violating Chapter 10.)
“All mobile homes coming into the city must first obtain a permit from the city recorder before locating such mobile home in the corporate limits. The occupant of a mobile home shall pay to the city recorder, for such permit the sum of five dollars ($5) as a registration fee, and such permit shall be issued for a period of one year.”
Premises inside Richwood that meet the City sewer-line frontage/abutting and usability conditions in Code § 18-1.
“No other means and methods for the collection and disposal of sewage and Waste material from such dwellings, buildings or premises shall hereafter be permitted or allowed.”
A dwelling, building, or premises inside Richwood that fronts or abuts a street, alley, or easement containing a usable City combined waterworks and sewerage-system sewer line.
“Every owner of a dwelling, building or premises within the city fronting or abutting upon any street, alley or easement in which there is installed a sewer line which is apart of the combined waterworks and sewerage system of the city, and which can use the sewage services and facilities of such system, shall connect, or cause to be connected, the plumbing and sewer lines of such dwelling, building or premises to the sewer system of the city and shall use such services and facilities.”
Development in Richwood flood-hazard areas governed by the City floodplain ordinance.
start-work deadline: <= 180 days (Unless a written time extension is granted by the Floodplain Administrator.) · completion deadline: <= 18 months (Unless a written time extension is granted by the Floodplain Administrator.)
“The Floodplain Administrator shall immediately issue, or cause to be issued, a “Stop-Work Order” for any development found ongoing without having obtained a floodplain determination or a permit.”
Private connections to a City municipal sewer main.
private sewer connection permit fee: 10 USD
“No person shall make any private sewer connection with any municipal sewer main without first applying for and obtaining a permit therefor from the water board. No such permit shall be granted until a fee of ten dollars ($10) shall have been paid into the city treasury therefore, which fee is hereby levied.”
Floodplain development requiring a City floodplain permit or site-plan approval.
“Application for a permit and/or site plan approvals shall be made, in writing, on the forms supplied by the City of Richwood, and shall include all information stipulated under Article V of this ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Richwood or Nicholas County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Richwood publishes no rule on the point, not that none exists. Nicholas County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Richwood means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.