Lewis County, West Virginia
Weston is a city in Lewis County, West Virginia. Weston adopts its own zoning, so inside its limits Weston’s rules apply, not the county’s. 12 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Lewis County page.
Buildings and structures within Weston corporate limits.
“There is hereby adopted by the Common Council for the purpose of establishing rules and regulations for the construction, alteration, removal, demolition, equipment, use and occupancy, location, and maintenance of buildings and structures situated within corporate limits of the city that certain building code, being the most current version of the West Virginia State Building Code, dated August 1, 2020, as amended”
Land inside Weston city limits.
“No building or structure shall be constructed, erected, expanded, enlarged, or otherwise structurally altered until a zoning permit has been issued by the Zoning Officer.”
Land inside Weston city limits.
“For the purpose of this code, the city is hereby divided into the following zoning districts.”
Accessory structures used as dwellings inside Weston city limits.
“Except as provided elsewhere in this code, no accessory structure shall be constructed and used as a dwelling; provided, however, that one residential unit for a caretaker may be permitted in conjunction with any active industrial establishment.”
Private/off-grid wastewater disposal inside Weston city limits.
“Except as hereinafter provided, no person shall construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of wastewater.”
Occupied, employed, recreational, or other properties inside Weston city limits that abut a public-sewer street, alley, or right-of-way.
public sewer distance from property line: <= 100 feet (Connection condition stated by § 52.02(D).) · connection deadline after official notice: <= 90 days
“The owner(s) of all houses, buildings, or properties used for human occupancy, employment, recreation, or other purposes, situated within the city and abutting on any street, alley, or right-of-way in which there is now located or may in the future be located a public sanitary or combined sewer of the city, is hereby required at the owner’s expense to install suitable toilet facilities herein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this chapter, within 90 days after date of official notice to do so, provided that the public sewer is within 100 feet ((80.50) meters) of the property line.”
City residential or commercial building-sewer permits inside Weston city limits.
residential or commercial building-sewer permit tap fee: 150 USD (Or other amount deemed appropriate by the Municipal Court.) · industrial building-sewer permit tap fee: 150 USD (Or other amount deemed appropriate by the Municipal Court.)
“A tap fee of $150, or other amount deemed appropriate by the Municipal Court, for a residential or commercial building sewer permit and a tap fee of $150, or other amount deemed appropriate by the Municipal Court, for an industrial building sewer permit shall be paid to the city at the time the applications are filed.”
Zoning permits for construction and city building-sewer connection permits inside Weston city limits.
“All applications for zoning permits shall be made in writing by the owner of the property or lot or the owner’s authorized agent and shall be filed with the Zoning Officer.”
Weston does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
R-1 Single-Family Residential District.
minimum lot size: No minimum · minimum lot width: >= 40 feet
“Min. Lot Size (Sq. Ft.) No minimum Min. Lot Width. 40 feet”
R-1 Single-Family Residential District.
front setback: 10 feet (Or the average of the two adjoining properties with pre-existing structures, whichever is less.) · side setback: 5 feet · rear setback: No minimum
“Min. Front Setback 10 feet, or the average of the two adjoining properties which have pre-existing structures, whichever is less Min. Side Setback 5 feet Min. Rear Setback No minimum”
R-1 Single-Family Residential District.
maximum lot coverage: No maximum
“Min. Lot Width. 40 feet Max. Lot Coverage (as a %) No maximum Min. Front Setback”
R-1 Single-Family Residential District.
maximum building height: <= 35 feet
“Lot, yard, and height requirements. Max. Building Height 35 feet Min. Lot Size (Sq. Ft.)”
We looked and could not find an official answer yet. Silence is not permission; ask Weston or Lewis County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Weston publishes no rule on the point, not that none exists. Lewis County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Weston means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.