Jefferson County, West Virginia
Town of Bolivar is a town in Jefferson County, West Virginia. Town of Bolivar adopts its own zoning, so inside its limits Town of Bolivar’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Jefferson County page.
New construction and additions inside Bolivar town
permit threshold: > 100 square feet (smaller structures exempt from permit but must meet density and setbacks)
“all permanent structures shall require a permit. any structure not greater than 100 square feet does not require a permit but must conform to density and setback requirements.”
New construction and additions inside Bolivar town
“all such new construction must conform to state regulations and licensing and adhere to the international building code and the wv state building code as adopted and amended by the state fire marshal.”
Permitted construction inside Bolivar town
minimum inspections: >= 4 inspections (decks: one inspection)
“all applicants must agree to a minimum of four inspections by the zoning administrator to assure that the applicant is in compliance with the zoning ordinance and this building ordinance.”
Land inside the incorporated area of Bolivar town (Jefferson County)
“the incorporated area of the town of bolivar is hereby divided into the following districts which can be located on the land use map to the comprehensive plan”
Incorporated area of Bolivar town
“all of the remainder of the incorporated area of bolivar is hereby declared to be included in the residential district of bolivar and designated as "r" district.”
Buildings and new single-family/duplex units inside Bolivar town (general lot requirements)
minimum building size: >= 800 square feet
“buildings must be a minimum of 800 square feet.”
All districts, Bolivar town (general lot requirements)
minimum lot size: >= 0.5 acre (lots existing on the 2000 assessor's map)
“every building shall be located on an individual lot defined as no less than one half acre, or a lot in existence on the jefferson county tax assessor's map for the year 2000.”
All districts, Bolivar town (general lot requirements)
front and rear setback: >= 15 feet · side setback: >= 10 feet
“lots are considered buildable if setbacks of 15 feet front and back, and 10 feet on each side can be met.”
All districts, Bolivar town (general lot requirements)
maximum building height: <= 35 feet
“buildings are limited to no more than 35 feet in height.”
Residential (R) district, Bolivar town
“plus three (3) permitted accessory structures thereto but excluding tents cabins and trailers or mobile homes, except that one trailer or mobile home may be temporarily used as a residence on a lot while a dwelling is being constructed, within the term of the construction permit.”
New construction units inside Bolivar town
“each new construction unit must have written proof of access of water and sewer service from harpers ferry water works and harpers ferry¬bolivar public service district.”
Subdivision of land inside Bolivar town
“lots in excess of one acre may be subdivided as provided in article 1725 of this ordinance.”
New construction inside Bolivar town
“access to parking by a driveway will be reviewed for safety and drainage.”
Building permits inside Bolivar town
“costs of processing and filing permits shall be established by the planning commission on an annual basis and shall be added to the filing fee.”
Building permits inside Bolivar town
“all permits are valid for one year from date of issue. a permit may be renewed by submission of a new application payment of fee, and zoning administrator and commission review.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Bolivar or Jefferson County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Bolivar publishes no rule on the point, not that none exists. Jefferson County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Bolivar means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.