Wood County, Wisconsin
Town of Port Edwards is a town in Wood County, Wisconsin. Town of Port Edwards adopts its own zoning, so inside its limits Town of Port Edwards’s rules apply, not the county’s. Septic permits inside Town of Port Edwards come from Wood County (Wood County Department of Planning & Zoning, Sanitary Program · (715) 421-8466). 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Wood County page.
Buildings erected, moved, structurally altered, or primary buildings demolished inside the Town of Port Edwards.
permit expiration if construction not started: 1 year (Measured from the issuing date on the permit.)
“no building shall hereafter be erected, moved, or structurally altered, nor may a primary building be demolished until a building permit has been applied for and issued by the town of port edwards. no building permit shall be issued for a dwelling until a sanitary permit has been issued by the wood county planning and zoning office in accordance with wisconsin state law.”
Land inside the Town of Port Edwards, Wisconsin.
“Due to the narrow scope of the Wood County Zoning Ordinance, (12) of the (22) towns have adopted their own town zoning ordinances. In such cases, zoning administration and enforcement are the town’s responsibility, not the Wood County Department of Planning and Zoning.”
Dwellings in any zoning district inside the Town of Port Edwards.
minimum dwelling lot size: >= 2 acres (No dwelling may be constructed on a smaller lot in any district.) · minimum duplex parcel size: 4 acres (Duplexes.)
“no dwelling may be constructed on any lot size smaller than 88,700 sq. ft., or two acres in any district. only one, single-family dwelling shall be constructed per two-acre parcel. a duplex requires a four-acre parcel.”
Town building-permit applications.
“all applications for building permits shall be in writing to the road superintendent of the town of port edwards. the applications shall be accompanied by plans in duplicate,”
Town of Port Edwards does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Lots in the Town of Port Edwards Agricultural District.
maximum total building ground coverage: <= 25 percent of lot size (Total of all buildings on a lot in the Agricultural District.)
“the total ground area occupied by the total of all the buildings on a lot in this district shall not exceed 25% of the lot size.”
“the total ground area occupied by the total of all buildings on a lot in this district shall not exceed 25% of the lot size.”
Private camping with a camper in the Town of Port Edwards Residential District.
camper occupancy: < 30 weeks per year (Private camping in the Residential District.)
“private camping where camper is occupied less than 30 weeks per year.”
Private camping with a camper in the Town of Port Edwards Residential District.
camper occupancy: < 30 weeks per year (Private camping in the Residential District.)
“private camping where camper is occupied less than 30 weeks per year.”
Manufactured homes in the Town of Port Edwards Residential District.
minimum lot area per unit: >= 2 acres (Manufactured homes in the Residential District.)
“manufactured home – requires minimum two-acre lot per unit. manufactured homes and mobile homes are considered as single-family dwellings or residences and are subject to the same regulations as other single-family dwellings.”
Sanitary permitting for dwellings inside the Town of Port Edwards.
“no building permit shall be issued for a dwelling until a sanitary permit has been issued by the wood county planning and zoning office in accordance with wisconsin state law.”
A dwelling for which a Town of Port Edwards building permit is sought.
“no building permit shall be issued for a dwelling until a sanitary permit has been issued by the wood county planning and zoning office in accordance with wisconsin state law.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Port Edwards or Wood County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Port Edwards publishes no rule on the point, not that none exists. Wood County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Port Edwards means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.