Wood County, Wisconsin
Town of Cameron is a town in Wood County, Wisconsin. Town of Cameron adopts its own zoning, so inside its limits Town of Cameron’s rules apply, not the county’s. Septic permits inside Town of Cameron come from Wood County (Wood County Department of Planning & Zoning, Sanitary Program · (715) 421-8466). 12 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Wood County page.
Buildings, structures, permanent building equipment, and their parts built, enlarged, altered, demolished, or moved into the Town of Cameron.
minor-work exemption threshold: <= 1000 USD (Only if work does not change occupancy, area, structural strength, fire protection, exits, light, heat, or ventilation.)
“No building, structure, permanent building equipment, or any part thereof, shall hereafter be built, enlarged, altered, or demolished within or moved into the Town unless a permit is obtained by the owner or the owner’s agent from the Zoning Administrator.”
Buildings subject to the Town zoning ordinance inside the Town of Cameron.
“Buildings shall be inspected at such time and in such manner as may be necessary to secure compliance with the laws, ordinances, rules and orders applicable thereto.”
Land inside the Town of Cameron, Wood County, Wisconsin.
“The Town Board of the Town of Cameron, Wood County, Wisconsin, does ordain as follows:”
Zoning districts inside the Town of Cameron.
districts: R-1 Residential; R-2 Rural Residential; AG-1 Agricultural; C-1 General Commercial; C-2 Commercial; I-1 Industrial
“For the purposes of this Ordinance, the Town of Cameron, Wood County, Wisconsin, is hereby divided into the following districts:”
Recreational-vehicle occupancy as a residence inside the Town of Cameron.
temporary construction occupancy: <= 1 year (A Zoning Administrator permit and required fee are required.)
“No recreational vehicle or mobile home shall be located and occupied as a residence within the Town except as provided in Section 8 below, and after the date of adoption of this Ordinance, except for the purpose of using such unit while a permanent dwelling is being constructed, not to exceed a period of one year for such purpose.”
Certified survey maps and subdivision plats for land inside the Town of Cameron.
“The subdivision platting process shall follow and conform to the provisions of the Wood County Land Subdivision Ordinance and Chapter 236, Wisconsin Statutes.”
Building-permit applications involving driveway access inside the Town of Cameron.
“With such application there shall be submitted to the Zoning Administrator a set of plans covering the proposed project, alterations or improvements, showing the location of any proposed building with respect to adjoining streets, alleys, lot lines and other buildings, and reflecting access and/or driveway plans consistent with Section 6.03.7 of this Ordinance.”
Town building permits inside the Town of Cameron.
permit commencement deadline: <= 12 months (Measured from permit date.)
“Application for a building permit shall be made in writing on a blank form furnished by the Zoning Administrator and shall state the name and address of the owner of the project and the owner of the land upon which it is to be constructed.”
Town of Cameron does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private septic systems inside the Town of Cameron, Wood County.
“The Wood County Planning & Zoning Office is the County agency responsible for the regulation and inspection of septic systems”
POWTS work and non-plumbing sanitation systems inside the Town of Cameron.
“No person shall locate, install, move, reconstruct, extend, enlarge, convert, substantially alter or change the use of a POWTS or any of its component parts without the appropriate sanitary permit and without full compliance with the provisions of the permit and this ordinance and all applicable local, county and state regulations.”
Private septic systems inside the Town of Cameron.
“visibly inspected at least once every three (3) years”
Development work inside the Town of Cameron where the parcel is within a shoreland or floodplain zone.
“Approval by the Wood County Planning and Zoning Office is required”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Cameron or Wood County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Cameron publishes no rule on the point, not that none exists. Wood County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Cameron means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.