Bolthole Index

Washington County, Wisconsin

Zoning, building permits and septic rules in Village of Kewaskum, Wisconsin

Village of Kewaskum is a village in Washington County, Wisconsin. Village of Kewaskum adopts its own zoning, so inside its limits Village of Kewaskum’s rules apply, not the county’s. 3 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Washington County page.

Answers from the rulebook for Village of Kewaskum

Village of Kewaskum’s own rules

  • Local zoningPresent

    Land inside the Village of Kewaskum, Washington County, WI

    • Map certification says changes made after Oct. 3, 2016 are not effective until entered on the certified copy.
    “this zoning map for the village of kewaskum, washington county, wisconsin, was adopted and approved as part of the zoning ordinance of the village of kewaskum on may 25, 2004 and has been updated to reflect rezonings and annexations adopted through october 3, 2016. changes made thereafter shall not become effective until entered on this certified copy.”
  • Zoning districtsPublished

    Zoning districts inside the Village of Kewaskum

    • Map also shows overlay districts (floodway, floodfringe, general floodplain, planned unit development, residential/business transition) and districts B-1, B-2, B-3, C-1, C-2, I-1, M-1, M-2, M-3, P-1.
    • Map updated through Oct. 3, 2016 only.

    districts listed: A-1 Agricultural/Transitional; RS-1 and RS-2 Single-Family Residential; RD-1 Two-Family Residential; RM-1 Multi-Family Residential

    “agricultural / transitional rs-1 single - family residential rs-2 single - family residential rd-1 two - family residential rm-1 multi - family residential”
  • Permit feesPublished

    Building permits for new construction inside the Village of Kewaskum

    • Form version 1.5 dated 01/01/24; also lists zoning $75, occupancy permit $60 per unit, erosion control $200, 1 & 2 family plan review $200, state seal $50, minimum permit fee $50.

    building permit fee: per 0.35 USD per sq ft (minimum $50) · plumbing/gas/HVAC/electrical fee: per 0.06 USD per sq ft each

    “permit fees: (minimum = $50.00) building: sq. ft. x.35 plumbing: sq. ft. x.06 gas piping: sq. ft. x.06 hvac: sq. ft. x.06 electrical: sq. ft. x.06”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Kewaskum or Washington County directly.

  • Building permit — Building permits inside the Village of Kewaskum
  • Owner-builder exemption — Owner-builder exemption inside the Village of Kewaskum
  • Building code adopted — Building code inside the Village of Kewaskum
  • Inspections — Building inspections inside the Village of Kewaskum
  • Certificate of occupancy — Occupancy permits inside the Village of Kewaskum
22 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Kewaskum publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.

← All of Washington County: county rules, score and offices