Vernon County, Wisconsin
Town of Coon is a town in Vernon County, Wisconsin. Town of Coon adopts its own zoning, so inside its limits Town of Coon’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Vernon County page.
Construction, reconstruction, remodeling, or moving of any building in the Town of Coon when estimated cost is over $1,000.
estimated project cost threshold: > 1000 USD
“A building site permit shall hereafter be required for the construction, reconstruction, remodeling or moving of any building within the Town of Coon whenever the cost of such shall be estimated to be over the amount of $1,000.00.”
Town of Coon building or zoning inspections.
advance notice: 24 hours (Entry by the Zoning Committee or duly appointed deputies for a building or zoning inspection.)
“The Zoning Committee and duly appointed deputies may enter with a 24-hour notice onto any public or private land or waters to make a building or zoning inspection”
Land and waters within the limits of the Town of Coon.
“JURISDICTION: The jurisdiction of this ordinance shall include all lands and waters which are located within the limits of the Town of Coon.”
Land within the Town of Coon zoning jurisdiction.
number of established districts: 5
“For the purpose of this ordinance, the Town of Coon, Vernon County, Wisconsin is hereby divided into FIVE districts, as follows: Established Districts: 1 – Residential 2 – Agricultural 3 - Commercial 4 – Industrial 5 – Special Purpose”
Mobile homes located within Town of Coon boundaries.
minimum parcel size: >= 2 acres (Placement of a mobile home in the Town of Coon.) · compliance deadline: <= 6 months (Removal of tongue and wheels and skirting or foundation.)
“Any mobile home located within the Town of Coon boundaries, shall have the tongue and wheels removed and be fully skirted or placed on a foundation within six months. Placement of any mobile home in the Town of Coon shall be on land with a minimum size of two (2) acres and shall have a sewage system and water system and shall be reclassified as residential.”
Outdoor privies or toilets inside the Town of Coon.
“Outdoor privies or toilets shall be permitted only if the meet the restrictions of the State Sanitation Code as provided by the Department of Industry, Labor and Human Relations of the State of Wisconsin, no outdoor privy shall be constructed when a public or private sewage system is in existence in the area of such proposed construction. A building site permit must be obtained and such construction of any such outdoor privy or toilet must be approved by the County Zoning Administrator.”
Agricultural uses on parcels exceeding five acres inside the Town of Coon.
parcel size: > 5 acres (Agricultural-purpose land-use restrictions.)
“There shall be no restrictions against the use of lands for agricultural purposes when those parcels are in excess of five (5) acres, except as otherwise provided herein.”
Land divisions within Town of Coon Township boundaries that result in a subdivision as defined by the ordinance.
“Any division of land within the Township boundaries which shall result in a subdivision as defined above, except assessor’s plats, shall: A. Be surveyed using a certified survey map prepared in accordance with sec. 236.34, Wis. Stats.”
Town building-permit applications for projects located near a floodplain.
“If you are switching trailer homes, adding on to an existing house, building a new home or located near the floodplain the County Zoning Administrator will have to inspect your project before a permit can be issued.”
Town of Coon building-site permits for structures valued at $1,000 or more.
building-site permit fee: 100 USD (Structure with value of $1,000 or more.)
“The building site permit requirement also includes a fee of $100.00 for any structure with a value of $1,000.00 or more.”
Town of Coon building-permit applicants.
“Send or take all completed forms to Town of Coon Zoning Administrator for his approval and signature.”
Town of Coon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
A parcel in the Town of Coon Residential District proposed for dwelling construction.
minimum parcel area: >= 2 acres (Residential-zone dwelling parcel.) · minimum parcel width: >= 200 feet (Measured as described in the ordinance.)
“No dwelling shall be constructed on a parcel of land within a residential zone having an area of less than 2 acres and a width of less than 200 feet.”
“The minimum parcel size to establish a residence for a farm operation shall be two (2) acres.”
Buildings in the Town of Coon Agricultural District.
road-centerline setback: >= 58 feet (From centerline of street or town road.) · adjoining-property-line setback: >= 25 feet (Eaves or overhang above ground level excluded.)
“Unless otherwise provided, there shall be a setback line of not less than 58 feet. Such setback line shall be the minimum horizontal distance between the centerline of the street or town road and the nearest point of a building or any projection thereof including uncovered steps. There shall also be a setback line of not less than 25 feet from adjoining property lines.”
“Unless otherwise provided, there shall be a setback line of not less than 58 feet. Such setback line shall be the minimum horizontal distance between the centerline of the street or town road and the nearest point of a building or any projection thereof including uncovered steps. There shall also be a setback line of not less than 25 feet from adjoining property lines.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Coon or Vernon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Coon publishes no rule on the point, not that none exists. Vernon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Coon means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.