Town of Pigeon is a town in Trempealeau County, Wisconsin. 6 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Trempealeau County page.
Town of Pigeon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New dwellings and related building work for which the Trempealeau County Department of Land Management issues uniform building permits; applicability specifically inside Pigeon town is not stated on the cited page
“A UDC seal is required for all new one and two family dwellings (see below).”
New dwellings permitted through Trempealeau County Department of Land Management; applicability inside Pigeon town not separately stated
“Includes all required building, HVAC, electric & plumbing permits, and final occupancy permit, does not include Land Use / Zoning Permit.”
Installation of a private on-site wastewater treatment system (septic) on any property in Wisconsin, including Pigeon town
sanitary permit validity: 2 years (renewable for similar periods)
“no person may purchase or install a private on-site wastewater treatment system unless the owner of the property on which the private on-site wastewater treatment system is to be installed holds a valid sanitary permit issued under this section.”
Private on-site wastewater treatment systems installed in Wisconsin, including Pigeon town; inspecting unit presumed to be Trempealeau County
“inspect all private on-site wastewater treatment systems after construction but before backfilling no later than the end of the next workday”
Land use / zoning permit fees for new one- and two-family dwellings processed by Trempealeau County Department of Land Management; applicability inside Pigeon town not separately stated on the cited page
land use / zoning permit, 1-family or 2-family residential (administrative, land use / zoning related site evaluation): 210 USD (per fee schedule effective 1/1/25; other building, HVAC, electrical and plumbing permits are separate) · well permit fee line: 65 USD (per fee schedule worksheet)
“Residential housing (Dwellings, houses and additions including attached garages) - Administrative, Land use / Zoning Related Site Evaluation ………………………………$210.00 $___________”
Land use and uniform building permit applications in Trempealeau County; the town-signature step applies where the project is in a town
“must be signed by town or city official prior to presentation and payment at the county office.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pigeon or Trempealeau County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pigeon publishes no rule on the point, not that none exists. Trempealeau County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Pigeon means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of Trempealeau County: county rules, score and offices