Sawyer County, Wisconsin
Town of Edgewater is a town in Sawyer County, Wisconsin. Town of Edgewater adopts its own zoning, so inside its limits Town of Edgewater’s rules apply, not the county’s. Septic permits inside Town of Edgewater come from the county and state together. 14 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Sawyer County page.
New or replacement structures in Edgewater town subject to Sawyer County zoning.
“A Land Use Permit (LUP) is required for any new or replacement structure, as defined in Sawyer County Zoning Ordinance Section 2.0, that is being built, assembled, or placed on land for usage either long-term or temporary.”
Land inside the Town of Edgewater, which is among Sawyer County townships covered by the county comprehensive zoning ordinance.
“All unincorporated areas & shorelands are covered by these Ordinances. All of the townships, with the exception of Spider Lake have adopted the Comprehensive Zoning Ordinance.”
Recreational-vehicle occupancy in Edgewater town under Sawyer County zoning.
“Campgrounds and recreational vehicle parks are not intended to be used for the permanent or long-term residency of site occupants.”
Camping on vacant land inside Edgewater town subject to Sawyer County zoning and sanitation administration.
“If camping on vacant land, sanitation is required and shall be enforced.”
Manufactured-home installations and mobile-home occupancy inside Edgewater town.
“Except as otherwise specifically authorized, no mobile home intended for occupancy shall be located within Sawyer County except in a mobile home park, the plan of which”
Privies serving land inside Edgewater town subject to Sawyer County sanitation rules.
non-plumbing sanitary permit fee: 150 USD
“In accordance with Sawyer County Zoning and Private Sewage System Ordinance and Wisconsin State Code (Chapter SPS 391, Chapter NR 113), privies will be reviewed, inspected, and must meet minimum construction, structural, and sanitary requirements.”
Town driveway permits and county non-plumbing sanitary permits affecting Edgewater town.
non-plumbing sanitary permit fee: 150 USD (privy construction)
“Non-plumbing sanitary permit fee: $150 Permit is good for the life of the privy, placard valid for 2 years after issuance to construct or place privy”
County land-use permit applications for land inside Edgewater town.
“No land use permit shall be issued for a structure designed or intended for human use or occupancy before a Fire number, Certified Soil Test, and Sanitary application is filed in the office of the Zoning Administrator.”
Town of Edgewater does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family dwellings, including manufactured-home installations, inside Edgewater town.
“The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
New one- and two-family dwellings inside Edgewater town under the UDC.
“The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
Private sewage systems serving land inside Edgewater town that is not served by public sewer.
“A Wisconsin licensed plumber must submit an application and POWTS design, which is reviewed by the County Sanitarian. The permit is then processed and approved with the plumber receiving a State or County placard.”
Installation, repair, or alteration of a private sewage system inside Edgewater town.
“Wisconsin Statutes dictate that a sanitary permit is required to install, repair or alter a private sewage system. Only Wisconsin licensed plumbers can design and apply for a sanitary permit.”
New or modified private sewage systems inside Edgewater town.
“Once ready, the plumber will schedule the needed installation inspection with the county sanitarian.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Edgewater or Sawyer County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Edgewater publishes no rule on the point, not that none exists. Sawyer County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Edgewater means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.