Bolthole Index

Sauk County, Wisconsin

Zoning, building permits and septic rules in Village of North Freedom, Wisconsin

Village of North Freedom is a village in Sauk County, Wisconsin. Village of North Freedom adopts its own zoning, so inside its limits Village of North Freedom’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Sauk County page.

Answers from the rulebook for Village of North Freedom

Village of North Freedom’s own rules

  • Local zoningPresent

    All land inside North Freedom village limits

    • Administered through village plan committee, zoning administrator and village board (per chapter table of contents).
    “whereas, the village of north freedom has a zoning ordinance and;”
  • Zoning districtsPublished

    Zoning districts inside North Freedom village

    • Certified land use map is kept at the village clerk's office.
    “3.3 single family residential district (r-1) 3.4 multi-family residential district (r-2) 3.5 mobile home residential district (r-2)”
  • Minimum dwelling sizeSpecified

    R-1 single family residential district, North Freedom village

    • R-2 multi-family district: 850 sq ft single family home, 600 sq ft multi-family unit.

    minimum floor area: >= 1000 sq ft

    “g. minimum lot area for 2-family: 9,900 s.f. h. minimum floor area: 1,000 s.f. i. off-street parking, residential: 2 space/per dwelling unit”
    One more reviewed finding on this topic
  • Minimum lot sizeSpecified

    R-1 single family residential district, North Freedom village

    • 2-family lots need 9,900 s.f.
    • All lots must abut a public street with 66 ft minimum frontage, except existing improved lots.

    minimum lot area, single family: >= 6600 sq ft · minimum lot width: >= 66 ft

    “e. minimum lot width: 66 ft. f. minimum lot area for single family: 6,600 s.f. g. minimum lot area for 2-family: 9,900 s.f.”
    One more reviewed finding on this topic
  • SetbacksSpecified

    A-1 undeveloped land (agricultural) district, North Freedom village

    • Front setback 50 ft from street right-of-way.

    rear yard setback: >= 50 ft · side yard setback, principal buildings: >= 20 ft · side yard setback, accessory buildings: >= 10 ft

    “b. minimum front yard setback: 50 ft. from street right-of way line minimum rear yard setback; 50 ft. c. 35 ft. residential d. minimum side yard setback: principal buildings, 20 feet accessory buildings, 10 feet”
    One more reviewed finding on this topic
    • Specified — R-1 single family residential district, North Freedom village
      “b. minimum front yard setback from highway or street right-of-way: (note: more restrictive standards may be imposed by state and county regulations in certain circumstances where lots abut on state or county highways.) 10 ft. c. minimum rear yard setback: principal buildings: accessory buildings: 10 ft. 10 ft. d. minimum side yard setback: principal buildings: 10 ft. ea. side accessory buildings: 10 ft. ea. side”
  • Building heightSpecified

    R-1 single family residential district, North Freedom village

    maximum building height: <= 25 ft

    “the following standards shall apply a. maximum building height: 25 ft.”
  • Manufactured homesLimited

    Type I manufactured homes as permanent residences inside North Freedom village

    • Nonconforming structures excepted.
    • Must be in a mobile home park (mobile home residential district: 2-acre minimum lot area, 150 ft minimum width, max 7 units per gross acre).
    “no type i manufactured homes (other than nonconforming structures) shall be permitted to be used as permanent residences within the village unless they are located in a mobile home park”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of North Freedom or Sauk County directly.

  • Building permit — Building permits inside North Freedom village
  • Owner-builder exemption — Owner-builder exemption inside North Freedom village
  • Building code adopted — Building code inside North Freedom village
  • Inspections — Building inspections inside North Freedom village
  • Certificate of occupancy — Certificates of occupancy inside North Freedom village
18 more unanswered
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of North Freedom publishes no rule on the point, not that none exists. Sauk County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of North Freedom means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Sauk County: county rules, score and offices