Sauk County, Wisconsin
Town of Fairfield is a town in Sauk County, Wisconsin. Town of Fairfield adopts its own zoning, so inside its limits Town of Fairfield’s rules apply, not the county’s. Septic permits inside Town of Fairfield come from Sauk County (Sauk County Land Resources and Environment — Land Use/Sanitary Permits · (608) 355-3245). 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Sauk County page.
Buildings, signs, structures, and covered alterations or moves in the area subject to the Fairfield zoning ordinance.
permit commencement deadline: <= 1 year (from permit issue date)
“No building, sign or other structure or any part thereof shall hereafter be built, enlarged, altered, or moved within the area subject to the provisions of this ordinance until a building permit has been applied for in writing and obtained from the building inspector.”
Building activity governed by Fairfield's zoning ordinance.
“The building inspector shall supervise and inspect all building activity and assist zoning activity as directed by the Administrator and the Agency.”
Vacant land and buildings or structures erected, altered, or moved in the area subject to the Fairfield zoning ordinance.
issuance period: <= 10 days (after compliant work is completed)
“No vacant land shall be occupied or used and no building or structure hereafter erected, altered or moved shall be occupied or used until a certificate of occupancy shall have been issued by the building inspector.”
Land inside Fairfield town, outside incorporated cities and villages.
use districts: 4
“the entire area of the Town of Fairfield outside the limits of incorporated cities and villages are hereby divided into four (4) use districts, namely:”
Land inside Fairfield town outside incorporated cities and villages.
published districts: 4 districts
“The boundaries of these four (4) districts are shown upon the map of the Town of Fairfield, being designated the "Zoning Map of the Town of Fairfield, Wisconsin", and made a part of this ordinance.”
Camping on a lot with an existing residence in the Agriculture Conservancy District inside Fairfield town.
“State approved sanitary systems shall be available.”
Planned unit developments and conservation subdivisions inside Fairfield town.
“In order to create a PUD pursuant to Land Division and Subdivision Ordinance Section 1.39, a Conditional Use Permit must first be obtained from the Planning and Zoning Commission.”
Fees under Fairfield's zoning ordinance.
“Fees shall be reviewed annually by the Town Board and a fee schedule adopted by resolution.”
Building-permit applications inside Fairfield town.
“All applications for a building permit shall be accompanied by a location sketch drawn to scale, showing the location, actual shape and dimensions of the lot to be built upon, the exact size and location of the building on the lot, the existing or intended use of building, the number of families to be accommodated, the distances between the nearest point on the building and the center line of the highway, and other information with regard to the proposed building and neighboring lots and buildings as may be called for on the application or may be necessary to provide for the enforcement of this ordinance.”
Town of Fairfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
One- and two-family dwellings built since June 1, 1980, including those inside Fairfield town.
“The UDC is enforced in all Wisconsin municipalities.”
Buildings used wholly or partly for seasonal or temporary habitation in Fairfield's Environmental Conservancy District.
minimum floor area: >= 400 square feet (seasonal or temporary habitation)
“Buildings used in whole or in part for seasonal or temporary habitation shall have a floor area of not less than 400 square feet.”
Buildings in Fairfield's Agriculture Conservancy District.
maximum building height: <= 35 feet (except as otherwise provided in the ordinance)
“Except as otherwise provided in this ordinance, no building shall exceed a height of 35 feet.”
Camping units at campgrounds in the Recreational-Commercial District inside Fairfield town.
“Occupancy of a camping unit on a continuous, year-round basis or utilization of a camping unit as a permanent abode or legal place of residence shall be prohibited.”
Private onsite wastewater treatment systems inside Fairfield town.
“Private Onsite Waste Water Treatment Systems Ordinance.”
A new residence with private septic inside Fairfield town.
“In addition to the permit application and plot plan”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Fairfield or Sauk County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Fairfield publishes no rule on the point, not that none exists. Sauk County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Fairfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.