Bolthole Index

Sauk County, Wisconsin

Zoning, building permits and septic rules in Town of Bear Creek, Wisconsin

Town of Bear Creek is a town in Sauk County, Wisconsin. Town of Bear Creek adopts its own zoning, so inside its limits Town of Bear Creek’s rules apply, not the county’s. Septic permits inside Town of Bear Creek come from Sauk County (Sauk County Land Resources and Environment — Land Use/Sanitary Permits · (608) 355-3245). 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Sauk County page.

Answers from the rulebook for Town of Bear Creek

Town of Bear Creek’s own rules

  • Building permitRequired

    New homes, additions, sheds, garages, barns, cabins, driveways, and other listed local-permit work inside Bear Creek town.

    • New homes and additions also require a General Engineering permit.
    • General Engineering permits will not issue until all Sauk County permits are obtained.
    • A General Engineering permit also requires a local permit.
    “Local permits required are new homes, additions, sheds, garages, barns, cabins, driveways etc.”
  • Local zoningPresent (with conditions)

    Land inside the Town of Bear Creek, Sauk County, Wisconsin.

    • The town's published ordinance list identifies a Land Use Ordinance dated 08-04-2009; district text and amendments could not be extracted from the linked PDF during this research.
    “Ordinances SEPT2025-Recycling Ordinance FEB2025-Utility Accomodation Policy MAR2023-Commercial Buildings Land Use Ordinance 08-04-2009”
  • Who permits septicCounty (with conditions)

    Private-septic new-residence projects inside Bear Creek town, for which the town directs applicants to obtain Sauk County permits before the General Engineering permit can issue.

    • A septic maintenance agreement, plumber/installer-signed POWTS application, soil test, and state-approved septic plans are required with the application materials.
    “The Zoning Division is tasked with permitting, inspections and enforcement of the ordinances the department administers. These ordinances include: Zoning, Shoreland Protection, Floodplain, Rural Identification System, Nonmetallic Mining Reclamation, and Private Onsite Waste Water Treatment Systems Ordinance.”
  • Septic permitRequired

    New residences with private septic systems inside Bear Creek town, through Sauk County permitting required before the associated General Engineering permit issues.

    • Submit a permit application and plot plan.
    • Also submit a septic maintenance agreement, POWTS sanitary application signed by the plumber/installer, original and copy of soil test, and original and copy of state-approved septic plans.
    “NOTE: In addition to the permit application and plot plan, you will also need to submitt a Septic Maintenance Agreement form, a POWTS sanitary application signed by your plumber/installer, as well as an original and 1 copy of a soil test and an original and 1 copy of state approved septic plans.”
  • Driveway accessRequired

    Driveways inside Bear Creek town.

    • The town lists driveways among work requiring a local permit.
    • The town page labels a driveway application at $50.

    driveway application fee: 50 USD

    “Local permits required are new homes, additions, sheds, garages, barns, cabins, driveways etc.”
  • Permit feesPublished (with conditions)

    The listed driveway and CSM/CUP/rezone/variance applications inside Bear Creek town.

    • The page labels $300 for CSM, CUP, rezone, and variance, and $50 for a driveway application; it does not establish fees for every permit type.

    CSM, CUP, rezone, variance fee: 300 USD · driveway application fee: 50 USD

    “CSM, CUP, Rezone, Variance $300 Driveway Application $50”
  • Permit processPublished (with conditions)

    New-home and addition permitting inside Bear Creek town.

    • Contact the town supervisor first for further information and a possible site review.
    • New homes and additions require General Engineering approval.
    • General Engineering will not issue until all Sauk County permits are obtained.
    • General Engineering permits also require a local permit.
    “CONTACT JEFF SCALLON FIRST FOR FURTHER INFORMATION AND A POSSIBLE SITE REVEIW. New homes and additions require a permit from General Engineering. Contact Dennis Butteris at [email protected] or 608-617-1216. General Engineering permits will not be issued until all Sauk County permits are obtained. Permits issued by General Engineering also require a local permit.”

Rules another office applies inside Town of Bear Creek

Town of Bear Creek does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    New one- and two-family dwellings, including manufactured-home installations, inside Bear Creek town.

    • Applies to new one- and two-family dwelling units; the page identifies the governing code as SPS 320-325.

    code chapters: SPS 320-325

    “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
  • InspectionsRequired

    New one- and two-family dwellings inside Bear Creek town.

    • Required inspections are footings, foundation and reinforcement, rough, insulation, and final.
    • When ready, the applicant must notify the inspector identified on the UDC permit.
    “The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Bear Creek or Sauk County directly.

  • Owner-builder exemption — Owner-built dwellings inside Bear Creek town.
  • Certificate of occupancy — Certificates of occupancy for construction inside Bear Creek town.
  • Zoning districts — Zoning or land-use districts inside Bear Creek town.
  • Minimum dwelling size — Dwellings inside Bear Creek town.
  • Minimum lot size — Lots inside Bear Creek town.
15 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Bear Creek publishes no rule on the point, not that none exists. Sauk County’s page lists the county offices to call.

← All of Sauk County: county rules, score and offices