Sauk County, Wisconsin
Baraboo is a city in Sauk County, Wisconsin. Baraboo adopts its own zoning, so inside its limits Baraboo’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Sauk County page.
Erecting, enlarging, altering, moving or demolishing buildings inside Baraboo city
“until a permit therefore shall first have been obtained by the owner, or his authorized agent, from the building inspector.”
Construction inside Baraboo city; city adopts state Uniform Dwelling Code by reference
“the uniform dwelling code - department of safety and professional services (dsps) chs. 316, 320 through 325, 360 through 366, and 375 through 387, the state flammable combustible, and hazardous liquids code - agriculture, trade, and consumer protection (atcp) ch. 93, and the state well drilling code - natural resources (nr) 812 of the wisconsin administrative code are hereby adopted by reference and the building inspector shall enforce the pro”
Buildings under construction inside Baraboo city
“no structural portion of any part of any building or structure shall be covered or concealed in any manner whatsoever without having the approval of the building inspector.”
New, converted or enlarged buildings inside Baraboo city
“no building or structure shall be occupied or used, in whole or in part, until a certificate of 10. fences 11. signs/canopy 12. park fees. see also §17.50 14-4 occupancy shall have been issued by the building inspector and posted on the premises;”
Land inside Baraboo city limits (Chapter 17 General Zoning of the city code)
“the department of building inspection shall be responsible for the supervision of the plumbing, electrical and building codes of the city, the safety inspection of all premises including structures and appurtenances located thereon, and the enforcement of the zoning code.”
Zoning districts in Baraboo city
“this district is for medium-density residential use. it is appropriate to use this district as a transitional land use between low- and highdensity residential districts, and residential and commercial districts.”
Single-family residential district in Chapter 17 with an 8,500 sq ft minimum lot (district name not captured)
minimum lot area: 8500 square feet · minimum lot width: 75 feet
“(5) lot size requirements. (a) minimum lot area: 8,500 square feet. (b) minimum lot width: 75 feet.”
“(5) lot size requirements. (a) minimum lot area: 12,500 square feet. (e) parks or playgrounds. (b) minimum lot width: minimum 100 feet.”
Building where public sewer/water are not available inside Baraboo city
“if sewer and/or water are not available, no permit shall be issued until a well and/or a septic tank or holding tank permit has been issued.”
Building where public water is not available inside Baraboo city
“if sewer and/or water are not available, no permit shall be issued until a well and/or a septic tank or holding tank permit has been issued.”
New buildings inside Baraboo city
“a certificate of occupancy shall not be issued until such utilities are available to service the property.”
We looked and could not find an official answer yet. Silence is not permission; ask Baraboo or Sauk County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Baraboo publishes no rule on the point, not that none exists. Sauk County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Baraboo means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.