Zoning, building permits and septic rules in Town of Big Bend, Wisconsin

Town of Big Bend is a town in Rusk County, Wisconsin. Town of Big Bend adopts its own zoning, so inside its limits Town of Big Bend’s rules apply, not the county’s. Septic permits inside Town of Big Bend come from Rusk County (Rusk County Zoning Office · (715)532-2156). 3 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Rusk County page.

Answers from the rulebook for Town of Big Bend

Town of Big Bend’s own rules

  • Building permitLimited

    Building activity inside the Town of Big Bend that requires a zoning or land-use permit under the Town zoning chapter.

    • The code characterizes the required approval as a zoning or land-use permit rather than a building permit per se.
    • The permit must be issued by the zoning department and grants permission only for activities for which the chapter specifically states that a permit is required.
    “building is an example of a land use activity that requires a zoning or land use permit.”
  • Local zoningPresent (with conditions)

    The unincorporated areas of the Town of Big Bend, Rusk County, Wisconsin.

    • The Town zoning code establishes R-1 Recreational-Residential, A-1 Agricultural, C-1 Commercial, I-1 Industrial, F-1 Forestry, W-1 Resource Conservation, SW-1 Shoreland and Shoreland-Wetland Overlay, UND Undeveloped, and GI Government Institutional districts.
    “the unincorporated areas of the Town are hereby divided”
  • Who permits septicCounty (with conditions)

    Private sewage systems on land inside the Town of Big Bend, which is in Rusk County, Wisconsin.

    • A sanitary permit must be issued before any other permits.
    • A dwelling not connected to municipal sewer must be connected to an onsite septic system.
    • Only a licensed plumber may install or repair a septic system.
    • A soil test must be performed to determine the type of septic system that can be installed.
    • A holding tank may be used only as a system of last resort.
    • Where there is no well and there will be no plumbing in the dwelling, a privy may be installed.
    “The Rusk County Private Sewage Ordinance is administered countywide.”

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.