Town of Lima is a town in Rock County, Wisconsin. Town of Lima adopts its own zoning, so inside its limits Town of Lima’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Rock County page.
Construction, erection, alteration, enlargement, repair, moving, conversion, or demolition of a building, structure, or mechanical system inside Lima town.
“Except as otherwise expressly provided in this Ordinance, no owner or contractor may construct, erect, alter, enlarge, repair, move, convert to other uses, or demolish any building, structure or mechanical system until a valid permit is obtained from the Town of Lima Building Inspector.”
Building work inside Lima town subject to the Town Building Code.
“The following Chapters of the Wisconsin Administrative Code, as well as all subsequent future amendments, modifications, and revisions, are adopted by the Town of Lima”
Commercial buildings inside Lima town.
“Provide HVAC and structural inspection of all sized commercial buildings with certified commercial building inspectors.”
Land-use changes and new construction inside Lima town.
“The aforementioned work shall also be required to meet the square footage requirements as set forth in Section 4.3 of the Town of Lima Zoning Ordinance.”
Town building permits inside Lima town.
“At the time of building permit issuance, the applicant shall pay fees as established by resolution periodically by the Town Board.”
Commercial buildings, structures, and alterations, including new buildings and additions under 25,000 cubic feet, inside Lima town.
plan sets: 4 sets (One set of specifications, component and system plans, and calculations showing code compliance are also required.)
“All commercial buildings, structures, and alterations, including new buildings and additions less than 25,000 cubic feet, require plan submission as follows:”
Town of Lima does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction of a new private well inside Lima town.
Well Construction Notification fee: 50.5 USD (The fee and notification number are not refundable or transferable.)
“Obtain a Well Construction Notification Number prior to constructing a well. This applies to both drilled wells and driven point wells.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Lima or Rock County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Lima publishes no rule on the point, not that none exists. Rock County’s page lists the county offices to call.
Off-grid gear