Racine County, Wisconsin
Burlington is a city in Racine County, Wisconsin. Burlington adopts its own zoning, so inside its limits Burlington’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Racine County page.
Building, enlarging, altering, demolishing or moving buildings inside Burlington city
“no building or structure, or any part thereof, shall hereafter be built, enlarged, altered or demolished within the city or moved into, within or out of the city except as hereinafter provided, unless a permit therefor shall first be obtained by the owner or his agent from the building inspector.”
One- and two-family dwellings inside Burlington city
“the wisconsin uniform dwelling code, chapters sps 320 through 327, and all amendments thereto, are hereby made a part of this code by reference and shall apply to all one- and two-family dwellings and alterations and additions thereto.”
New buildings, additions and alterations inside Burlington city
“the building inspector shall make a final inspection of all new buildings, additions and alterations.”
New buildings, additions and alterations inside Burlington city
“no building, or part thereof, shall be occupied until such final inspection or certificate has been issued, nor shall any building be occupied in any manner which conflicts with the conditions set forth in the certificate of occupancy.”
Land inside Burlington city limits (Racine County)
“for the purpose of this chapter, the city of burlington is hereby divided into the following 24 basic zoning districts”
Burlington city zoning districts
basic zoning districts: 24 districts
“for the purpose of this chapter, the city of burlington is hereby divided into the following 24 basic zoning districts”
A-1 Agricultural/Holding District, Burlington city
minimum dwelling area: >= 800 sq ft · maximum building height: <= 60 ft
“no farm dwelling or other residential structure shall be less than 800 square feet in area.”
A-1 Agricultural/Holding District, Burlington city
farm parcel area: >= 5 acres · farm parcel width: >= 300 ft · farm dwelling lot area: >= 40000 sq ft · farm dwelling lot width: >= 120 ft
“accessory farm dwellings, existing residential structures, and farm dwellings remaining after the consolidation of existing farms shall provide a lot area of not less than 40,000 square feet and a lot width of not less than 120 feet.”
“lots shall be a minimum of 14,000 square feet in area and shall be not less than 80 feet in width.”
RS-1 Single-Family Residence District, Burlington city
street yard: >= 25 ft · side yard each side: >= 8 ft · side yards total: >= 20 ft · rear yard: >= 25 ft
“a minimum street yard of 25 feet from the right-of-way of all public streets shall be required.”
“there shall be a minimum building setback of 25 feet from the street right-of-way.”
A-1 Agricultural/Holding District, Burlington city
maximum building height: <= 60 ft
“no building or parts of a building shall exceed 60 feet in height.”
“no building or parts of a building shall exceed 35 feet in height.”
New buildings needing a building permit inside Burlington city
“no building permit shall be issued under any circumstances until the building inspector is satisfied that the party desiring the permit has sewer and water facilities in accordance with the laws of the state and the ordinances of the city and that the same will be utilized by the applicant and the building which he/she desires to build will be connected with such utilities.”
Building permits inside Burlington city
“the building permit shall expire 24 months after issuance if the dwelling exterior has not been completed.”
We looked and could not find an official answer yet. Silence is not permission; ask Burlington or Racine County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Burlington publishes no rule on the point, not that none exists. Racine County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Burlington means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.