Portage County, Wisconsin
Town of Stockton is a town in Portage County, Wisconsin. Septic permits inside Town of Stockton come from Portage County (Portage County Planning & Zoning Department - On-Site Waste (POWTS) · (715) 346-1334). 20 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Portage County page.
New dwellings built inside the Town of Stockton (UDC building permit issued by the town)
“a uniform dwelling code (udc) building permit is required for all new dwellings and may be required for other improvements. these permits are issued by the town.”
Town of Stockton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New dwellings built inside the Town of Stockton
“it is not a “building permit” which is required separately by the state of wisconsin for actual construction of a structure”
Land inside the Town of Stockton (Portage County), which the county procedures list among the towns under Portage County zoning. This is county zoning that applies inside Stockton town, not an ordinance adopted by the town itself, as far as the county page shows.
“if you live in the towns of alban, almond, amherst, belmont, buena vista, carson, dewey, eau pleine, hull, lanark, linwood, new hope, plover, sharon, and stockton, you will need to secure a zoning permit before proceeding with your project.”
Portage County zoning districts that apply to land inside the Town of Stockton
“zoning district r1 rural & urban fringe max height (ft) (a) 35”
R1 Rural and Urban Fringe district land inside the Town of Stockton under Portage County zoning
minimum floor area, year-round dwelling: >= 720 sq ft (seasonal dwellings (less than six months per year) 400 sq ft)
“720 square feet for year-round dwelling (6 months or more/calendar year), 400 square feet for seasonal dwellings (less than six months calendar year).”
R1 Rural and Urban Fringe district land inside the Town of Stockton under Portage County zoning
minimum lot area: >= 2 acres · minimum lot width: >= 200 ft
“zoning setbacks, area and height requirements for towns under portage county zoning ordinance min floor min lot area min lot min side area (sq ft) (sq ft) width (ft) yard (ft) 720 (g) 2 acres 200 25 (b)”
“r2 single family 35 720 20,000 100 10 (b) 25 (b) 2,800 (l)(m)”
R2 Single Family district land inside the Town of Stockton under Portage County zoning
maximum building height: <= 35 ft
“r2 single family 35 720 20,000 100 10 (b) 25 (b) 2,800 (l)(m)”
“zoning district r1 rural & urban fringe max height (ft) (a) 35”
Placing campers (RVs) on private land inside the Town of Stockton
“placement of campers in agricultural, conservancy and/or rural limited zoning districts (prohibited in other districts)”
Camper placement on private land inside the Town of Stockton (the only camping use the county addresses)
“placement of campers in agricultural, conservancy and/or rural limited zoning districts (prohibited in other districts)”
Private sewage (septic) systems on land inside the Town of Stockton
“for decades, under state statute, the state of wisconsin has delegated the responsibility of regulation of powts (private onsite waste treatment systems) also known as septic systems, to wisconsin counties.”
New homes and home additions that add bedrooms or disrupt the building sewer, inside the Town of Stockton
“a sanitary permit is required before a zoning permit can be issued for new homes and additions to homes which increase the number of bedrooms or disrupt the existing building sewer line.”
Newly installed septic systems inside the Town of Stockton
“services provided by the portage county on-site waste section include: administration of the private sewage system ordinance, including issuing sanitary permits for new septic systems. and inspection of newly installed systems.”
Non-plumbing sanitation such as privies or outhouses on land inside the Town of Stockton
“homeowners are allowed to apply for non-plumbing sanitary permits such as privies or outhouses.”
Land divisions (county plats and minor or major subdivisions) inside the Town of Stockton
“stormwater plan review for county plats, major subdivisions, and possibly minor subdivisions $250 approved 5-23-17 effective 5-24-17”
Structural changes to buildings in a floodplain inside the Town of Stockton
“structural changes to buildings in a floodplain;”
Short-term rentals and tourist rooming houses in residential, agricultural and neighborhood commercial districts inside the Town of Stockton
“short-term rentals and tourist rooming houses are a permitted use in the residential, agricultural, and the neighborhood commercial zoning districts in all towns under portage county zoning.”
County zoning and sanitary permit fees for projects inside the Town of Stockton (building permit fees are set by the town and not in this schedule)
zoning permit, new home or mobile home on private lot: 200 USD per living unit (asterisked; triple fee if work started before approval) · sanitary permit, conventional system: 400 USD (asterisked) · seasonal camper permit: 50 USD (asterisked)
“conventional system $400* alternate systems (mounds/at grade/igp/fill) $450* holding tanks $500*”
Zoning permit process for projects inside the Town of Stockton
application lead time: >= 2 weeks (before intended start of construction)
“return the completed application to our office at least 2 weeks prior to the intended start of construction.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Stockton or Portage County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Stockton publishes no rule on the point, not that none exists. Portage County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Stockton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.