Portage County, Wisconsin
Town of Sharon is a town in Portage County, Wisconsin. Septic permits inside Town of Sharon come from Portage County (Portage County Planning & Zoning Department - On-Site Waste (POWTS) · (715) 346-1334). 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Portage County page.
Driveway entries onto Town of Sharon roads.
Town-road driveway permit fee: 25 USD
“when the proposed driveway is approved, the applicant will complete the driveway permit and return to the town clerk for completion with $25 permit fee.”
Town of Sharon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Land inside Sharon town, which the County's zoning-procedure document expressly lists among towns requiring a Portage County zoning permit.
“If you live in the Towns of Alban, Almond, Amherst, Belmont, Buena Vista, Carson, Dewey, Eau Pleine, Hull, Lanark, Linwood, New Hope, Plover, Sharon, and Stockton, you will need to secure a Zoning Permit before proceeding with your project.”
County-zoned parcels inside Sharon town.
“Zoning consists of two elements, a written code, and a zoning map.”
A3 Low Density Agricultural district inside Sharon town, if the parcel is mapped A3.
minimum floor area: 720 square feet (year-round dwelling) · minimum floor area: 400 square feet (seasonal dwelling)
“720 square feet for year-round dwelling (6 months or more/calendar year), 400 square feet for seasonal dwellings (less than six months calendar year).”
A3 Low Density Agricultural district inside Sharon town, if the parcel is mapped A3.
minimum lot area: 5 acres · minimum lot width: 200 feet
“A3 Low Density Agricultural 35 720 (g) 5 acres 200 25 (b)(f) 25 (b)(f) Unlimited”
A3 Low Density Agricultural district inside Sharon town, if the parcel is mapped A3.
minimum side yard: 25 feet (may vary for buildings which house animals) · minimum rear yard: 25 feet (may vary for buildings which house animals)
“A3 Low Density Agricultural 35 720 (g) 5 acres 200 25 (b)(f) 25 (b)(f) Unlimited”
A3 Low Density Agricultural district inside Sharon town, if the parcel is mapped A3.
maximum building height: 35 feet (unless otherwise specified by §7.1.6.1(C))
“A3 Low Density Agricultural 35 720 (g) 5 acres 200 25 (b)(f) 25 (b)(f) Unlimited”
Placement of campers on land inside Sharon town.
“Placement of campers in Agricultural, Conservancy and/or Rural Limited Zoning Districts (prohibited in other Districts);”
Camper-based temporary camping on land inside Sharon town.
“Campers - Annual Zoning Permit Application Form (PDF)”
Private onsite wastewater treatment systems (POWTS) inside Sharon town.
“(2) these POWTS shall be inspected by the Administrator for compliance with SPS 382, SPS 383, and SPS 384, Wisconsin Administrative Code, other appropriate Wisconsin Statutes and Administrative Codes and this Ordinance.”
New homes and specified home additions using septic inside Sharon town.
“A Sanitary Permit is required before a Zoning Permit can be issued for new homes and additions to homes which increase the number of bedrooms or disrupt the existing building sewer line.”
New and existing POWTS inside Sharon town.
recurring visual inspection interval: per 3 years (within three years of installation and at least every three years thereafter)
“7.9.33 SEPTIC TANK MAINTENANCE PROGRAM (1) All new and existing POWTS shall be visually inspected within three years of the date of installation and at least once every three years thereafter.”
Private well construction inside Sharon town.
“Private Well Construction: Contact your well installer or the Wisconsin Department of Natural Resources (DNR) to obtain a required Well Notification Number and pay the associated fee prior to well construction.”
Subdivision activity inside Sharon town.
“Portage County’s Zoning Section Administers the following Portage County Ordinances: Zoning; Wellhead Protection; Wireless Telecommunication Facility; Subdivision; Open Space Design Option; Floodplain Zoning; Shoreland Zoning; and Non-Metallic Mining Reclamation.”
Floodplain development inside Sharon town.
“Structural changes to buildings in a floodplain;”
County zoning, sanitary, subdivision, and related permit processes that apply inside Sharon town.
“Include Fee payment– depends on work being proposed. (see Fee Schedule)”
County zoning permit applications for projects inside Sharon town.
application lead time: >= 2 weeks (before intended construction start)
“Return the completed application to our office at least 2 weeks prior to the intended start of construction.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Sharon or Portage County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Sharon publishes no rule on the point, not that none exists. Portage County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Sharon means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.