Polk County, Wisconsin
Town of Garfield is a town in Polk County, Wisconsin. Town of Garfield adopts its own zoning, so inside its limits Town of Garfield’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Polk County page.
Erection, addition or alteration of any building or structure inside Garfield town
“No construction, alteration or addition to any building or structure shall commence before a building permit, land use permit or any other zoning permit, which may be required by this or any other ordinance, has been issued.”
Land inside Garfield town limits (Polk County, WI), administered under the town's own zoning ordinance
“This Ordinance shall divide the Town into districts and establish regulations in regard to location, erection, construction, reconstruction, alteration and use of structures and land.”
Zoning districts inside Garfield town
“divided into the following five (5) zoning districts: 1. Residential 2. Agricultural 3. Agricultural – Residential 4. Conservation 5. Commercial”
Principal residence or farm operation lots in the agricultural district (Article 3 Section E) inside Garfield town
minimum lot area, principal residence or farm operation: >= 20 acres
“The minimum lot area for a principal residence or farm operation shall be twenty (20) acres.”
“Sewered lots. Buildings or other parts of buildings hereafter erected or structurally altered for single or two-family dwelling purposes shall provide a lot area of not less than one (1) acre.”
Building and land-use permit fees inside Garfield town
impact fee: 3021.4 USD · driveway permit: 100 USD · conditional use permit: 450 USD · zoning change permit: 700 USD · variance application: 450 USD
“Building Permits------This fee is determined by our building inspector based on square footage.”
Zoning and building permit application process inside Garfield town
“Applications for building and land use permits shall be submitted to the Zoning Administrator.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Garfield or Polk County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Garfield publishes no rule on the point, not that none exists. Polk County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Garfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.