Polk County, Wisconsin
Amery is a city in Polk County, Wisconsin. 9 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Polk County page.
New construction and specified building work inside Amery city limits.
“until a permit therefor shall first have been obtained pursuant to this chapter by the owner, or his/her authorized agent”
Plumbing repair or installation in an owner-occupied single-family building inside Amery city limits.
“a property owner may make repairs or installation in a single-family building owned and occupied by him/her as his/her home, provided that a permit is issued”
One- and two-family dwellings inside Amery city limits.
“The Wisconsin Uniform Dwelling Code, Chapters SPS 320 to SPS 325 of the Wisconsin Administrative Code, and subsequent revisions are adopted for municipal enforcement.”
Plumbing work on premises inside Amery city limits.
inspection timing: <= 24 hours (Building Inspector shall inspect or cause the work to be inspected within 24 hours after notification.)
“Upon completion of the plumbing work on any premises, the person doing such work shall notify the Building Inspector before such work is covered up”
A building moved and altered inside Amery city limits.
“No certificate of occupancy shall be issued for said building until the exterior alterations proposed to be made have been completed.”
Construction of a residential building inside Amery city limits.
“No building permit shall be issued for the construction of any residential building until sewer, water, grading and graveling are installed in the streets”
Property proposed for building inside Amery city limits.
“No building permits shall be issued until the subdivision and required improvements are accepted by the City Council.”
Building-permit applications inside Amery city limits.
“Application for a building permit shall be made in writing upon a form furnished by the City Administrator/Clerk-Treasurer”
Amery does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings in the R-2 Two-Family Residential District inside Amery city limits.
maximum building height: <= 35 feet (Or three stories.) · maximum stories: <= 3 stories (Or 35 feet.)
“Building height. Maximum 35 feet or three stories.”
We looked and could not find an official answer yet. Silence is not permission; ask Amery or Polk County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Amery publishes no rule on the point, not that none exists. Polk County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Amery means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.