Outagamie County, Wisconsin
Town of Oneida is a town in Outagamie County, Wisconsin. 6 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Outagamie County page.
New houses (single-family and two-family) built inside the Town of Oneida, permits issued by the Town of Oneida building inspector
single-family new house permit fee (base, includes plumbing, electric, hvac, const, erosion): 850 USD (plus $100 park fund, $35 state seal, $150 new address, $25 culvert (if indicated)) · two-family new house permit fee (base, includes plumbing, electric, hvac, const, erosion): 1050 USD (plus $100 park fund, $35 state seal, $150 new address, $25 culvert (if indicated)) · failure to obtain permit prior to starting work: double fee
“Building permits are required for the following: New Houses:”
“Town building permits are not required for: re-roofing, siding or replacement windows or doors.”
“Town building permits are also not required for the following, however, you should contact the County Planning and Zoning Office at (920) 832-5255 to see if there are county requirements for these items:”
Commercial buildings (new or remodeled) inside the Town of Oneida, as placed in the town page's commercial section; residential inspection sequence is not stated on the page
“Commercial Buildings (new or remodeled) - Call Town Hall for details Permits issued through Town of Oneida/Paul Hermes. Inspections are completed through Department of Safety and Professional Services. District 7.”
Town of Oneida building permit fees
detached residential garage/shed permit fee: 100 USD (plus $1.00 per 100 sq ft over 1,000 sq ft, not including mechanical)
“Single Family including Plumbing, Electric, HVAC, Const, Erosion = $850 + $100 Park Fund + $35 State Seal + $150 new address + $25 culvert (if indicated)”
Building permit applications for Town of Oneida building permits
“Once application is received by the Town Clerk it will be reviewed by Building Inspector, approved and fee will be issued.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Oneida or Outagamie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Oneida publishes no rule on the point, not that none exists. Outagamie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Oneida means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.