Outagamie County, Wisconsin
Village of Bear Creek is a village in Outagamie County, Wisconsin. Village of Bear Creek adopts its own zoning, so inside its limits Village of Bear Creek’s rules apply, not the county’s. Septic permits inside Village of Bear Creek come from Village of Bear Creek. 13 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Outagamie County page.
Buildings and structures inside Bear Creek village limits.
“No building of any kind shall be moved within or into the Village, and no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the Village, except as herein provided, until a permit therefor shall first have been obtained by the owner, or his authorized agent, from the Building Inspector.”
One- and two-family dwellings inside Bear Creek village limits.
“State code adopted. The Administrative Code provisions describing and defining regulations with respect to one- and two-family dwellings in Chs. SPS 320 to SPS 325 and Ch. SPS 327, Wis. Adm. Code, are hereby adopted and by reference made a part of this chapter as if fully set forth herein.”
Permitted buildings inside Bear Creek village limits.
“The builder shall notify the Building Inspector when ready for inspections, and the Building Inspector shall inspect within 48 hours of notice all buildings at the following stages of construction:”
New buildings, additions, and alterations inside Bear Creek village limits.
“No building, or part thereof, shall be occupied until a certificate of occupancy has been issued, nor shall any building be occupied in any manner which conflicts with the conditions set forth in the certificate of occupancy.”
Land inside Bear Creek village limits.
“The Village of Bear Creek is hereby divided into zoning districts as shown upon a map designated as the Official Zoning Map of the Village of Bear Creek, and made a part of this chapter.”
Private wastewater disposal systems inside Bear Creek village limits where public sanitary sewer is unavailable under § 278-2D.
“Before commencement of construction of a private wastewater disposal system the owner(s) shall first obtain a written permit signed by the approving authority.”
Private wastewater disposal systems inside Bear Creek village limits where public sanitary sewer is unavailable under § 278-2D.
“The approving authority shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the approving authority when the work is ready for final inspection, and before any underground portions are covered.”
Wastewater disposal inside Bear Creek village limits.
“Where a public sanitary sewer is not available under the provisions of § 278-2D, the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this section.”
Residential construction inside Bear Creek village limits.
public sewer distance from property line: <= 100 feet (Connection is required within 90 days after official notice for qualifying property.)
“The owner(s) of all houses, buildings, or properties used for human occupancy, employment, recreation, or other purposes, situated within the Village and abutting on any street, alley, or right-of-way in which there is now located or may in the future be located a public sanitary sewer of the Village, is hereby required at the owner's (owners') expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this chapter, within 90 days after date of official notice to do so, provided that said public sewer is within 100 feet (30.5 meters) of the property line.”
Driveways crossing or through sidewalks or curbs inside Bear Creek village limits.
“Unless otherwise especially permitted by resolution of the Village Board, upon written application giving the reason therefor, no person shall construct, repair or reconstruct any driveway across or through any sidewalk or curbing without having first obtained a permit from the Village Board.”
Private wastewater and driveway permits inside Bear Creek village limits.
“Refer to the Village Fee Schedule for the amount of permit fee.”
Building permits inside Bear Creek village limits.
“Application for a building permit shall be made, in writing, upon a form furnished by the Building Inspector and shall state the name and address of the owner of the land and also the owner of the building, if different, the legal description of the land upon which the building is to be located, the name and address of the designer, the use to which said building is to be put, and such other information as the Building Inspector may require.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Bear Creek or Outagamie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Bear Creek publishes no rule on the point, not that none exists. Outagamie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Bear Creek means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.