Oneida County, Wisconsin
Town of Schoepke is a town in Oneida County, Wisconsin. Septic permits inside Town of Schoepke come from Oneida County. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Oneida County page.
Town of Schoepke does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family dwellings, including stick-built, modular, and manufactured-home installations, inside Schoepke town.
“A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
New one- and two-family dwellings, including manufactured-home installations, inside Schoepke town.
“The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
New one- and two-family dwellings permitted under the UDC inside Schoepke town.
“The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
Land inside the Town of Schoepke, an unincorporated Oneida County township.
“Zoning regulations apply in the unincorporated areas of all 20 townships, except those lands in the Towns of Enterprise, Monico, and Sugar Camp which are greater than 1,000 feet from a lake or 300 feet from a river or stream.”
Parcels mapped Residential and Farming District 4 inside Schoepke town.
“The minimum lot size requirements for the Residential and Farming District are contained in Appendix A, which is incorporated herein by reference.”
“The minimum lot size requirements for the Single Family Residential District are contained in Appendix A, which is incorporated herein by reference.”
RV, camping-trailer, motor-home, and park-model placement inside Schoepke town.
“The placement of a recreational vehicle, camping trailer, motor home or park model on a parcel must comply with applicable setbacks, the minimum lot area and dimensional requirements for uses and zoning districts in Appendix A.”
Manufactured-home parks inside Schoepke town in Residential and Farming District 4.
“Mobile home, manufactured home and house trailer parks, only in accordance with the provisions of section 9.52, and provided they otherwise comply with this ordinance”
Private onsite wastewater systems inside Schoepke town.
“The requirements of this chapter shall apply to all geographic areas of Oneida County.”
An RV used as a dwelling more than five consecutive days inside Schoepke town when connected to potable water and/or electric.
“Obtain a sanitary permit for a private on-site waste water treatment system if the recreational vehicle is provided a connection to potable water and/or electric.”
Newly constructed structures or structures requiring a POWTS reconnection permit inside Schoepke town.
“The POWTS or nonplumbing sanitation system for newly constructed structures or structures requiring a reconnection permit shall be installed, inspected, and approved before the structure may be occupied.”
Structures or premises inside Schoepke town using nonplumbing sanitation.
“A nonplumbing sanitation system may be permitted only when the structure or premises served by the nonplumbing sanitation system is not provided with an indoor plumbing system. If plumbing is installed in the structure or running water is supplied to the structure, an acceptable method of sewage disposal other than, or in addition to, a nonplumbing sanitation system must be provided.”
New non-high-capacity private wells inside Schoepke town.
“Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
A Schoepke-town structure or premises served by a POWTS when DNR-approved public sewer becomes available.
connection deadline after public sewer availability: <= 1 year (Only when DNR-approved public sewer becomes available to the structure or premises served.)
“When public sewers approved by the Department of Natural Resources become available to the structure or premises served, the POWTS shall be disconnected within one year and a connection made to the public sewer.”
Land divisions inside Schoepke town.
“§ 15.10 Land Divisions Governed by This Chapter.”
Oneida County zoning-permit applications for land inside Schoepke town.
“The application fee as periodically designated by the County Board shall be paid when the application is filed.”
Oneida County zoning-permit applications for land inside Schoepke town.
completeness review: <= 15 working days (Measured from filing and fee payment; a required sanitary permit must have issued.) · approval or denial after complete application: <= 15 working days (Measured after the application is deemed complete.)
“Within 15 working days of the date a zoning application is deemed complete, the zoning administrator shall deny or approve the zoning permit application and, if the application is approved, issue a written permit with or without conditions.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Schoepke or Oneida County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Schoepke publishes no rule on the point, not that none exists. Oneida County’s page lists the county offices to call.