Oneida County, Wisconsin
Town of Pelican is a town in Oneida County, Wisconsin. Town of Pelican adopts its own zoning, so inside its limits Town of Pelican’s rules apply, not the county’s. Septic permits inside Town of Pelican come from Oneida County. 10 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Oneida County page.
Land inside the Town of Pelican, where Oneida County administers zoning.
“Zoning regulations apply in the unincorporated areas of all 20 townships, except those lands in the Towns of Enterprise, Monico, and Sugar Camp which are greater than 1,000 feet from a lake or 300 feet from a river or stream.”
Private onsite wastewater treatment systems inside the Town of Pelican.
“The requirements of this ordinance shall apply to all geographic areas of Oneida County.”
POWTS and non-plumbing sanitation systems inside the Town of Pelican.
“Every POWTS shall require a separate application and sanitary permit pursuant to Wisconsin Statutes 145.19.”
New POWTS or non-plumbing sanitation systems serving structures inside the Town of Pelican.
“The POWTS or non-plumbing sanitation system for newly constructed structures or structures requiring a reconnection permit shall be installed, inspected, and approved before the structure may be occupied.”
Non-plumbing sanitation systems inside the Town of Pelican.
“A non-plumbing sanitation system may be permitted only when the structure or premises served by the non-plumbing sanitation system is not provided with an indoor plumbing system.”
Structures inside the Town of Pelican served by a POWTS when public sewer becomes available.
connection deadline: <= 1 year (After public sewers approved by DNR become available.)
“When public sewers approved by the Department of Natural Resources become [...] available to the structure or premises served, the POWTS shall be disconnected within one year and a connection made to the public sewer.”
Sanitary permitting for structures inside the Town of Pelican.
“A sanitary permit shall be obtained by the property owner, his agent or contractor, in the name of the property owner, prior to the installation, establishment or construction of any structure which requires a POWTS or non-plumbing sanitation system.”
Town of Pelican does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family dwellings inside the Town of Pelican.
“All municipalities are required to issue a Uniform Dwelling Code Permit for new one and two family dwellings.”
New one- and two-family dwellings inside the Town of Pelican.
“All municipalities are required to issue a Uniform Dwelling Code Permit for new one and two family dwellings.”
New private wells inside the Town of Pelican.
well construction notification fee: 50.5 USD (Well Construction Notification; fee is stated as nonrefundable and nontransferable.)
“Wisconsin law requires that a property owner provide advance notice to DNR before construction of any new private well that is not a high capacity well, and advance notice of any heat exchange drillhole construction (geothermal system) that does not require a written DNR approval.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pelican or Oneida County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pelican publishes no rule on the point, not that none exists. Oneida County’s page lists the county offices to call.