Marathon County, Wisconsin
Town of Wausau is a town in Marathon County, Wisconsin. Town of Wausau adopts its own zoning, so inside its limits Town of Wausau’s rules apply, not the county’s. 18 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Marathon County page.
Building work inside the Town of Wausau.
new-home bond: 1000 USD (Required by the town board for all new-home construction projects.)
“In no event shall work commence on any building prior to a building permit being issued.”
New one- and two-family dwellings inside the Town of Wausau.
“Administrative Code provisions describing and defining regulations with respect to new one (1) and two (2) family dwellings in Comm. 20-25 of the Wisconsin Administrative Code are hereby adopted by the Town of Wausau, Marathon County and by reference made a part of this ordinance as if fully set forth herein.”
New residences inside the Town of Wausau.
inspection response: <= 48 hours (Except final inspection.)
“It shall be the responsibility of the applicant who is building a new residence to request inspections of the Building Inspector at certain stages of progress during construction.”
Buildings and structures inside the Town of Wausau.
“A building or structure cannot be occupied until a final inspection is completed and a certificate of occupancy is issued.”
Land inside the Town of Wausau.
“This Chapter shall be known as, referred to or cited as the TOWN OF WAUSAU ZONING ORDINANCE.”
Residential buildings in the R-1/20 Residential District.
minimum living floor area: >= 1000 square feet
“Buildings used in whole or in part for residential purposes that are hereafter erected, moved, or structurally altered shall have a minimum of one thousand (1,000) square feet of floor area dedicated to living space.”
R-1/20 Residential District.
minimum lot area: >= 20000 square feet
“Lot area. The minimum lot area shall be twenty thousand (20,000) square feet.”
R-1/20 Residential District.
maximum building lot coverage: <= 30 percent (Includes accessory buildings.)
“No building, together with its accessory buildings, shall occupy in excess of thirty percent (30%) of the area of any lot.”
R-1/20 Residential District.
maximum building height: <= 35 feet (Except as otherwise provided in Chapter 17.)
“Height, except as otherwise provided in this chapter no building or structure shall exceed a height of thirty-five (35) feet.”
Permanent living or sleeping in a recreational vehicle inside the Town of Wausau.
“At no time shall a recreational vehicle be used for permanent living, sleeping, materials storage or other purpose. No recreational vehicle shall be permanently connected to water, gas, electric, or sanitary sewer service.”
Owner or immediate-family use of tents, motor homes, self-contained campers, or camping trailers in the A-1/80 Agricultural District.
maximum temporary occupancy: <= 60 days per calendar year (Owner or immediate family.) · approval threshold: > 30 days (Town Board or designee approval required.)
“Tents, motor homes, and self-contained campers or camping trailers may be occupied by the owner or their immediate family on a temporary basis, not to exceed sixty (60) days in a calendar year. Approval by the Town Board or its designee is required if the use is to exceed thirty (30) days. (Amended 3/11/2024)”
Manufactured homes qualifying under the Town definition inside the Town of Wausau.
“For purposes of this Chapter, a manufactured home shall be treated the same as a single-family residence and, where appropriate, a two (2)-family residence.”
Separate dwelling use of an accessory building in the AT-1/40 Agricultural Transition District.
“Accessory buildings, including private kennels and private garages and buildings clearly incidental to the residential use of the property, provided, however, that no accessory building may be used as a separate dwelling unit.”
Land divisions and plats within the Town of Wausau.
“All land divisions shall be created by use of a certified survey map (CSM) and a town land division application must be completed.”
A proposed driveway intersecting a Town road inside the Town of Wausau.
“If the proposed driveway will intersect a town road, the applicant shall obtain a Driveway/Highway Access Permit from town board, subject to the requirements in this section.”
Bed-and-breakfast establishments and tourist rooming houses in the AT-1/40 Agricultural Transition District.
“Bed and breakfast establishment and tourist rooming house subject to Wis. Stats. Chapter 254.”
Town building and zoning permits.
“Permit fees are established within the contract of the Building Inspector for erection of new homes. Zoning permit fees are established and approved by the town board.”
Building permits inside the Town of Wausau.
“No person shall conduct or begin construction for any project requiring a permit for such actions without first applying for a permit and payment of such permit fees established by the town board.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Wausau or Marathon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Wausau publishes no rule on the point, not that none exists. Marathon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Wausau means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.