Marathon County, Wisconsin
Town of Day is a town in Marathon County, Wisconsin. Town of Day adopts its own zoning, so inside its limits Town of Day’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Marathon County page.
Buildings, structures, and land uses regulated by the Day zoning code.
“Conduct inspection of buildings, structures, and use of land to determine compliance with the terms of this Code;”
Structures, land, air space, and surface and subsurface waters inside the Town of Day, Marathon County, Wisconsin.
“TOWN OF DAY ZONING CODE ORDINANCE NO. 2026-02 ADOPTED MARCH 18, 2026 EFFECTIVE DATE: APRIL 1ST, 2026”
Zoning districts inside Day town.
district classifications: R-1, R-2, A, C, I
“There are hereby established five (5) district classifications: Single-Family residential, Multiple-Family residential, Agricultural, Commercial and Industrial.”
Agricultural buildings in the General Agricultural (A) District inside Day town.
maximum building height: No Maximum (Agricultural buildings in A District only.)
“Maximum Building Height. i Agricultural Buildings. No Maximum.”
Manufactured homes inside Day town when installed and treated under the code as single- or two-family residences.
“For purposes of this Code, a "manufactured home" shall be treated the same as a "single-family residence" and, where appropriate, a "two-family residence".”
Septic tank systems and holding tanks inside Day town.
septic system visual-inspection interval: per 3 years (Holding tanks are pumped when full.)
“This expanded program requires property owners to have their holding tanks pumped when full or their septic tank systems maintained at least once every 3 years by having a plumber, pumper, or other licensed professional visually inspect the system to determine the condition of the septic tank and if pumping is needed.”
Town zoning-permit applications inside Day town.
“No permit pertaining to the use of land or buildings shall be issued by any officer, department, or employee of the Town unless the application for such permit has been examined by the Zoning Administrator and has affixed to it a certificate of the Zoning Administrator, indicating that the proposed building or structure complies with all the provisions of this Code.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Day or Marathon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Day publishes no rule on the point, not that none exists. Marathon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Day means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.