Manitowoc County, Wisconsin
Town of Maple Grove is a town in Manitowoc County, Wisconsin. Septic permits inside Town of Maple Grove come from Manitowoc County (Manitowoc County Planning and Zoning Department - Sanitary (POWTS)). 13 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Manitowoc County page.
New homes inside Maple Grove town.
building permit fee: 1100 USD (New-home guideline fee payable to Town of Maple Grove.)
“Obtain and complete the Building Permit Application from the Town of Maple Grove. Form can be found on the Town website: maplegrovewi.gov”
Work within a Town right-of-way for a new home inside Maple Grove town.
“If necessary, obtain and complete the To Perform Work Within Right-of-Way Application from the Town of Maple Grove.”
Town building-permit submissions for new homes inside Maple Grove town.
new-home building permit fee: 1100 USD
“Fee: $1,100.00 Check payable to Town of Maple Grove”
New-home building permit process inside Maple Grove town.
building-inspector plan-approval period: <= 10 days (After submission.)
“Once submitted, Building Inspector has ten (10) days to approve plans.”
Town of Maple Grove does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
General Agriculture (GA) district inside Maple Grove town; GA permits single-family residences.
minimum lot size: >= 10 acres (Exclusive of road right-of-way.) · minimum lot width: >= 150 feet
“The minimum lot size is 10 acres, exclusive of road right-of-way. The minimum lot width is 150 feet.”
General Agriculture (GA) district inside Maple Grove town.
principal and conditional-use structure setback: >= 25 feet · accessory-structure setback: >= 10 feet
“The minimum setback for principal and conditional use structures is 25 feet. The minimum setback of accessory structures is 10 feet.”
General Agriculture (GA) district inside Maple Grove town.
maximum structure height: <= 60 feet (Unless a different maximum height is permitted by section 8.25 or chapters 20, 24, or 25.)
“The maximum height for any structure is 60 feet, unless a different maximum height is permitted by sec. 8.25 or chs. 20, 24, or 25. However, all structures are subject to the Airport Approach Protection Ordinance.”
Recreational vehicles on private land inside Maple Grove town under County general zoning.
residential-parcel temporary occupancy: <= 14 days (No more than 30 days total in a calendar year.)
“If it is located on a residential parcel, it may be used to provide living space or overnight accommodations for up to 14 days at a time, but for no more than a total of 30 days in a calendar year.”
Manufactured homes inside Maple Grove town under County general zoning.
small manufactured-home threshold: < 400 square feet (Must be located within a manufactured-home park.)
“Any manufactured home with less than 400 square feet of living space must be located within a manufactured home park.”
Private sewage systems serving development inside Maple Grove town.
“Copy of Sanitary Permit from Manitowoc County”
Installation, modification, or land-use change connected to a private sewage system inside Maple Grove town.
“No person may install, locate, move, reconstruct, extend, enlarge, alter, convert, or modify a private sewage system or change the land use connected to the system, unless the owner of the property on which such private sewage system is located, or is to be located, holds a valid sanitary permit.”
Nonexisting tracts of land under 15 acres inside Maple Grove town.
parcel-size threshold: < 15 acres (Parcel is not an existing tract of land.)
“If the parcel is not an existing tract of land and is less than 15 acres, a Certified Survey Map is required.”
Vacation-home rentals inside Maple Grove town in districts where the County ordinance allows them by conditional-use permit.
maximum overnight occupants: <= 12 persons (Also limited to two persons per bedroom plus two additional persons per structure.)
“Occupancy is limited to no more than 2 persons per bedroom, plus 2 additional persons, per structure, and may not exceed a total of 12 persons.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Maple Grove or Manitowoc County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Maple Grove publishes no rule on the point, not that none exists. Manitowoc County’s page lists the county offices to call.