Zoning, building permits and septic rules in Town of Peck, Wisconsin

Town of Peck is a town in Langlade County, Wisconsin. Septic permits inside Town of Peck come from the county and state together. 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Langlade County page.

Answers from the rulebook for Town of Peck

Town of Peck’s own rules

  • Minimum lot sizeSpecified

    New lots created inside Peck town under Peck's own land-division ordinance.

    • The stated standard applies to creating a new lot.
    • In some instances, a one-acre lot may be created if it is pre-planned to show the septic-system site, alternate septic site, and proposed structures.
    • Any lot created below 10 acres requires a certified survey.

    minimum new-lot size: 3 acres (One-acre lots may be created in some instances when pre-planned as stated by the county FAQ.)

    “The minimum parcel size for creating a new lot is 2 acres, except for the Townships of Antigo,Neva & Peck which have their own ordinance that require 3 acre minimum sized lots.”
  • Subdividing landRegulated (with conditions)

    Creation of new lots inside Peck town.

    • Peck has its own ordinance requiring three-acre minimum sized lots for creation of a new lot.
    • In some instances, one-acre pre-planned lots may be created as described by the county.
    • Lots created below 10 acres require a certified survey.

    minimum new-lot size: 3 acres (One-acre pre-planned lots may be created in some instances.)

    “In some instances, one (1) acre lots may be created if it is a pre-planned lot showing where the septic system site, alternate septic site, and proposed structures are laid out. Any lot created less than 10 acres in size requires a certified survey.”

Rules another office applies inside Town of Peck

Town of Peck does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    Construction inside Peck town if the parcel is in a zoned area administered by Langlade County.

    • The source applies to all zoned areas of Langlade County.
    • Small accessory structures with assessed value below $1,000, such as small storage sheds, are exempt but must comply with setback and other requirements.

    accessory-structure assessed-value exemption threshold: < 1000 USD (Small accessory structures such as small storage sheds remain subject to setback and other requirements.)

    “A permit for the construction of a building, addition, or other structures (including porches and decks) is required in all zoned areas of the county.”
  • Building code adoptedAdopted (with conditions)

    One- and two-family dwellings inside Peck town under Wisconsin's Uniform Dwelling Code requirement.

    • Applies to all one- and two-family dwellings.
    • Langlade County states that it contracted with Duff Leaver Inspections to issue UDC permits and perform construction inspections.
    “The State of Wisconsin also requires a Uniform Dwelling Code (UDC) permit and inspections for all one and two-family dwellings.”
  • InspectionsRequired

    One- and two-family dwellings inside Peck town subject to Wisconsin UDC.

    • The requirement is for all one- and two-family dwellings.
    • Langlade County's contractor performs the required inspections during construction.
    “The county has contracted with Duff Leaver Inspections to issue UDC permits & perform the required inspections during construction.”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes inside Peck town where stick-built homes are permitted under applicable county zoning.

    • The home must be in a zoning district in which stick-built homes are permitted.
    • All homes must be on permanent foundations, tied down, and skirted.
    “Manufactured homes are allowed in the same zoning districts that stick-built homes are permitted. All homes must be placed on permanent foundations, tied down, and skirted.”
  • Who permits septicMixed (with conditions)

    Private onsite wastewater systems inside Peck town, as premises within Langlade County.

    • State sanitary permits are issued by Wisconsin, with Langlade County able to act as agent in certain situations.
    • County sanitary permits are issued by the Langlade County Land Records & Regulations Department.
    “A state sanitary permit is issued by the State of Wisconsin, with the Langlade County Land Records & Regulations Department able to act as an agent in certain situations. A county sanitary permit is issued by the Langlade County Land Records & Regulations Department.”
  • Septic permitRequired

    Structures or premises inside Peck town intended permanently or intermittently for human habitation or occupancy that are not served by public sewer.

    • A sanitary permit must be obtained before a building permit and before construction starts.
    • Appropriate fees must be paid.
    • Systems serving one- or two-family residences with suitable conventional in-ground-system or holding-tank soils may receive a county permit without state plan review.
    • Specified mound, pressure, at-grade, multi-unit, commercial, and industrial systems require Wisconsin DSPS plan approval before the county issues the permit.
    “A sanitary permit is required for these systems to ensure that wastes do not cause a public health hazard. A sanitary permit must be obtained prior to a building permit, prior to the start of construction, and all appropriate fees must be paid.”
  • Permit processPublished (with conditions)

    Sanitary-permit process for eligible premises inside Peck town.

    • A certified soil tester must perform the soil test.
    • Completed plans and soil tests must be submitted with appropriate fees.
    • Once approved, the permit is valid for two years from issuance and usually may be renewed.

    sanitary permit validity: 2 years (In most cases, the permit can be renewed.)

    “Once approved, the sanitary permit is valid for 2 years from the date of issuance and in most cases, can be renewed.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Peck or Langlade County directly.

  • Owner-builder exemption — Owner-built residential construction inside Peck town.
  • Certificate of occupancy — Occupancy of buildings inside Peck town.
  • Local zoning — Land inside Peck town, Wisconsin.
  • Zoning districts — Land inside Peck town.
  • Minimum dwelling size — Dwellings inside Peck town.
13 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Peck publishes no rule on the point, not that none exists. Langlade County’s page lists the county offices to call.

← All of Langlade County: county rules, score and offices