Jefferson County, Wisconsin
Town of Hebron is a town in Jefferson County, Wisconsin. 7 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Jefferson County page.
Town of Hebron does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
A-3 Agricultural/Rural Residential-zoned land inside Hebron town.
minimum lot area: 1 acre (A-3 Agricultural/Rural Residential district)
“minimum lot area. one (1) acre. [amended 2/8/00, ord. no. 99-28] minimum width. one hundred fifty (150) feet. minimum depth. two hundred (200) feet.”
A-3 Agricultural/Rural Residential-zoned land inside Hebron town.
maximum lot coverage by buildings: <= 30 percent (principal and accessory structures in A-3 district)
“maximum lot coverage by buildings. maximum lot coverage by principal and accessory structures not to exceed thirty (30) percent of existing lot area.”
A-3 Agricultural/Rural Residential-zoned land inside Hebron town.
maximum building height: <= 35 feet (except Section 11.07(a)2 height standards for agricultural structures)
“maximum building height. thirty-five (35) feet, except see section 11.07(a)2 for height standards for agricultural structures.”
Camping inside Hebron town on land subject to Jefferson County zoning.
“camping is prohibited in all areas except in campgrounds and parks where camping is permitted.”
Mobile homes on foundations in A-3 Agricultural/Rural Residential-zoned land inside Hebron town.
“principal uses. [12/21/82, ord. no. 11] a. single family dwelling. b. mobile homes on foundations.”
Tourist rooming houses in A-3 Agricultural/Rural Residential-zoned land inside Hebron town.
“g. tourist rooming house (as defined in chapter dhs 195 in the wisconsin administrative code) [11/10/09, ord. 2009-19]”
Jefferson County zoning and sanitary permits affecting land inside Hebron town.
after-the-fact permit minimum fee: >= 100 USD (double permit fee applies)
“permit fee must accompany application! a double permit fee will be charged for all after-the fact permits (minimum fee of $100).”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Hebron or Jefferson County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Hebron publishes no rule on the point, not that none exists. Jefferson County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Hebron means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.