Iron County, Wisconsin
Town of Kimball is a town in Iron County, Wisconsin. Septic permits inside Town of Kimball come from Iron County. 12 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Iron County page.
Town of Kimball does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Zoning districts in Iron County Title 9 that would apply inside Kimball town limits if the town board approved Title 9
“section 9.4.1 r-1 residential district. (a) purpose. this district provides for one- (1) family and two- (2) family year-round residential development”
R-1 residential district lots inside Kimball town limits, if Iron County Title 9 applies there
minimum lot area with public sewer: >= 15000 sq ft (footnote *2 not read) · minimum lot area without public sewer: >= 60000 sq ft (footnote *6 not read)
“section 9.4.14 zoning schedule, non-shoreland dimensional requirements building height limit required lot area(sq ft) with public sewer without public sewer r-1 35 rr-1 35 r-2 35 r-3 35”
“section 9.4.14 zoning schedule, non-shoreland dimensional requirements building height limit required lot area(sq ft) with public sewer without public sewer r-1 35 rr-1 35 r-2 35 r-3 35”
A-1 primary agricultural district buildings inside Kimball town limits, if Iron County Title 9 applies there
building height limit (A-1): <= 35 feet (listed structures may exceed with county zoning committee approval)
“section 9.4.14 zoning schedule, non-shoreland dimensional requirements building height limit required lot area(sq ft) with public sewer without public sewer r-1 35 rr-1 35 r-2 35 r-3 35”
“section 9.4.14 zoning schedule, non-shoreland dimensional requirements building height limit required lot area(sq ft) with public sewer without public sewer r-1 35 rr-1 35 r-2 35 r-3 35”
Private sewage systems on land inside Kimball town limits, if Iron County Title 9 applies there
“the zoning administrator shall act as the iron county issuing agent and is hereby assigned the duties of administering the private sewage system program.”
Installing a private sewage system on land inside Kimball town limits, if Iron County Title 9 applies there
sanitary permit validity: 2 years (renewable for similar periods)
“no person may install a private sewage system unless the owner of the property on which the private sewage system is to be installed holds a valid sanitary permit.”
Private sewage systems installed on land inside Kimball town limits, if Iron County Title 9 applies there
“(g) inspection. (1) the issuing agent shall inspect or cause the inspection of all private sewage systems after construction, but before backfilling”
Buildings with a private waste disposal system on land inside Kimball town limits, if Iron County Title 9 applies there
“the county zoning administrator shall not hereafter authorize a building to be erected, structurally altered, or relocated which has a private waste disposal system unless the plans for the system have been reviewed in accordance with the provisions of the iron county sanitary code, and a sanitary permit has been issued.”
Lots created after Title 9 adoption inside Kimball town limits, if Iron County Title 9 applies there
“(c) lots created after adoption of this chapter and which are not served by public sewer systems shall meet minimum area requirements of the iron county sanitary code and the iron county subdivision control ordina”
Sanitary permit fees for land inside Kimball town limits, if Iron County Title 9 applies there
“(e) permit fees. the fee for sanitary permits shall be as established by resolution of the iron county board of supervisors.”
Sanitary permit application process for land inside Kimball town limits, if Iron County Title 9 applies there
“(3) application process. (a) the applicant shall submit the completed sanitary permit application to the issuing agent.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Kimball or Iron County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Kimball publishes no rule on the point, not that none exists. Iron County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Kimball means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.